Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Professional Engineering Services For The Design Of A Chlorination System At Marengo Reservoir

Closed
20260625001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 4 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The City of Alhambra Department of Utilities is soliciting proposals for professional engineering services to design a chlorination system improvement project at the Marengo Reservoir. The project involves replacing a 20-year-old on-site chlorine generation system with a new sodium hypochlorite storage and feed system. The comprehensive scope of work includes the demolition of the existing facility, construction of a new building, and the installation of reservoir mixing systems, water quality monitoring, and SCADA integration. The selected firm will manage all project phases, including existing conditions assessment, preliminary and final design, regulatory permitting support with the California State Water Resources Control Board Division of Drinking Water, and technical support during the bidding and construction phases. Proposals are due by 11:00 A.M. on July 23, 2026, and must be submitted in hard copy to the Utilities Department. The selection process utilizes a trade-off methodology, prioritizing the qualifications of the firm in municipal drinking water facilities, regional experience, and a proven track record with the Division of Drinking Water over the lowest cost. The contract is structured on a time and materials basis with a not-to-exceed cost proposal. Awarded consultants must maintain a City of Alhambra business license and provide minimum insurance coverage of 1,000,000 dollars for professional liability, contractual general liability, and comprehensive automobile liability. All designs must comply with NSF/ANSI/CAN 60 and 61 standards and be stamped by a Professional Civil Engineer registered in California.

General Info

Engineering services for Alhambra's Marengo Reservoir chlorination system improvement project due July 2026.

Place of Performance

Alhambra, CA, 91801, USA

Set-Aside

NONE

Documents

1

RFP2M26-7 Professional Engineering Services for Marengo Reservoir Chlorination System

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Alhambra, Department of Utilities
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Bid #RFP2M26-7: The City of Alhambra is seeking a qualified engineering firm to provide professional services for the design of a chlorination system improvement project at the Marengo Reservoir. The project involves replacing an existing 20-year-old on-site chlorine generation system with a new sodium hypochlorite storage and feed system. The scope includes the demolition of the existing facility, construction of a new building, and installation of reservoir mixing systems, water quality monitoring, and control systems. The design must emphasize operational reliability, redundancy, and standardization for future implementation at other city facilities. The selected consultant will be responsible for all phases from existing conditions assessment and preliminary engineering to final design (plans and specifications), regulatory permitting support with the Division of Drinking Water (DDW), and support during the bidding and construction phases.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS