PREMISE WIRING B145
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves engineering, furnishing, installing, and testing an upgraded premises wiring system at Building 145 on Malmstrom Air Force Base in Montana. The project requires replacing existing cabling with new plenum-rated Category-6 and OM4 multimode fiber optic cables following layouts provided in the attached drawings. The work includes installation and replacement of communications racks and cabinets, new AC power installations complete with power distribution units, and grounding for the communications infrastructure. Additionally, the contractor is responsible for removing all outdated and abandoned Category-3/5 copper and multimode fiber cabling, as well as any leftover materials, and properly disposing of them. This solicitation is a total small business set-aside under NAICS code 238210, managed by the Department of Defense through the 341st Contracting Logistics Office. The solicitation was posted on March 20, 2026, with a response deadline of April 6, 2026. The performance location is Malmstrom Air Force Base, Montana. The primary points of contact for this contract are Jeffrey Krieger and Charles McClintic, both reachable via email and phone. The full details and requirements are available through the official solicitation workspace online.
General Info
Agency
NAICS
Place of Performance
Malmstrom AFB, MT, 59402, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.
Amendment 0001:
1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.
2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST
RFIs answered
- How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time.
- We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution.
- Please clarify the description “new/replacement”. Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there.
- There is a few area that require new drops to be cut in from existing cabling that is running out in the open.
- Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations?
- Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2.
- Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled.
- It should state somewhere that all unused copper will be removed from the building.
- Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there.
- Yes, for terminating to the patch panel. We will patch into the switch.
See Attached SOO for full details.
More opportunities from Department Of Defense → FA4626 341 Cons Lgc
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS