PR16330526Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238910 - Site Preparation Contractors

Place of Performance

Saint Andrew, JM-02, JAM

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of State → US Embassy Kingston
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Office AddressWASHINGTON, DC, 20520, USA
Contacts
U.S. Embassy Kingston Procurement Office

Full Description

Show more

Description


The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound.


Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job


Infrastructure Support System - Handhole / Underground Conduit System


Trenching


  • Nine locations have been identified requiring trench work.
  • Thirteen locations have been identified requiring trench work.
  • Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment.
  • If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding.

Trenching from Handholes


  • The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings.

Conduit


  • Existing conduit shall remain in place unless the drawings specifically direct removal or modification.
  • Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater.
  • All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends.
  • Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers.
  • The Contractor shall install pull lines in all new conduit runs.

Soil and Backfill Materials


Soil Materials


The Contractor shall provide all labor and materials for soil and backfill, where required.


  • Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter.
  • Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
  • Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
  • Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand.

Placement and Compaction


  • Place backfill and fill in layers not exceeding:
    • 8 inches (203 mm) loose thickness for heavy compaction equipment;
    • 4 inches (102 mm) loose thickness when compacted by hand-operated tampers.
  • Place backfill and fill evenly to the required elevations, uniformly along their full length.
  • Compact soil materials to not less than the following percentages of maximum dry unit weight per ASTM D 1557:
    • Under lawns or unpaved areas: scarify and re-compact top 6 inches (152 mm) below subgrade and compact each layer to 85%.
    • Utility trenches: compact each layer of initial and final backfill to 85%.

Anticipated Period of Performance: a base period of twenty-one (21) days after contract award


Eligibility and Registration


Offerors must hold an active registration in the System for Award Management (SAM.gov) when they submit a proposal and at award.


Local Insurance and Defense Based Act (DBA) Insurance.


Solicitation Availability


The Embassy will post the solicitation and all amendments only on SAM.gov at https://sam.gov. Interested parties should monitor SAM.gov for the release and any amendments. The Embassy will not issue paper copies.


Disclaimer


This notice is for informational purposes only and is not a request for proposals. It does not commit the Government to issue a solicitation or award a contract. The Government will not pay for any information or materials submitted in response to this notice.


Interested Parties are required to send their interest to Kingstonquotes@state.gov on or before October 26, 2026 at 2pm local time.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps Building 14 Demo project involves the complete demolition of the old security building and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the demolition of an old septic system, removal of debris, trees, and rocks, and the subsequent backfilling, grading, and seeding of the affected areas. Critical utility work is required, including capping the sewer line and disconnecting building power while ensuring uninterrupted power and communications for the guard shack, mountain pump house, and water tank, which may necessitate the installation of new telephone poles. Additionally, the contractor must replace the water shut-off valve with a straight pipe, a task that must be completed within a single day between 8:30 AM and 3:00 PM to minimize disruption. This small business set-aside solicitation requires the contractor to provide all necessary permits, dumpsters for haul-off, and chain of responsibility letters for all waste. Due to the location on Foothills Drive, the contractor is responsible for providing traffic control and flaggers to manage heavy equipment and local traffic. Compliance requirements include active SAM.gov registration, adherence to Davis-Bacon wage standards, and the submission of certified payroll. Bidders must provide separate costs for labor and materials in their proposals. The response deadline for this solicitation is October 19, 2026.
Keystone Job Corps

POSTED

about 5 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Department Of State → US Embassy Kingston

Same awarding agency

NAICS: 561790
Federal
Swimming Pool Maintenance at USG Owned Facilities and Residences
Solicitation # 19JM3726Q0013
The US Embassy Kingston is soliciting a one-year fixed-price contract for comprehensive swimming pool maintenance at three US Government-owned facilities: the Colin Powell Residential Plaza, the Chief of Mission Residence, and the Deputy Chief of Mission Residence. The selected contractor must provide all labor, management, transportation, equipment, and chemicals to ensure pools are maintained according to Safety Health and Environmental Management standards. Key responsibilities include physical cleaning, such as brushing and skimming, as well as chemical management to maintain specific pH levels between 7.2 and 7.6, free chlorine between 3 and 7 ppm, total alkalinity between 80 and 120 ppm, and cyanuric acid between 30 and 80 ppm. Performance is scheduled during normal working hours from 7:15 to 16:00, Monday through Friday. The contract requires the contractor to submit a Quality Control Plan and maintain Defense Base Act insurance. Award evaluation is based on a compliance review, technical acceptability—including past performance and experience—and the lowest price. The total anticipated value is not expected to exceed the Simplified Acquisition Threshold of 350,000 dollars. Recurring services are invoiced monthly following government acceptance, while emergency services are billed separately. The Building Engineer serves as the Contracting Officer's Representative.
Other Services to Buildings and Dwellings

POSTED

22 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS