Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 31, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Power Purchase Agreement RFI

Closed
W912DY-18-T-PPA1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a pool of prequalified energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors finance, own, and operate the systems with no upfront capital required from state agencies. Projects will be managed under long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity sold to host facilities at a fixed price per kilowatt hour. Systems are categorized by size into Class 1 (under 0.50 MW), Class 2 (0.51 MW to 10.0 MW), and Class 3 (over 10.0 MW). To qualify for the vendor pool, respondents must pass a comprehensive evaluation of their technical qualifications, financial strength, and regulatory compliance. Mandatory requirements include providing a California Secretary of State Certificate of Status, a Darfur Contracting Act Certification, and a veracity statement. Vendors must hold appropriate licensing, such as C-10 Electrical or C-46 Solar certifications, and provide evidence of adequate bonding capacity and creditworthiness from recognized rating agencies. Additionally, a commitment letter from financing partners is required. Qualified vendors will then be eligible to bid on specific future projects through subsequent Requests for Proposals. Responses are due by December 23, 2026, and must be submitted in both hard copy and electronic formats.
California Department of General Services

POSTED

14 days ago

DEADLINE

in 2 months
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

26 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

26 days ago

DEADLINE

N/A

General Info

NAICS

221114 - Solar Electric Power Generation

Place of Performance

Joint Base McGuire/Dix/Lakehurst, TRENTON, NJ, 08641, USA

Set-Aside

NONE

Documents

4

AMD_01_JBMDL_PPA_RFI_Questions_with_Answers.pdf

PDF

AMD_02_JBMDL_PPA_RFI_Questions_with_Answers.pdf

PDF

AMD_03_JBMDL_PPA_RFI_Questions_with_Answers.pdf

PDF

JB_MDL_PPA_RFI_with_attachments.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 4:00 PM UTC to 10:00 PM UTC on Jun 1, 2018. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA
Contacts
Matthew S. UrbanicContracting Officer
Deborah RobertsonContract Specialist

Full Description

Show more
Solicitation Number: W912DY-18-T-PPA1 Notice Type: Request for Information Response Date: 01 June 2018 Special Notice Synopsis: This is a Request for Information (RFI). This RFI shall not be construed as a Request for Proposal (RFP), a lease solicitation, or any obligation on the part of the Government. The Government does not intend to select or qualify proposals or offers on the basis of this RFI or otherwise pay for information obtained via this RFI or in response to this notice. No basis for claim against the Government shall arise as a result of a response to this RFI. The Government is performing market research to determine feasibility of contracting for various energy generation technologies for the purpose of providing resilience to Joint Base McGuire-Dix-Lakehurst (JB MDL), specifically to McGuire loads (illustrated in Appendix A). The Government is specifically interested in determining the viability of procuring reliable, locally-generated, electricity from a Contractor-constructed, owned, operated, and maintained energy generation facility via a Power Purchase Agreement (PPA) 10 USC - 2922a contract. The energy generation facility would provide continuously available, non-interruptible primary power to McGuire and provide capability for islanding McGuire substations in the event of a utility grid outage. The energy generation system shall be designed and optimized to meet the Government's respective requirements under two (2) operating conditions: Normal Operation and Grid Outage Operation. - Normal Operation is defined as periods where McGuire is able to draw electricity from the utility grid. o In Normal Operation, the energy generation system would provide McGuire with up to 16,114,000-25,782,400 kWh per year of primary power at a PPA rate (in $/kWh). - Grid Outage Operation is defined as periods where McGuire is operating independently from the utility grid in an electrically islanded mode. o In Grid Outage Operation, the energy generation system will provide McGuire with primary power and islanding capability for 5-11 MW of critical substation load with the capability to isolate from the utility grid. The Government's interest is to increase electrical power availability to mission functions during periods of grid failure. Evaluation during the RFP phase will be based on 1) total cost as measured by the offerors' levelized cost of energy as USD$/MWhr to include consumption, avoided peak demand charges, market participation benefits, etc., as compared against other offerors' solutions and against existing grid parity 2) evaluation of the technical reasonableness and sufficiency of the solution, and 3) evaluation of the offerors' ability to complete, maintain and operate the project based on prior performance and demonstrated capability. Interested entities should address all questions in the questionnaire below and demonstrate ability to execute the Government's following notional requirements. Government Notional Requirements: General Requirements (including requirements in Normal Operation) 1. The Contractor shall develop, finance, design, build, own, operate and maintain an off-site energy generation facility. The Contractor shall be responsible for providing all labor, material and capital to deliver energy from the proposed generation facility to the substations located at McGuire (see map in Appendix A). This will consist of all operation and maintenance, including upgrading and replacement of equipment required to ensure reliable deliveries of energy for the duration of the contract. 2. The Air Force will not subsidize the development, construction, or operation of any improvements (the Air Force would agree to purchase the energy) and does not warrant the availability of off-take agreements or contracts for the generated energy, except for the load provided via PPA listed in this RFI. 3. The electrical supply from any offsite generation assets shall feed the installation directly via a dedicated line, independent of the commercial grid. 4. JB MDL will not provide any Government property for the generation facility. It is anticipated that off-site generation will occur at a one or more locations adjacent to JB MDL. However, if the configuration includes assets that require minimal (<1 acre) land use such as for a battery or standby generator, JB MDL will provide easements for installation of all those components on Government property near the substations. JB MDL will also provide easements for interconnection to the installation's distribution systems. 5. The Government will purchase up to 16,114,000-25,782,400 kWh of electricity from the proposed energy generation facility, per Production Year. 6. The Contractor's proposed system must be able to deliver electric power to the Government at a total delivered cost between tiny_mce_marker.05 and tiny_mce_marker.15 per kWh. 7. During periods of Normal Operation, the Contractor may use generation and other resilience assets as revenue-generating, grid-facing resources for power generation beyond the agreed upon amount provided to the installation, as long as all other Government Notional Requirements listed herein are met. The Contractor shall meet any AF cyber security regulatory requirements regarding risk management framework (RMF), interconnection, and separation for assets used in Normal and Grid Outage operations. 8. The PPA Term shall be the minimal period necessary to support the financing of the Project or other development considerations, but in no event shall the PPA Term exceed 25 years including construction. 9. Should the Contractor propose net-metering as part of this project, the Contractor shall be responsible for arranging all net metering agreements. 10. Should the Contractor propose solar PV as part of the configuration, the contractor will retain ownership of any Renewable Energy Credits (RECs), tax advantages (Investment Tax Credit and/or Production Tax Credit), and/or any other environmental attributes, and may sell them to a third party. 11. Should the Contractor proposed fossil fuel based generation, they must: a. Have adequate fuel supply for continuous operation for no less than seven (7) days and a resourcing plan acceptable to the AF demonstrating the offeror's ability and commitment to provide fuel indefinitely. b. Obtain/maintain their own air quality permit for any fuel based generation assets. 12. The Contractor (at its sole expense) shall be responsible for ensuring compliance with: a. All applicable Federal and State environmental laws and regulations. b. Force Protection and Anti-Terrorism requirements of JB MDL. c. Department of Defense (DoD), National Institute of Standards and Technology (NIST) and other applicable cybersecurity standards. 13. The proposed generation asset shall meet all power quality standards as required by Pennsylvania-New Jersey-Maryland Interconnection (PJM) Regional Transmission Organization and outlined by the Institute of Electrical and Electronics Engineers (IEEE) including power factor, voltage (level, range, and balance) harmonic distortion, and frequency. The Contractor shall ensure that operation of the generation asset does not create upset conditions on the existing parallel McGuire grid. 14. The Government shall be responsible for conducting any required studies on the effect the solar array will have on air traffic on and around JB MDL in accordance with DoD and Federal Aviation Administration (FAA) policy and guidance. 15. The Contractor shall adhere to any additional applicable terms and conditions resulting from this and other market research. Energy Resilience Requirements 16. The proposed configuration must be designed to meet historical 15-minute interval load (shown in Appendix B) with a 15% safety factor during Grid Outage Operation. Potential resilience scenarios to be covered by this project include: a. Resilience to Substation 2 load (~5 MW peak load). b. Resilience to Substation 2 and 3 loads (~11 MW peak load). 17. In Grid Outage Operation, the proposed configuration must be designed to sustain load for a minimum of seven (7) continuous days in Grid Outage Operation. 18. In Normal Grid Operation, the proposed generation facility shall provide four nines (99.99%) of availability (no more than 52.56 minutes total outage per year), with no more than (3) unscheduled outages per year. No outage during grid failure shall exceed 30 minutes, and Contractor shall ensure that all equipment, controls, and personnel are available to meet this requirement. 19. The proposed generation and resilience assets, switching, and controls should follow guidance outlined in IEEE standard 1547.4 to safely and effectively island loads. AF seeks to employ a modular open architecture as it develops this and future energy resilience projects, including microgrid(s). 20. Proposed configuration should include automated and/or manual switching to island identified loads, generation, and storage into a microgrid for Grid Outage Operation. 21. The Contractor must be able to regularly demonstrate system readiness to island McGuire substations described above in the event of a utility grid outage through periodic (annual and/or monthly) testing. Sources Sought Questions: 1. What is the name and brief description to include type of entity, (i.e., partnership, corporation, etc.), of the public or private organization or business potentially interested in developing energy generation as stated above for JB MDL? 2. What is the business address and web site address? 3. Who are the point of contacts, including name, position, telephone number, and email address, for the submitted information? 4. What is your current and relevant experience, or comparable commercial experience, in developing, constructing, and operating energy generation and resilience assets? 5. If you believe that the Government's notional requirements are not feasible or cost effective, please explain. An explanation should include both the perceived problems with the notional requirements and proposed substitute requirements. 6. What would be your proposed remedy to ensure Contractor performance in the event of a breach of contract requirements, specifically those listed in terms of Normal Operation (i.e. the Contractor fails to provide the minimum amount of power specified in a given Contract Year). 7. What is the proposed technology configuration to achieve the Government Notional Requirements? Include all generation and resilience technologies, potential capacity (in MW), islanding capability, interconnection configuration, and other requirements (e.g. water, fuel). a. Why are you suggesting that specific technology and plan? b. What would be the expected annual fuel requirements and responsibilities for the proposed configuration? c. What is the notional project development timeline to reach operation? d. How much land will is required for the proposed concept (both on McGuire and on an off-base parcel)? i. Per Government Notional Requirements #3, please indicate whether the concept would require land on-base via easement (not to exceed 1 acre). e. If applicable, how would this concept utilize NJ and PJM Renewable Energy Credit and/or ancillary grid services market to generate revenue? f. What testing requirements are recommended to demonstrate system readiness to island the McGuire load? g. What is the minimal period necessary to support the financing your proposed concept? 8. Identify standards you believe facilitate the objective of a modular open architecture (as specified in Requirement #16 above). 9. What alternative technology configurations or acquisition vehicles would you recommend for this concept that meet the Government Notional Requirements (for all alternatives provided, please provide similar details as requested in Question 7)? 10. Are you a small business? If so, what type? Interested entities should submit their questionnaire (sources sought) responses via email to Victor.G.Petty@usace.army.mil no later than 5:00 PM Eastern Time on 01 June 2018. Microsoft Word or Adobe Systems Portable Document Format (PDF) e-mail attachments not exceeding ten (8.5 inches x 11 inches) pages (five pages if printed two-sided) and 10 Megabyte total are acceptable. Facsimile submissions will not be accepted. Cover letters and extraneous materials (brochures, pamphlets, etc.) will not be considered. The Government will analyze all of the submitted information and determine among other things: the probability of realizing the Government's notional requirements; the suitability of the available parcel for the Government's proposed use; and the most appropriate acquisition strategy. Interested parties should submit any additional questions or clarifications to Victor.G.Petty@usace.army.mil as part of or with their questionnaire response. Please do not contact other Air Force staff with questions regarding this RFI. We appreciate your interest and thank you in advance for responding to this Request for Information. Primary Point of Contact: Victor Petty, U.S. Army Corps of Engineers, Victor.G.Petty@usace.army.mil. Be advised that no extensions to this deadline will be granted.

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 236220
Federal
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Solicitation # CEHNC-HQUSMC-10072026
The U.S. Army Corps of Engineers, through the Engineering and Support Center Huntsville, is initiating a competition for the HQ USMC Phase 2 Relocatables project. This effort utilizes a Progressive Design Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project involves the design and construction of ICD 705-compliant Secured Working Areas (SWA) capable of dual accreditation in accordance with ICD/ICS 705, DoD 5200.1, and NSA 94-106. Key technical requirements include 100% Fiber-to-the-Desk infrastructure, STC 50 acoustic attenuation for all interior spaces, and rigorous RF shielding verified through third-party Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). The scope encompasses a turnkey solution including civil site development, environmental mitigation, life safety, and comprehensive interior design. The total period of performance is 630 calendar days from the Notice to Proceed, with specific timelines requiring site adaptation within 100 days, assembly within one week of delivery, and final hookup and furniture installation within 40 days of delivery. Facilities must be manufactured at the vendor's secure location and delivered to designated project sites. Key personnel, including the Site Superintendent, Site Safety and Health Officer, and Quality Control Representative, must be U.S. citizens. The government will conduct an Industry Day on October 27, 2026, to provide further details on the acquisition strategy and requirements, with RSVPs required by October 23, 2026. Design deliverables are structured around sequential submissions at 65%, 95%, 100%, and Issued for Construction milestones.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS