This Solicitation opportunity from Department Of Defense was posted on August 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CONTRACTOR FIRST ARTIC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SPE4A5-26-T-343S is issued by the Department of Defense ASC Supplier Oper OEM Division for the procurement of 353 units of Spacer Sleeves (NSN 5365012233628). The contract requires a delivery period of 341 days after receipt of order, with shipping terms established as FOB Origin. Inspection and acceptance will also occur at the origin. The procurement includes mandatory quality assurance milestones, specifically First Article Testing (FAT) for two units and subsequent Production Lot Testing (PLT) to validate quality conformance. Contractors must provide written notice to the Quality Assurance Representative (QAR) at least 14 calendar days prior to testing and submit the FAT report within 60 calendar days of the contract date. Compliance requirements are stringent, mandating adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking and bar-coding. Hazardous materials must be labeled per 29 CFR 1910.1200, and any radioactive materials require prior written notification to the Contracting Officer. All invoicing and payment processing must be conducted exclusively through the Wide Area WorkFlow (WAWF) system. Proposals must be submitted via the DIBBS portal by August 19, 2026. The solicitation also incorporates various FAR and DFARS clauses regarding small business representations, cybersecurity standards under NIST SP 800-171, and the safeguarding of covered defense information.
General Info
Agency
NAICS
Place of Performance
515 N 51ST AVENUE NUMBER 130 DOCK 1, PHOENIX, AZ, 85043, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 2 UNIT(S) OF LOT/ITEM 5365 / 12233628 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 60 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 150 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E03: Production Lot Testing – Contractor (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed, or otherwise rendered unusable during testing. (2) The contractor shall provide written notice to the contracting officer and the QAR of the time and location of the test at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the production lot test so the Government may witness the test. (3) The QAR will select samples at random from the production lot(s) produced. (4) The contractor shall perform all tests on the PLT samples to verify/validate for the QAR that the items meet the contract technical/quality requirements. (5) If a PLT sample fails, the entire production lot quantity produced fails. The contractor shall notify the contracting officer and propose corrective action, if appropriate. (6) Prepare and disseminate the PLT report as follows: (a) Prepare the test report in accordance with data item description DI-NDTI-80809B and mark the test report, “Production Lot Test Report, Contract Number [contractor insert] and Lot/Item Number [contractor insert].”
SPE4A5-26-T-343S
SECTION A
(b) Present the contractor’s PLT report to the QAR for review. (c) Include the following documentation with all shipments of PLT Reports: DD Form 1222 and DD Form 250/iRAPT receiving report signed by the QAR; a copy of the contract/order; a copy of all applicable test reports showing actual results and tolerances specified in the technical data package; material and process certifications; process operations and inspection method sheets; copies of drawings used to manufacture the PLT sample with proper marking to restrict public disclosure (if desired) and from Government use other than for NSN/Part Number: 0001S00000053 Quantity: 353 EA Purchase Request: 7017742358QTY - See Solicitation Delivery: 341 days ADO
More opportunities from Department Of Defense → ASC SUPPLIER OPER OEM DIVISION
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
