Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Engineered Metal Building Design & Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 15 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 15 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract entails the structural and architectural design of a pre-engineered metal building, requiring all deliverables to include professionally stamped engineering drawings compliant with Georgia state building codes. The work must be executed by a qualified designer or engineering firm capable of ensuring full adherence to local regulatory standards, with emphasis on structural integrity, load requirements, and seismic considerations specific to the region. All documentation submitted must bear the seal and signature of a licensed Professional Engineer in Georgia to validate compliance and accountability. This subcontract opportunity is posted by the City of Cumming under NAICS code 541330 for architectural and engineering services, with a response deadline of June 4, 2026. The project is not subject to any specific set-aside classification, and performance is expected to occur within the state of Georgia, though the exact site location is not specified. Interested parties must submit proposals prior to the deadline through the designated state procurement portal, and the contract is governed by standard municipal procurement protocols applicable to public infrastructure design services.

General Info

Provide structural and architectural design services with PE-stamped drawings for metal building in Georgia.

Agency

Georgia → City of CummingView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-66895-NONST-2026-000000050.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 CU WPCD Metal Building

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Cumming
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Cumming
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Structural and architectural design of a pre-engineered metal building with PE-stamped drawings compliant with Georgia building codes.

More opportunities from Georgia → City of Cumming

Same awarding agency

NAICS: 237110
SLED
Western Corridor Sanitary Sewer Improvements
Solicitation # Project No. 645
The City of Cumming, Georgia, is soliciting competitive sealed proposals for the Western Corridor Sewer Improvements project, identified as Project No. 645. The scope of work involves the construction of approximately 4,360 linear feet of new sewer infrastructure, which includes 2,860 linear feet of 8, 10, and 12-inch gravity sanitary sewer and 1,500 linear feet of 8-inch sanitary sewer force main. Key deliverables include the installation of a duplex submersible wastewater pumping station featuring Xylem/Flygt pumps and a Xylem MultiSmart control system, a new electrical building, a JIB crane, a diesel-fired emergency bypass pump, and associated site work such as grading, fencing, and erosion control. The project is located primarily along the south side of Reedy Creek and includes specific installations along Line B. Bids must be submitted to the City of Cumming Utilities Department by September 17, 2026, at 10:00 am local time. A mandatory pre-bid conference was scheduled for August 20, 2026, and attendance is required for bid eligibility. The contract is subject to Davis-Bacon Act wage rules, American Iron and Steel special conditions, and Georgia Environmental Finance Authority supplemental general conditions. Award selection is based on best value, with 80 percent of the evaluation weight placed on the price proposal and 20 percent on bidder qualifications, specifically regarding previous experience with Cumming Utilities on similar projects. Ms. Jordan Johns serves as the primary point of contact for the solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS