Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary St to J.W. Powell Blvd

Active
2026-446State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Flagstaff is seeking an Arizona licensed professional engineering firm to conduct a feasibility study for the Lone Tree Road corridor from O'Leary Street to John Wesley Powell Boulevard. With an estimated budget of 350,000 dollars, the project aims to enhance regional mobility and safety by evaluating the need for a traffic interchange or grade-separated crossing at I-40 and determining the optimal roadway cross-section south of Pine Knoll Drive. The scope includes pre-NEPA environmental analysis, drainage and utility studies, and the development of 15 percent design plans. A primary objective is the implementation of complete streets in alignment with the City's 2022 Active Transportation Master Plan, focusing on ADA compliance and improved pedestrian and bicycle infrastructure. The selection process is qualifications-based, evaluating firms on their experience, personnel, and specific knowledge of the Flagstaff region. Key deliverables include a final feasibility report, an engineer's construction cost estimate, and all associated CAD files. The project is expected to be awarded in November 2026, with design services concluding by October 2027. The resulting contract will be governed by Arizona state law and includes standard provisions regarding public records, conflict of interest, and monthly invoicing contingent upon the acceptance of satisfactory services.

General Info

Flagstaff seeks engineering firm for $350,000 Lone Tree Road corridor feasibility study.

Documents

2

Professional Engineering Services for Lone Tree Road Feasibility Study (2026-446)

PDF, High priority: read this firstrfq
High

City of Flagstaff Consultant Services Contract Template

PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → City Engineering - Capital Improvements
Contacts2 people available
OfficeFlagstaff, AZ, 86001-5359, USA
Office AddressFlagstaff, AZ, 86001-5359, USA
Contacts
Ben MarkertProject Manager Senior Lead
Emily MarkelPurchasing Manager

Interested Companies (9)

WSP USATempe, AZ
T.Y. Lin InternationalSan Diego, CA

See All 9 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Lone Tree corridor is located within Flagstaff, Arizona, east of downtown, running north-south and crossing the Interstate-40 (I-40) corridor. The Regional Land Use and Transportation plan identifies Lone Tree as a minor arterial connection between downtown Flagstaff and JWP. A corridor study was completed in 2006, including a conceptual alternative providing the flexibility to implement a traffic interchange with I-40, as well as enhance the multi-modal initiatives of the community, including expansion of the Flagstaff Urban Trail System (FUTS) and accommodation for transit stops. The corridor study provided realignment options for Lone Tree Road between Woodland Drive and Pine Knoll Drive. For the purposes of this study, Option A - keeping Lone Tree along its current alignment - shall be assumed, as the relocation of Kinsey Elementary School is anticipated prior to implementation of improvements along this segment of Lone Tree Road. Additionally, the 2006 corridor study recommended a new alignment of Lone Tree Road from Pine Knoll Drive to JWP, including a new traffic interchange (TI). A current development, Juniper Point, has received civil plan approval to construct approximately 1,500-ft of the new Lone Tree alignment, referred to on the plans as Juniper Point Boulevard. This Juniper Point Boulevard alignment shall be assumed to represent the southernmost alignment for planning and design purposes, as well as the existing Lone Tree Road alignment. The selected firm shall collaborate with the City's Transportation Planning and Engineering Sections to evaluate traffic demand associated with existing entitlements, proposed developments, and anticipated future land uses within the Lone Tree Road project area. The model results will be provided to the firm to determine if a TI at the I-40 and Juniper Point Boulevard is required, or if a grade-separated over/under-pass without an interchange will meet long-range mobility and safety needs. Additionally, it is anticipated that the model results will be used to determine the ultimate cross-section for the existing Lone Tree Road segment south of Pine Knoll Drive, including an evaluation of whether a 3-lane or 5-lane configuration is warranted. The project presents an opportunity to improve pedestrian and bicycle infrastructure through improved ADA compliance, safer crossings, and greater separation from motor vehicle traffic. Reconstruction and expansion of the existing roadway, curb and gutter, utility adjustments, curb ramps, sidewalk, lighting, pavement markings, and signing are included in this project. A goal of the project is to improve multimodal safety and mobility by providing complete streets in accordance with the City's 2022 Active Transportation Master Plan (ATMP) The work is anticipated to occur partially within existing City of Flagstaff roadway right-of-way, and additional right-of-way is required in various locations. Full closure of Lone Tree Road for construction is not likely, therefore phasing of work shall be planned for in this design. Deliverables for this Project include, but are not limited to, draft and final Feasibility Report, preliminary environmental, drainage, traffic, utility and right-of-way analysis, 15-percent plans, and engineer's construction estimate. The Firm shall also conduct project update meetings, comment resolution, and public outreach including coordination, exhibit preparation and attendance of a public event. Lone Tree Road Corridor Study (2006) https://lonetreeoverpass.org/pdfs/Lone_Tree_Corridor_Final_Report_03_06.pdf Lone Tree Road Corridor Specific Plan (2008) https://www.flagstaff.az.gov/DocumentCenter/View/45062/LTCSP_application_MAY30_2008?bidId= For additional information on the City of Flagstaff's Active Transportation Master Plan https://www.flagstaff.az.gov/3181/Active-Transportation-Master-Plan For additional information on Flagstaff Regional Plan 2045 https://flagstaff-regional-plan-2045-flagstaff.hub.arcgis.com/ For additional information on City Flood Plain Regulations https://www.codepublishing.com/AZ/Flagstaff/html/Flagstaff12/Flagstaff1201000.html For additional information on Flagstaff Carbon Neutrality Plan https://connect.flagstaffaz.gov/CNPupdate Other relevant resources, reports and documents can be found on the City's website here: https://flagstaff.az.gov/3915/Reports-Documents Figure 1 - Location map within the City of Flagstaff

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RSOQ for 2027 Water & Stormwater Design Engineering Services
Solicitation # PCMC27039-WAT
The Park City Municipal Corporation is soliciting professional design engineering services for six water and stormwater infrastructure projects under its Water Department Capital Improvement Program. The scope of work involves developing complete, bid-ready design documents, including construction plans, technical specifications, and cost estimates, to replace aging infrastructure and improve system reliability. Key projects include the Sampson / Norfolk / Woodside Transmission Line Replacement, Royal Street West Waterline Replacement, Estates Drive Phase II & Four Lakes Waterline Replacement, Park Avenue Waterline & Stormwater Replacement, Equestrian Court Stormwater Redesign, and the Park City Stormwater Infrastructure Improvements Project. Most projects must be completed by January 31, 2027, while the Park Avenue and general infrastructure improvement projects have a deadline of March 31, 2027. Qualified respondents must submit a Statement of Qualifications via the Utah Public Procurement Place portal by October 29, 2026. Awards are based on a project-specific ranking of respondents, evaluating firm qualifications, relevant experience from the last ten years, proposed personnel, and the ability to meet strict design milestones at 60, 90, and 100 percent completion. Selected professionals will enter into a standard Design Professional Services Agreement requiring monthly invoicing with 30-day payment terms and mandatory participation in E-Verify for all Utah-based employees. All work must adhere to current municipal design standards and the professional standard of care typical for the engineering field.
Utah

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
International
Fire Hydrant Flow Testing and Hydraulic Modelling Services
Solicitation # WS-RFP-26-077
The Town of Whitchurch-Stouffville is soliciting bid proposals under solicitation number WS-RFP-26-077 for Fire Hydrant Flow Testing and Hydraulic Modelling Services. The project involves a multi-year engagement focused on annual flow monitoring and hydrant testing across Stouffville, Ballantrae, and Gormley. Key technical requirements include the installation and rotation of six continuous pressure monitors, quarterly data analysis and quality assurance from years one through five, and the final removal of equipment in year five. All field testing must adhere to the AWWA M17 manual, and any work performed on rights-of-way must comply with the Ministry of Transportation Book 7 of the Ontario Traffic Manual. The contract will be awarded to the proponent achieving the highest total score, with the lowest bid price receiving full points for the pricing component. Qualified proponents must be legally operating in Ontario and provide a project team led by a dedicated Project Manager, with all work performed by Ontario licensed trade personnel. Mandatory insurance requirements include a minimum of 2 million dollars for both automobile and professional liability coverage, with the latter remaining in force for 24 months post-completion. Payments will be processed via Electronic Funds Transfer within 28 days of approved invoice receipt. Proposals must be submitted electronically through the Bids and Tenders portal by November 2, 2026, at 3:00 p.m. local time.
Town of Whitchurch-Stouffville

POSTED

about 23 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Arizona → City Engineering - Capital Improvements

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS