Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Precast Concrete Box Culvert Fabrication & Supply

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the fabrication and supply of precast concrete box culverts and structural components for prime contractors working on Maine Department of Transportation bridge projects. The scope of work includes the design and fabrication of precast structural concrete arches, box culverts, wingwalls, headwalls, toe walls, and cut-off walls, with a requirement that all designs adhere to AASHTO LRFD Bridge Design Specifications and utilize the Maine Modified live load for Strength I limit states. The contractor is responsible for delivering the completed precast concrete sections directly to the project site. The contract is associated with NAICS code 327310 and is managed by the Maine Department of Transportation, with the place of performance located in Dover-Foxcroft. The solicitation was posted on November 25, 2026, with a response deadline of December 16, 2026. There is no specified set-aside status for this opportunity.

General Info

Place of Performance

Dover-Foxcroft, ME, USA

Set-Aside

NONE

Documents

This scope was carved out of 028250.00.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Dover-Foxcroft — Stinchfield Brook Bridge Replacement Stinchfield Brook Bridge on Dexter Road/State Route 7 over Hanson Brook approximately 0.20 of a mile north of Board Eddy Road.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 20 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom Dover-Foxcroft — Stinchfield Brook Bridge Replacement Stinchfield Brook Bridge on Dexter Road/State Route 7 over Hanson Brook approximately 0.20 of a mile north of Board Eddy Road.
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaine Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and delivers precast concrete box culverts and structural components for prime contractors on Maine Department of Transportation bridge projects. Designs and fabricates precast structural concrete arches, box culverts, wingwalls, headwalls, toe walls, and cut-off walls. Designs must adhere to AASHTO LRFD Bridge Design Specifications and utilize the Maine Modified live load for Strength I limit states. Delivers completed precast concrete sections to the site.

Similar Contracts

Same NAICS industry code

More opportunities from Maine Department of Transportation

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS