Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on October 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary St to J.W. Powell Blvd

Closed
2026-446State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project in California. The scope of work involves the design of four monitoring wells and nine injection wells (seven operating and two standby) to replenish purified water into the Chino Groundwater Basin at an anticipated volume of 15,000 acre-feet per year. Key deliverables include a Basis of Design Report at the 30 percent design level, detailed design documents, and procurement packages for drilling and construction. The project must adhere to California Code of Regulations Title 22 for indirect potable reuse and follow ASCE (2007) guidelines for the Geotechnical Baseline Report. Construction for injection and monitoring wells is targeted to begin by May 2028, with well equipping starting by July 2029. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The selection process ranks consultants based on a 100-point scale, evaluating the team's qualifications and the consultant's understanding of the scope and efficiency. The top-ranked consultant will negotiate a not-to-exceed contract subject to approval by the IEUA Board of Directors. Compliance requirements include the Davis-Bacon Act, the Buy America Preference for Infrastructure Projects, and DBE requirements. Invoicing is conducted monthly via a standard Excel template with payments made through ACH.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in 2 months
NAICS: 541330
New
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves providing professional engineering services to design a system that delivers purified water from the Advanced Water Purification Facility to injection wells. Key responsibilities include conducting utility research and field investigations, developing a basis of design across multiple disciplines, creating design drawings at 30, 60, 90, and final levels, and providing engineering support during the bid award process. The contract is structured as a not-to-exceed agreement, with the final fee to be negotiated with the top-ranked consultant. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted via PlanetBids by January 26, 2027. Evaluation is based on a 100-point scale, including a 20-point interview component for the top three ranked firms. Consultants must comply with strict DBE requirements, federal and state grant funding mandates, and the Agency's Engineering Design Guidelines. All payments are processed via ACH, and the Agency retains ownership of all project materials and data.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The City of Flagstaff is seeking Statements of Qualifications from Arizona licensed professional engineering firms to conduct a Feasibility Study for the Lone Tree Road corridor from O'Leary Street to John Wesley Powell Boulevard. With an estimated budget of 350,000 dollars, the project aims to enhance regional mobility and establish a unique community gateway. The scope of work includes conducting a pre-NEPA environmental analysis, coordinating with ADOT and FHWA for traffic analysis at the I-40 intersection, and determining whether a traffic interchange or a grade-separated over/under-pass is required. Additionally, the selected firm will evaluate roadway configurations, identify necessary right-of-way acquisitions, and ensure the design aligns with the City's 2022 Active Transportation Master Plan to improve ADA compliance and multimodal safety. Key deliverables for the project include a final Feasibility Report, 15 percent design plans, and an engineer's construction cost estimate, with design services expected to be complete by October 2027. The City utilizes a qualifications-based selection process, evaluating firms based on project experience, approach, firm overview, and value-added local knowledge. The resulting contract will be a professional services agreement subject to Arizona state laws, including specific provisions for monthly invoicing and termination for convenience or non-appropriation of funds. Submittals must be provided electronically via the OpenGov platform by the November 2026 deadline.

General Info

Flagstaff seeks engineering firms for a 350,000 dollar Lone Tree Road feasibility study.

Documents

4
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, Low prioritycontract-document
Low

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Traffic Control Planning and DesignOpen now, due in 64 days
  • Electrical, Instrumentation, and Control (I&C) DesignOpen now, due in 64 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 5, 2026 to Nov 12, 2026.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City Engineering - Capital Improvements
Contacts2 people available
OfficeFlagstaff, AZ, 86001-5359, USA

Interested Companies (26)

AECOM Technical ServicesTallahassee, Florida
Ardurra GroupNewport Beach, CA
Beta Public RelationsFlagstaff, AZ

See All 26 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Lone Tree corridor is located within Flagstaff, Arizona, east of downtown, running north-south and crossing the Interstate-40 (I-40) corridor. The Regional Land Use and Transportation plan identifies Lone Tree as a minor arterial connection between downtown Flagstaff and JWP. A corridor study was completed in 2006, including a conceptual alternative providing the flexibility to implement a traffic interchange with I-40, as well as enhance the multi-modal initiatives of the community, including expansion of the Flagstaff Urban Trail System (FUTS) and accommodation for transit stops. The corridor study provided realignment options for Lone Tree Road between Woodland Drive and Pine Knoll Drive. For the purposes of this study, Option A - keeping Lone Tree along its current alignment - shall be assumed, as the relocation of Kinsey Elementary School is anticipated prior to implementation of improvements along this segment of Lone Tree Road. Additionally, the 2006 corridor study recommended a new alignment of Lone Tree Road from Pine Knoll Drive to JWP, including a new traffic interchange (TI). A current development, Juniper Point, has received civil plan approval to construct approximately 1,500-ft of the new Lone Tree alignment, referred to on the plans as Juniper Point Boulevard. This Juniper Point Boulevard alignment shall be assumed to represent the southernmost alignment for planning and design purposes, as well as the existing Lone Tree Road alignment. The selected firm shall collaborate with the City's Transportation Planning and Engineering Sections to evaluate traffic demand associated with existing entitlements, proposed developments, and anticipated future land uses within the Lone Tree Road project area. The model results will be provided to the firm to determine if a TI at the I-40 and Juniper Point Boulevard is required, or if a grade-separated over/under-pass without an interchange will meet long-range mobility and safety needs. Additionally, it is anticipated that the model results will be used to determine the ultimate cross-section for the existing Lone Tree Road segment south of Pine Knoll Drive, including an evaluation of whether a 3-lane or 5-lane configuration is warranted. The project presents an opportunity to improve pedestrian and bicycle infrastructure through improved ADA compliance, safer crossings, and greater separation from motor vehicle traffic. Reconstruction and expansion of the existing roadway, curb and gutter, utility adjustments, curb ramps, sidewalk, lighting, pavement markings, and signing are included in this project. A goal of the project is to improve multimodal safety and mobility by providing complete streets in accordance with the City's 2022 Active Transportation Master Plan (ATMP) The work is anticipated to occur partially within existing City of Flagstaff roadway right-of-way, and additional right-of-way is required in various locations. Full closure of Lone Tree Road for construction is not likely, therefore phasing of work shall be planned for in this design. Deliverables for this Project include, but are not limited to, draft and final Feasibility Report, preliminary environmental, drainage, traffic, utility and right-of-way analysis, 15-percent plans, and engineer's construction estimate. The Firm shall also conduct project update meetings, comment resolution, and public outreach including coordination, exhibit preparation and attendance of a public event. Lone Tree Road Corridor Study (2006) https://lonetreeoverpass.org/pdfs/Lone_Tree_Corridor_Final_Report_03_06.pdf Lone Tree Road Corridor Specific Plan (2008) https://www.flagstaff.az.gov/DocumentCenter/View/45062/LTCSP_application_MAY30_2008?bidId= For additional information on the City of Flagstaff's Active Transportation Master Plan https://www.flagstaff.az.gov/3181/Active-Transportation-Master-Plan For additional information on Flagstaff Regional Plan 2045 https://flagstaff-regional-plan-2045-flagstaff.hub.arcgis.com/ For additional information on City Flood Plain Regulations https://www.codepublishing.com/AZ/Flagstaff/html/Flagstaff12/Flagstaff1201000.html For additional information on Flagstaff Carbon Neutrality Plan https://connect.flagstaffaz.gov/CNPupdate Other relevant resources, reports and documents can be found on the City's website here: https://flagstaff.az.gov/3915/Reports-Documents Figure 1 - Location map within the City of Flagstaff
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum. Grading Criteria was revised and updated. Please download and rereview before submitting your company's SOQ. Thank you.
Addendum #2: Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3: Please use the See What Changed link to view all the changes made by this addendum.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS