Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Massachusetts was posted on October 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Precast Catch Basin Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract involves the installation of precast concrete drainage inlets for prime contractors on MassDOT highway projects located in Becket, Massachusetts. The scope of work includes the excavation and installation of double-grate catch basins featuring minimum 4-foot sumps, all set upon 12 inches of crushed stone bedding. The project requires the use of reinforced concrete that conforms to ASTM C478 and ASTM A185 steel to support HS 20-44 live loads, with a specified compressive strength of 4,000 psi. The final deliverable is the provision of fully installed and operational catch basins within District 1.

General Info

Installation of precast concrete drainage inlets for MassDOT highway projects in Becket, Massachusetts.

Documents

This scope was carved out of 609506-136647.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 004 609506-136647

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs precast concrete drainage inlets for prime contractors on MassDOT highway projects in Becket, Massachusetts. Performs excavation and installation of double-grate catch basins with minimum 4-foot sumps on 12 inches of crushed stone bedding. Uses reinforced concrete conforming to ASTM C478 and ASTM A185 steel to support HS 20-44 live loads with 4,000 psi compressive strength. Delivers installed and operational catch basins.

More opportunities from Massachusetts Department of Transportation

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS