Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pre-Solicitation Conference for GWSB construction contract

Active
DOE-SNOTE-030512-001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Energy’s Savannah River Operations Office is conducting a pre-solicitation conference on May 22, 2003, in Augusta, Georgia, to discuss the upcoming procurement for constructing a second Glass Waste Storage Building (GWSB) at the Savannah River Site. This conference aims to inform potential contractors about DOE’s procurement approach and to gather industry feedback before issuing the formal Request for Proposals. The procurement will be set aside for small businesses under the NAICS code 237990, with a size standard of $28.5 million, though subcontracting up to 85% of the work is permitted, encouraging subcontractors to participate. The new GWSB will be a below-grade structure designed to securely store up to 2,340 vitrified high-level waste canisters produced by the Defense Waste Processing Facility. The design must meet nuclear safety requirements to protect against natural hazards and radiation exposure, with robust features including a vault structure, a heavy-duty floor capable of supporting specialized equipment, and an above-grade weather-protective superstructure. During the half-day conference, participants will receive detailed information about the project scope, procurement process, bonding, funding, scheduling, and labor considerations, followed by a tour of the existing storage building and the proposed site. Attendance is optional but encouraged, with a registration deadline of May 16, 2003, and priority given to U.S. citizens for the site tour. Companies are advised to limit attendees to two or three individuals and can register electronically or by fax. Materials will also be made available to those unable to attend, ensuring broad access for potential offerors ahead of the solicitation release. This event signals the DOE’s commitment to engaging qualified small businesses and addressing industry concerns as it moves forward with this critical environmental management project.

General Info

DOE hosts May 22 conference for small businesses on Savannah River Site Glass Waste Storage Building procurement.

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

event

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Department of Energy (DOE) Savannah River Operations Office (SR) is holding a pre-solicitation conference on May 22, 2003 in Augusta, GA to discuss the construction procurement for a Glass Waste Storage Building (GWSB). The purpose of the pre-solicitation conference is to provide potential offerors information on DOE?s proposed approach for procuring a construction contractor and for DOE to better understand industry concerns and issues. Information learned during this meeting will be considered in the development of the Request for Proposals. The pre-solicitation conference will be held at the Partridge Inn in Augusta, GA from 8:30 ? 12:00 followed by a tour of SRS from 1:00 ? 4:30. SR plans to set aside the procurement for small businesses in accordance with FAR 19.5. This acquisition is classified as North American Industry Classification (NAIC) #237990, Other Heavy and Civil Engineering Construction. The size standard under this NAIC is $28.5 million. Although the procurement will be set aside for small businesses, the successful firm may choose to subcontract up to 85% of the work. Therefore, firms interested in subcontracting opportunities are also encouraged to attend the pre-solicitation conference. The anticipated construction contract is in support of the DOE Environmental Management mission. High Level Waste (HLW) is currently stored in tank farms at the Savannah River Site (SRS). The Defense Waste Processing Facility (DWPF) vitrifies the HLW, and seals it in stainless steel canisters. The canisters are then transported to the GWSB for interim storage until it can be permanently transferred to the Federal repository. The first GWSB is nearing capacity and a second GWSB is required to continue to meet DWPF?s storage requirements. The second GWSB will be a below-grade structure with a footprint of approximately 210? X 210?. It will consist of four vaults and store capacity of 2,340 canisters. The vault walls support the grade level floor. The floor must support the weight of the 235,000-pound Shielded Canister Transport (SCT) and large plugs that provide radiological shielding of the canisters. The SCT removes the plugs, inserts the canisters through the openings in the floor, and replaces the plugs. Each canister is expected to radiate 5,000 rem per hour and can generate 1,000 watts of heat that must be removed by a ventilation system. An above grade superstructure spans the entire width and length of the storage facility with no supporting columns except around the perimeter. This structure protects the vaults from adverse weather. The GWSB vaults and canister supports must be constructed to meet DOE nuclear design ?safety class? requirements. This is necessary to protect the public, the environment, and facility workers from unacceptable radiation exposure in the event of structurally significant natural phenomena such as tornadoes, earthquakes, etc. The above grade superstructure is not a safety-related structure. Among the items that will be discussed at the pre-solicitation conference are: Project overview, Procurement approach and schedule, Bonding requirements, Funding profiles, Working capital and cash flow, Construction schedule, and Labor issues. Attendees will also be given a tour of the GWSB #1 and the proposed site of GWSB #2. Attendance at the pre-solicitation conference is not mandatory. Companies not attending may request copies of the material presented and will remain eligible to receive the RFP and submit proposals. This is NOT a Request For Proposals. Potential offerors interested in attending this pre-solicitation conference must submit the following information no later than COB May 16, 2003: 1) Full name of attendee(s); 2) Company represented and address; 3) Social Security number, and 4) citizenship. Please note that due to security requirements, only U.S. citizens will be allowed to participate in the SRS tour. Space is limited. Companies are asked to limit participation to 2-3 representatives. Responses should be submitted electronically to contact@example.gov or faxed to +1 (555) 000-0000, ATTN: Donna Anderson.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS