Prineville Deep Injection Well MIT

Closed
20250125State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

23 minutes ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

23 minutes ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

23 minutes ago

DEADLINE

in about 11 hours

AI Contract Overview

Show more

The City of Port St. Lucie has issued an electronic Invitation for Bid (IFB) under Ordinance 35.07 to secure a qualified contractor for the Prineville Deep Injection Well Mechanical Integrity Testing (MIT) project at the Prineville Water Treatment Plant. The contract aims to ensure that the deep injection well IW-1 meets specified performance and quality standards, including mechanical integrity testing, with detailed specifications and system diagrams provided in the contract documents. The project involves testing the wellhead, containment pad, and potable water source, with the work scheduled for completion before September 27, 2025. The solicitation, posted on June 11, 2025, with a response deadline of July 16, 2025, is open to qualified proposers, with the contract value estimated between $500,000 and $1,500,000. The project falls under NAICS code 237110 and is managed by Michelle Fentress, who can be contacted via email or phone for further information.

Documents

1

20250125 - Prineville Deep Injection Well MIT

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Port St. Lucie
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Pursuant to the Port St. Lucie City Code of Ordinance 35.07, this electronic Invitation for Bid (IFB) is being issued to establish a contract with a qualified proposer who will provide Prineville Deep Injection Well MIT to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB.The Specifications included in these Contract Documents establish the performance and quality requirements for material and equipment and the minimum standards for mechanical integrity testing of deep injection well IW-1 at the City of Port St. Lucie’s Prineville Water Treatment Plant (WTP).  A location map, site plan, and diagram of the deep injection well system are provided in the attached Figures 1 through 3.  Photos 1 and 2 show the IW-1 wellhead, containment pad and potable water source to be used for testing.  The work must be completed prior to September 27, 2025 due date. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS