Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Prestressed Concrete Tank Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the design and construction of two 750,000-gallon ground storage tanks for water infrastructure projects in the City of Conroe. The scope of work requires the construction of wire or strand-wound prestressed concrete circular core walls adhering to AWWA D110 Type III standards. Key technical requirements include the installation of 6-mil polyethylene moisture barriers, vertical waterstops, and various appurtenances such as 30-inch sumps and stainless steel manways. The contractor is responsible for the full delivery of two commissioned tanks, which includes performing necessary disinfection and hydrostatic testing. This project falls under NAICS code 238110 and is managed through the Engineering agency in Texas. Interested parties must submit their responses by the deadline of October 15, 2026.

General Info

Design and construct two 750,000-gallon water storage tanks in Conroe, Texas by 2026.

Documents

This scope was carved out of 2024-28.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Water Plant No. 36

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Designs and constructs two 750,000-gallon ground storage tanks for prime contractors on City of Conroe water infrastructure projects. Constructs wire or strand-wound prestressed concrete circular core walls per AWWA D110 Type III standards. Installs 6-mil polyethylene moisture barriers, vertical waterstops, and appurtenances including 30" sumps and stainless steel manways. Performs disinfection and hydrostatic testing. Delivers two commissioned tanks.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Engineering

Same awarding agency

NAICS: 237110
SLED
Water Plant No. 36
Solicitation # 2024-28
The City of Conroe Engineering Department is soliciting Competitive Sealed Proposals (CSP 2024-28) for the construction of Water Plant No. 36, located at FM 1484 near Technology Parkway in Conroe, Texas. With an estimated engineering budget of $13,000,000.00, the project involves the installation of a 2,000 gpm Jasper well, two 750,000-gallon AWWA D110 Type III prestressed concrete storage tanks, a booster station, and a precast control building. The comprehensive scope of work includes civil, water system, storm water, and electrical works, as well as the implementation of SCADA and I&C field instrumentation. All construction must adhere to 2024 TxDOT specifications, NEC electrical codes, and OSHA trenching guidelines, with a strong preference for domestic materials. Proposals are due by October 15, 2026, at 1:00 pm via the OpenGov portal. The City will award the contract based on a best-value evaluation using a 100-point scale. Required submission documents include a cover letter, acceptance of conditions, key personnel resumes, and a proposed Gantt schedule for substantial completion. Bidders must provide a bid security of 10% of the bid amount, and the successful contractor will be required to furnish performance, payment, and maintenance bonds. Payment is processed through monthly applications, with specific milestones for I&C system programming based on factory and onsite acceptance testing. Final system acceptance requires a continuous seven-day failure-free operational period.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS