Prefabricated Weathered Steel Truss Bridge Supply
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the County of Marin involves the supply of fully engineered, multi-piece, clear-span weathered steel truss pedestrian bridge systems for Open Space District projects. The scope of work includes providing sealed design calculations, engineering, shop drawings, and the fabrication of 60-foot and 90-foot bridges. The contractor is responsible for supplying all necessary materials, including weathering steel, redwood decking, railings, bearings, and field-splice hardware. The project concludes with the delivery of two prefabricated bridge superstructures to the designated site. There is no specified set-aside status for this opportunity.
General Info
Documents
This scope was carved out of MCP 2026-07.
The full solicitation package (18 documents), including the RFP, is on the prime solicitation, not on this scope.
MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Read the full solicitation package
This scope is part of a larger contract. Its documents live on the prime.
- 18 documents on the prime contractFrom MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
subcontract
Submission deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
