PRODUCTION LOT TESTING
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract requires the contractor to conduct rigorous first article testing on two units of Lot/Item 3040 / 3203352, with written notice provided to the Contracting Officer and Quality Assurance Representative at least fourteen calendar days prior to shipment for Final Acceptance Testing. The first article test report must be submitted within ninety calendar days of contract award, and the government will issue conditional approval, approval, or disapproval within thirty days of receiving the report. Production lot testing is mandatory after first article approval, with samples randomly selected from the production lot to validate ongoing quality conformance. The contractor must cover all costs associated with samples consumed or destroyed during testing and notify the government at least fourteen days in advance of the test location and schedule. Failure of any production lot test sample results in rejection of the entire production lot, requiring immediate notification and proposal of corrective action. All production lot test reports must comply with DI-NDTI-80809B format and include DD Form 1222 and DD Form 250/iRAPT documentation signed by the QAR, along with certified test results, material and process certifications, inspection method sheets, and marked drawings. The item, identified by NSN/Part Number 0001S00000062, has a delivery requirement of 763 days after award and is procured under solicitation SPE7L2-26-T-0571, with Fast Pay explicitly excluded. The contracting office is the Department of Defense’s Land Supplier Opns Wheeled Vehicles, located in San Diego, and all correspondence must follow the instructions outlined in Procurement Notes H03 and E03.
General Info
Agency
NAICS
Place of Performance
3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 2 UNIT(S) OF LOT/ITEM 3040 / 3203352 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 90 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 30 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E03: Production Lot Testing – Contractor (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. (2) The contractor shall provide written notice to the contracting officer and the QAR of the time and location of the test at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the production lot test so the Government may witness the test. (3) The QAR will select samples at random from the production lot(s) produced. (4) The contractor shall perform all tests on the PLT samples to verify/validate for the QAR that the items meet the contract technical/quality requirements. (5) If a PLT sample fails, the entire production lot quantity produced fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (6) Prepare and disseminate the PLT report as follows:
SPE7L2-26-T-0571
SECTION A
(a) Prepare the test report in accordance with data item description DI-NDTI-80809B and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].” (b) Present the contractor’s PLT report to the QAR for review. (c) Include the following documentation with all shipments of PLT Reports: DD Form 1222 and DD Form 250/iRAPT receiving report signed by the QAR; a copy of the contract/order; a copy of all applicable test reports showing actual results and tolerances specified in the technical data package; material and process certifications; process operations and inspection method sheets; copies of drawings used to manufacture the PLT sample with proper marking to restrict public disclosure (if desired) and from Government use other than for NSN/Part Number: 0001S00000062 Quantity: 1 EA Purchase Request: 7017528594QTY - See Solicitation Delivery: 763 days ADO