Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PRE-APPROVED ADU CONSTRUCTION DOCUMENTS

Closed
SUCO7172026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Summit County is seeking an experienced consulting firm or individual design professional to develop a catalog of pre-approved Accessory Dwelling Unit (ADU) construction plans to be owned by the Summit County Housing Authority and made available to residents to streamline permitting and construction. The project requires the preparation of a minimum of four distinct ADU plan sets, including configurations for 500 SF studio or one-bedroom units, 650 SF one-bedroom units, and 1,000 SF one- or two-bedroom units, each incorporating complete architectural and engineering documentation such as floor plans, elevations, sections, structural calculations, mechanical and plumbing layouts, fire sprinkler hydraulic designs, energy compliance documentation, and an option for roof or balcony solar integration. All designs must comply with the Snyderville Basin and Eastern Summit County Development Codes, state building codes, and structural snow load requirements specific to the region. The work is to commence in October 2026 and be fully completed by March 2027, with final deliverables and invoices due by that deadline. Proposals must address a comprehensive scope including project management, conceptual and draft design development, coordination with the county team, and final plan sets suitable for public use and building department pre-approval, along with a detailed cost proposal broken down by task and per plan set, including labor, expenses, and sub-consultant fees. Offerors are required to submit a one-page signed letter of interest, evidence of project team qualifications and experience with comparable projects, a clear project approach and schedule, design strategies focused on affordability, energy efficiency, and neighborhood integration with two work samples, a timeline for deliverables, at least three references from two prior projects, and a completed Acknowledgement and Release form. Proposals will be evaluated on a weighted basis with the highest priority given to project approach and scope (30%), followed by experience and qualifications (25%), design strategies (20%), cost proposal (10%), timeline (10%), and letter of interest (5%), with mandatory pass/fail gates for references and the acknowledgement form. Contractors must maintain specified insurance coverages including workers’ compensation, commercial general liability with limits aligned to Utah Code §63G-7-604, commercial automobile liability, professional liability (errors and omissions), and technology errors and omissions insurance, naming Summit County as an additional insured. Contractors are subject to E-Verify compliance, must certify they are not debarred or in conflict of interest, and must adhere to

General Info

Develop four pre-approved ADU plans compliant with local codes, ready for public use by March 2027.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

5

Attachment B - Summit County IT Standard Terms and Conditions

PDF, High priority: read this firststandard-terms-and-conditions
High

RFP Pre-Approved ADU Construction Documents Summit County

PDF, High priority: read this firstrfp
High

Summit County Contract Cover Document

PDF, High priority: read this firstcontract-document
High

Summit County Standard Terms and Conditions for Goods and Services

PDF, High priority: read this firststandard-terms-and-conditions
High

Summit County Housing Authority RFP Pre-Submittal Conference July 27, 2026

PDF, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts

Interested Companies (49)

IMSSan Diego, CA
Blalock and PartnersSalt Lake CIty, Utah
National Flood & Fire Network

See All 49 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Summit County requests proposals to retain an experienced and qualified consulting firm or individual design professional to prepare sets of Accessory Dwelling Unit (ADU) plans. These plans will be owned by the Summit County Housing Authority (SCHA) and made available to residents of Summit County to streamline the permitting and design process for accessory dwelling unit construction. A proposer’s conference has been scheduled for July 27, 2026 from 1:00 – 2:00pm via Zoom. Attendance is not mandatory, but interested proposers are encouraged to attend.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS