Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on June 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Engineered Metal Building System Supply and Delegated Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Lathrop in California is seeking a subcontractor for the supply and delegated design of a pre-engineered metal building system. The scope of work requires the provider to deliver manufacturer-stamped structural calculations and shop drawings, ensuring the system fully complies with specific requirements for insulation, ventilation, and evaporative cooling. This subcontract opportunity is categorized under NAICS code 332312 and will be performed in Lathrop, California. The solicitation was posted on June 16, 2026, and the deadline for responses is July 16, 2026.

General Info

Lathrop, California seeks a subcontractor for pre-engineered metal building supply and delegated design.

Agency

California → City of LathropView Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

Lathrop, CA, 95330, USA

Set-Aside

NONE

Documents

This scope was carved out of CIP GG 26-01.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Professional Architectural and Engineering Design Services for a Prefabricated Metal Building for Fleet Vehicle and Heavy Equipment Storage

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lathrop
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Lathrop
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of a pre-engineered metal building system with manufacturer-stamped structural calculations, shop drawings, and compliance with insulation, ventilation, and evaporative cooling requirements.

More opportunities from California → City of Lathrop

Same awarding agency

NAICS: 237310
SLED
Seventh Street Parking Rehabilitation
Solicitation # CIP PS 26-31
The City of Lathrop is soliciting bids for the Seventh Street Parking Rehabilitation project, located at the intersection of Seventh Street and K Street in Lathrop, California. The project focuses on reconstructing failed base material, asphalt paving, and concrete sidewalks to ensure ADA compliance and improve public drainage. The scope of work includes the removal of existing asphalt and concrete, replacement of drain inlets and storm drain piping, and the installation of new aggregate base, hot-mix asphalt, vertical curbs, and accessibility ramps. The contractor is responsible for all materials, traffic control, and erosion control, with specific requirements for the ADS Flared End Section to comply with the Build America, Buy America Act. The contract is estimated at 450,000 dollars and must be completed within 50 working days following the Notice to Proceed. Award will be granted to the responsible bidder with the lowest total base bid. Requirements for bidders include DIR registration, a bid bond of at least 10 percent of the total bid price, and the provision of 100 percent performance and payment bonds, along with a 10 percent warranty bond. The contractor must adhere to California prevailing wage laws and provide a one-year warranty against defects in workmanship. Project oversight is managed by the City Project Manager and a Project Engineer, with final payment contingent upon the completion of all punch-list items and the submission of required closeout documents.
Highway, Street, and Bridge Construction

POSTED

18 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS