Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Preliminary Engineering & Route Alignment

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Preliminary Engineering and Route Alignment supports the California High Speed Rail Authority on projects located in Fresno and Hanford. The selected provider will perform preliminary engineering designs for prime contractors, utilizing CAD and GIS tools to develop conceptual designs, map alternative sites, and establish technical specifications for the construction, operation, and maintenance phases. The contract requires the delivery of preliminary engineering drawings and design reports in strict accordance with Caltrans and HSR Authority standards. A Professional Engineer license is mandatory for this role. The project falls under NAICS code 541330 and is centered in the 93725 zip code area.

General Info

Preliminary engineering and route alignment for California High Speed Rail in Fresno and Hanford.

Agency

California High Speed Rail Authority

Place of Performance

CA, 93725

Set-Aside

NONE

Documents

This scope was carved out of California High-Speed Rail Central Valley Heavy Maintenance Facility Project.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom California High-Speed Rail Central Valley Heavy Maintenance Facility Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia High Speed Rail Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California High Speed Rail Authority
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs preliminary engineering designs for prime contractors on California High-Speed Rail Authority projects in Fresno and Hanford. Develops conceptual designs and maps alternative sites using CAD and GIS tools to create technical specifications for construction, operation, and maintenance phases. Requires Professional Engineer (PE) license and adherence to Caltrans and HSR Authority standards. Delivers preliminary engineering drawings and design reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Public Works

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
Design Services For Water Well No. 30 Rehabilitation
Solicitation # UH26004
The City of Stockton is soliciting professional engineering services for the Water Well No. 30 Rehabilitation Project located in Lodi, California. The primary objective of this project is to ensure that water quality meets all Title 22 drinking water quality standards while maintaining a well capacity of approximately 2,000 gallons per minute. The scope of work includes the development of a Preliminary Design Report that identifies treatment options for 1,2,3-TCP and provides a 10-year capital and O&M cost analysis, the creation of full construction documents, the preparation of water system permit amendment applications, and the provision of engineering support during the bidding process. Proposals are due by December 3, 2026, and must be submitted to the Office of the City Clerk in Stockton. The submission must include one original with wet ink signatures, three copies, and a USB containing an electronic version, with the fee proposal submitted in a separate sealed envelope and a passcode-protected file on the USB. The City will use a ranking process to select the most qualified consultant, evaluating proposals based on technical merit before reviewing cost proposals. Selected contractors must comply with prevailing wage requirements, ADA standards, and non-discrimination laws, and must provide a Certification of Financial Condition to ensure financial soundness and tax compliance. Payment for services is processed within 30 days of receiving an approved invoice.
City of Stockton

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS