Premise wire - Solicitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves engineering, furnishing, installing, and testing premise wiring within building 549 at Tyndall Air Force Base, Florida. It is a total small business set-aside under NAICS code 238210, which relates to electrical contractors and other wiring installation contractors. The solicitation, titled "Premise wire," was posted on May 15, 2026, with a response deadline of May 29, 2026. The work is to be performed at Tyndall AFB, with the contracting office located there as well. This opportunity is managed by the Department of Defense’s 325th Contracting Squadron at Tyndall AFB. Interested small business entities are encouraged to respond within the given timeframe. For further inquiries, the primary point of contact is SSgt Angel Clarke, reachable via email or phone, with David Volberg serving as a secondary contact. The contract is designated as a sources sought notice, indicating an initial market research phase to identify capable vendors for future procurement.
General Info
Agency
NAICS
Place of Performance
Tyndall AFB, FL, 32403, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
NOTE: There will be a site visit conducted on June 10, 2026 at 10am CDT. EAL is due NLT 1300 CDT on June 6, 2026. If you already have access to Tyndall Air Force Base an EAL is not required. Attachment L contains the information for when questions are due by.
The Contractor to engineer, furnish, install and test (EFI&T) premise wiring within building 549 at Tyndall AFB. Newly installed premise wiring will support Unclassified but Sensitive Internet Protocol Router Network (NIPRNet). The Contractor shall provide all materials, transportation, labor, management, tools, and other incidentals necessary to meet the requirements. All materials provided shall be new and not refurbished. The Contractor must identify any base support requirements (for example, laydown and storage areas) necessary to complete this project. The Contractor shall coordinate with 325CS for storage space and staging area requirements. The Contractor shall restore all disturbed grounds/base property to the "as found" condition or better after installation. Base grounds/property restoration requirements shall be complied with.
