Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on December 10, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Programmable Logic Controller & Human Machine Interface Svcs for Wastewater Treatment Plant Projects

Closed
461State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of San Mateo Public Works Department is soliciting Statements of Qualifications from qualified system integrator firms to provide Programmable Logic Controller (PLC) and Human Machine Interface (HMI) programming and commissioning support services for wastewater treatment plant projects under the Clean Water Program. The scope of work includes task management, submittal phase services, programming for Rockwell Automation PLC and Schneider Electric Wonderware HMI systems, and testing, installation, and warranty services. All work must adhere to enterprise-wide hardware and software standards for Allen-Bradley ControlLogix platforms to ensure uniformity across the process control system. Key deliverables include control narratives, loop descriptions, and factory and site acceptance test reports submitted in AutoCAD, ArcGIS, and PDF formats. The selection process is based on a quality-based trade-off methodology, evaluating firms on project experience and past performance, key personnel, project understanding, and references. A critical requirement for key personnel is a Project Manager with at least 10 years of experience and a California Professional Engineer license. Proposals must be submitted by January 19, 2018, consisting of six bound sets and one electronic PDF copy, with a strict 25-page limit for the main statement of qualifications. To prevent conflicts of interest, CH2M is prohibited from competing due to its program management role. The contract is structured as a Construction Manager at Risk agreement, with performance taking place in San Mateo, California.

General Info

San Mateo seeks system integrators for wastewater PLC and HMI programming and commissioning.

Documents

6

City of San Mateo Clean Water Program - Attachment D: Key Personnel Resume Template

DOCX, High priority: read this firstpast-performance
High

City of San Mateo Clean Water Program - PLC and HMI Programming Services Attachment A

PDF, High priority: read this firstsow
High

City of San Mateo Clean Water Program PLC Programming Standards

PDF, High priority: read this firstspecifications
High

City of San Mateo PLC and HMI Programming Services RFQ

PDF, High priority: read this firstrfq
High

ConsensusDocs 500 - Standard Agreement and General Conditions (GMP)

PDF, High priority: read this firstcontract-document
High

RFQ - PLC and HMI Services for San Mateo Wastewater

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Mateo
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Dhumal AturaliyeClean Water Program Contract Manager

Full Description

Show more
See the RFQ Notice, Request for Qualifications, and 4 attachments in the Related Documents section below.
Proposers who download the documents will not be notified of any addenda. It is the proposer's responsibility to check back on the website for any addenda that may have been issued or contact Dhumal Aturaliye, Clean Water Program Contract Manager at email For security reasons, you must enable JavaScript to view this E-mail address.
The documents can be large. Below are some helpful tips for accessing them:

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS