PRODUCTION LOT TESTING
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the production and testing of a specified lot item, requiring the contractor to complete first article testing on one unit to verify compliance with contract specifications. The contractor must notify the contracting officer and Quality Assurance Representative (QAR) at least 14 calendar days prior to shipment of the first article to allow for in-process and final inspections, and must submit a detailed first article test report within 30 days of contract award. The government will then review and issue approval or disapproval within 30 days of receipt. Subsequent production lot testing is also mandated to ensure ongoing quality conformance after first article approval. The contractor must provide the government with samples from the production lot for testing and cover associated costs for samples that are consumed or destroyed during testing. Additionally, the contractor must adhere to specific shipment and documentation requirements for the production lot test samples, including marking requirements, inclusion of detailed certifications, test results, and forms such as DD Form 1222 and DD250/IRAPT Receiving Reports. Samples must be shipped to the designated government facility with provisions for sample return at no additional cost to the government. Notification to the contracting officer regarding shipments and tracking is required. This procurement falls under NAICS code 336413 and is managed by the Department of Defense's ASC Supplier OEM Division, with the place of performance noted as Tracy. The total contracted quantity is 17 units with a delivery timeline of 736 days after order.
General Info
Agency
NAICS
Place of Performance
REC WHSE 57, TRACY, CA, 95304-5000, USSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 1615 / 12629482 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 30 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 30 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE
SPE4A5-26-T-127M
SECTION A
W31P0W
REDSTONE ARSENAL
REDSTONE TECHNICAL TEST CENTER
ATTN: CHARLES EAKES
BLDG 4500
REDSTONE ARSENAL
AL
35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 0001S00000061 Quantity: 17 EA Purchase Request: 7016647059QTY - See Solicitation Delivery: 736 days ADO