PRODUCTION LOT TESTING
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract requires the contractor to perform first article testing on one unit from a specific lot/item, with mandatory written notifications to the contracting officer and Quality Assurance Representative (QAR) at least fourteen days before shipment for final acceptance testing. The first article test report must be submitted within 60 days of contract award, and the government will provide conditional approval or disapproval within 30 days of receipt. The approved first article units will be retained by the contractor as manufacturing standards throughout the production run, with specific protocols to follow for disposition and handling, especially in indefinite delivery contracts. Following first article approval, production lot testing (PLT) is required to validate quality conformance. The contractor must notify the government in advance before presenting lots for sample selection by the QAR, who will randomly select samples for government testing. The contractor is responsible for pricing the PLT to cover sample testing costs and must ship these samples with detailed documentation to the designated government testing facility. All shipments are to be traceable, properly marked, and accompanied by relevant forms and certifications. The government testing timeframe is 90 days, and the contract delivery timeline is set at 331 days for a quantity of 15 units, with oversight and communication handled by specified contacts within the Department of Defense. Fast Pay terms will not apply under this solicitation.
General Info
Agency
NAICS
Place of Performance
2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 3040 / 11177353 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 60 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 30 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E01: Supplemental First Article Exhibit Disposition Contractor Maintained (MAY 2020)
The first article units will be maintained or returned to the contractor to be used as a manufacturing standard. The contractor shall hold the approved first article units at the production facility until all production quantities have been produced and accepted. In the case of indefinite delivery contracts, the contractor shall hold the first article units until final production run has been approved and accepted on the first delivery order. The unit shall be considered a production guide or manufacturing standard if defects are reported on delivered material or problems are encountered during production. When disposing the units, the contractor shall follow DFARS 252.245-7004(d).
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting
SPE4A5-26-T-127R
SECTION A
officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus NSN/Part Number: 0001S00000061 Quantity: 15 EA Purchase Request: 7016437735QTY - See Solicitation Delivery: 331 days ADO