Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on December 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Potter Creek Pump Station Upgrade Project

Closed
202406State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The project involves the demolition and removal of approximately 110 linear feet of 12-inch steel pipe and 70 linear feet of 24-inch steel pipe, along with the relocation of an existing steel farm gate. New pipe installations include roughly 114 linear feet of 30-inch steel pipe, 8 linear feet of 24-inch pipe, 24 linear feet of 18-inch pipe, and 27 linear feet of 12-inch pipe. The scope also encompasses the installation of three 18-inch butterfly valves, three combination sewage air valves, and a flanged magnetic flow meter. Additionally, the work involves furnishing and installing a precast meter vault and a cast-in-place concrete dissipation structure, as well as filling and compacting around 200 cubic yards of conveyance channel and placing approximately 30 cubic yards of 18-inch riprap around the dissipation structure. This contract is part of the Potter Creek Pump Station Upgrade Project, issued by the Stockton East Water District in California, with a solicitation number of 202406. The project is estimated to be valued between $500,000 and $1,000,000, with responses due by January 14, 2025. The primary point of contact is John Van, reachable via email at [email hidden] or by phone at [phone hidden]. The project aims to enhance the infrastructure of the pump station, ensuring improved conveyance and flow management within the water district’s system.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 1, 2024 to Jan 14, 2025. The notice title changed. NAICS code changed from 115310 to 237110. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Stockton East Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
Demolishing and removing approximately 110 LF 12” Steel Pipe and 70 LF 24” Steel Pipe. Relocation of an existing Steel Farm Gate. Furnishing and installing approximately 114 LF 30” Steel Pipe, 8 LF 24” Steel Pipe, 24 LF 18” Steel Pipe, and 27 LF 12” Steel Pipe. Furnishing and installing three (3) 18” Butterfly Valves, three (3) Combination Sewage Air Valves, and one (1) flanged Magnetic Flow Meter. Furnishing and installing one (1) Precast Meter Vault and one (1) Cast-in-place Concrete Dissipation Structure. Filling and compacting approximately 200 CY of Conveyance Channel. Placing approximately 30 CY 18” Riprap around Concrete Dissipation Structure.

More opportunities from California → Stockton East Water District

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS