Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on August 10, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Project CSC 16770 "Elevator Mechanical Upgrade" - SP470217C0010

Awarded
SP4702-17-R-0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The scope of work requires the contractor to provide all transportation, labor, supervision, tools, and new manufacturer-specified parts to diagnose and repair the clutch assembly and power take-off system. Key technical requirements include disassembling tractor components, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing hydraulic pipes and filters as necessary. The contractor must verify proper clutch engagement and disengagement and test the PTO system under load to ensure the unit is restored to safe operating condition. This is a small business set-aside solicitation with a response deadline of November 3, 2026. Award will be based on best value, and bidders must submit a bid sheet, a completed supplier packet including a W-9 and self-certification form, and proof of insurance. The contract is subject to various federal regulations, including Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31 for Kentucky, and FAR clauses regarding the utilization of small business concerns and combating trafficking in persons. Final acceptance of the work is contingent upon inspection by the Facility Maintenance Department to verify operational functionality and adherence to manufacturer specifications.
Earle C. Clements Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 811310
New
SLED
Asphalt Storage Tank Maintenance and Repair
Solicitation # 601320000072188
The Texas Department of Transportation (TxDOT) issued Invitation for Bid (IFB) 601320000072188 in October 2026 for the maintenance and repair of two Duraco Model 8250 asphalt storage tanks located at the Gonzales Maintenance Facility in District 13. The scope of work includes the cleaning of tanks, installation of new manway gaskets and other necessary seals, and the off-site transport and disposal of all removed materials in compliance with Texas Health and Safety Code Chapter 361. All work must be performed according to manufacturer recommendations and applicable standards, with a final inspection required by a TxDOT representative prior to invoicing. Responses are due by November 6, 2026, at 3:00 p.m. Central Time and must be submitted via the Euna Procurement portal. To be considered, bidders must provide a comprehensive submission including a price schedule in Excel format, qualifications and references, a detailed approach to work, and a mandatory child support obligation certification. TxDOT will award the contract based on best value, primarily considering purchase price, compliance with specifications, and the risk of vendor non-performance. Eligible vendors must maintain a vendor performance rating of A, B, or C in the CPA Vendor Performance Tracking System and provide insurance from companies with an A.M. Best rating of A- or better.
Texas Department of Transportation

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 811310
New
SLED
Conveyance Maintenance Services
Solicitation # 26-1336
Chicago Public Schools is soliciting bids for Conveyance Maintenance Services under solicitation number 26-1336 to implement a comprehensive preventive maintenance program for conveyance equipment. The selected bidder will provide all labor, materials, and supervision necessary to ensure equipment remains safe and operational, adhering to the City of Chicago Municipal Code, ASME A17.1/CSA B44, ASME A17.3, and original equipment manufacturer standards. The contract includes a three-year initial term with the possibility of two automatic renewals of two years each. Services involve monthly preventive maintenance during normal working hours from 6:00 a.m. to 2:30 p.m., as well as 24/7 emergency callback support. Key deliverables include site-specific maintenance schedules, the use of CPS facilities software for reporting, and an annual Executive Summary Report based on a 7-point assessment rubric. The agreement will be awarded to the lowest, responsive, and responsible bidder based on evaluation factors including price, business stability, professional qualifications, past performance, and capacity. Bidders must submit a comprehensive package via Bonfire, including an Excel-based bid tabulation, audited financial statements for the last three fiscal years, three non-Board references, and a W-9 tax form. Compliance with MBE/WBE aspirational goals of 30% and 7% respectively is required, along with adherence to the Illinois Minimum Wage Law and various federal and state non-discrimination acts. Invoicing must be submitted electronically in PDF format, with payments processed according to the Local Government Prompt Payment Act. All shipments are designated as F.O.B. destination. The deadline for questions is November 6, 2026, and the final response deadline is November 20, 2026.
Chicago Public Schools

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 811310
New
SLED
Annual Inspection/Maint. and Repair on Generator at FMS #8
Solicitation # SRC0000037488
Solicitation SRC0000037488 is for the annual inspection, maintenance, and repair of a Speed Air air compressor (Model 1WD44, SN: D063475) at FMS #8 in Gadsden, Alabama. The scope of work includes replacing belts, collecting oil samples, and installing filters, cabinet filter mats, and repair kits for the oil and thermostatic valves. A mandatory site visit is required on November 18, 2026, at 10:00 AM at 5319 Airport Road, Gadsden, Alabama. The response deadline is November 23, 2026, and all bids must be submitted electronically through the Alabama Buys portal. The contract is managed by the Army MCA and the State of Alabama, with a maximum total value of 25,000 dollars over a potential five-year period, subject to annual renewals. Award evaluation will be based on price reasonableness, cost realism, and supplier qualifications, including professional licenses and insurance. Vendors must comply with the Code of Alabama, including the Beason-Hammon Alabama Taxpayer and Citizen Protection Act and registration requirements for foreign corporations. Payment will be handled electronically via P-cards, EFT, or state-issued credit cards. Final acceptance of services is contingent upon a satisfactory inspection by the State of Alabama in accordance with the Universal Commerce Code.
Army MCA_App 01_Real Property Operations & Maintenance, State Military Department

POSTED

1 day ago

DEADLINE

in 22 days
NAICS: 811310
New
SLED
Electrical & Automation Services
Solicitation # 9181
The City of Denton is soliciting proposals for Electrical and Automation Services to support 12 Wartsila 18V50SG units located at the Denton Energy Center. The selected contractor must ensure all equipment operates within Original Equipment Manufacturer specifications without voiding existing warranties. Key performance requirements include providing personnel and service offers within one week of notice and completing repairs and services within five weeks of evaluation. The City will award the contract based on best value, evaluating submissions through a weighted scoring system: 30% for schedule timeliness, 30% for compliance with specifications, 20% for indicators of probable performance, and 20% for total cost of ownership. Submissions must be made via IONWAVE or hard copy by December 2, 2026, at 2:00 PM CT. Hard copy responses must be sealed, limited to 200 pages, and bound only with staples or binder clips. Required documentation includes proof of Texas state registration, a conflict of interest questionnaire, and a safety record. The contractor must comply with Davis-Bacon prevailing wage rates, the Buy American Act, and ADA non-discrimination practices. Invoicing must be submitted to the City's Accounts Payable department within 30 calendar days of service completion, with payments processed within 30 days of receipt. All deliverables must be shipped with weather-resistant labeling and a packing slip to the designated Denton address.
City Of Denton

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 811310
New
SLED
In Shop Overhead Crane Maint Contract
Solicitation # 26-466MIL-ARNFF-B-54424
The Department of Military Affairs for the State of Illinois is soliciting bids under solicitation number 26-466MIL-ARNFF-B-54424 for the maintenance, service, annual inspection, and certification of twenty-eight overhead cranes located at various Army and Air National Guard facilities across Illinois. The scope of work requires the contractor to provide preventative maintenance during regular business hours and emergency services on a 24/7 basis. Key deliverables include annual certifications, load testing, monthly updated maintenance checklists, and quarterly reports detailing all repairs and parts used. All replacement parts must be Original Equipment Manufacturer (OEM) genuine parts, and the contractor must provide a one-year warranty on all materials and workmanship. The contract will be awarded to the lowest priced responsive and responsible bidder. Evaluation factors include price, financial resources, past performance, and the ability to provide required maintenance services. Bidders must submit responses electronically via the BidBuy portal by the November 17, 2026, deadline. Required documentation includes Vendor Disclosure and IPG Active Registered Vendor Disclosure forms. The awarded vendor must maintain comprehensive insurance coverage, including one million dollars in general commercial and auto liability, and comply with prevailing wage laws and the Buy American Act. Funding may be provided through a combination of state and federal sources, and the contract is contingent upon the availability of these appropriations.
ARNFFCLTIES466 - ARNG Facilities

POSTED

1 day ago

DEADLINE

in 17 days

AI Contract Overview

Show more

Project CSC 16770 is a firm-fixed-price contract for mechanical upgrades to elevators in Building 20 at the Defense Logistics Agency Land and Maritime facility. The scope of work involves the removal and replacement of various components for elevators 1 through 12, including door operators, clutches, restrictors, interlocks, rollers, hangers, and tracks, as well as traction machines, rope grippers, and hoist ropes for elevators 1 through 15. The project concludes with comprehensive testing and inspection of all units. The estimated value is between $500,000 and $1,000,000, with a period of performance of 365 days following the Notice to Proceed. The contractor is responsible for providing all labor, materials, and supervision while ensuring minimal disruption to the occupied building. Key requirements include adherence to IBC 2015, ASME safety codes, and NFPA standards, as well as the submission of a detailed work schedule and a fall protection plan if required. Award selection is based on the Lowest Price Technically Acceptable process, evaluating technical service capability, staffing qualifications, and past performance. Additionally, the contract includes a price evaluation preference for HUBzone small business concerns and mandates compliance with federal Green Procurement regulations.

General Info

Agency

N/A

Contract Value

$765,020

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

6 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 23, 2017 to Jun 29, 2017. The notice description changed.

Notice updated

Response deadline changed from Jun 29, 2017 to Jul 12, 2017. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
Service Requirement Summary; PR: 68328402 FR: 200066884 PSC: J099 CLIN: 0001 Material: V00010400 "Maintenance/Repair of Miscellaneous Equipment". Description: Project CSC 16770 "Elevator Mechanical Upgrades, Building 20". Firm-Fixed-Price Acquisition Unrestricted Acquisition with FAR 19.1307 "Price Evaluation Preference for HUBzone Small Business Concerns". Period of Performance: 365 days (After the Notice to Proceed Letter) FOB Inspection at Destination (DoDAAC# SC0707) Acquisition Authority: Federal Acquisition Regulation (FAR) Part 37, "Service Contracting"; FAR Part 15,"Contracting by Negotiation"; and (FAR) Part 12 "Acquisition of Commercial Items" regulations and procedures will be utilized. Delivery Location: Defense Logistics Agency Land and Maritime, Building 20 Unit of Issue: JB (JOB). This project is estimated between $500,000 and $1,000,000 One Time Purchase without options. NAICS: 811310 Business size: 7.5 MIL Description of Work 1.1 GENERAL: Work shall include all supplies, materials, equipment and labor to remove and replace door operators (elevators 1-12), door clutches (elevators 1-12), car door restrictors (elevators 1-12), interlocks (elevators 1-12), car and hoistway door rollers (elevators 1-12), car and hoistway door hangers(elevators 1-12), hoistway door tracks (elevators 1-12), traction machines/rope grippers (elevators 1-15) and hoist ropes (elevators 1-15) serving the existing building 20 elevators. In addition, testing and inspection of all the elevators will take place after completion of all work. The Contractor shall furnish all labor, material, supplies, equipment, tools, delivery, disposal and supervision required in performing all operations in conjunction with this project complete, in strict accordance with these specifications and Contract Drawing No. 4-572 subject to the terms and provisions of this contract. This section of the specifications is applicable to all other sections herein. This is an occupied building and therefore all work shall be done in a manner to cause minimum interference with the operation of the building. The Contractor shall not interrupt any services in the building without expressed written permission by the Contracting Officer. Prior to beginning work, the Contractor shall submit a detailed schedule reflecting the work required, the actual elevator shut-down date, and the length on construction, indication major milestones along the path. It is the Contractors responsibility to complete the work in the time allocated. The elevator must not be shut down until the materials are on site. If elevated work is required within the elevator shaft then a fall protection plan must be submitted to the contracting officer for approval. - 1.1.1 CODE AND STANDARD REFERENCES: a) All codes and standards referenced in this specification will be to the edition of the references as detailed in this section. All materials, work and services to be performed under these specifications shall be in compliance with the Codes listed in this section. b) Comply with applicable building Codes and elevator Codes at the project site, including but not limited to the following: 1) International Building Code (IBC) 2015. 2) American Society of Mechanical Engineers (ASME) A17.1-2016 Safety Code for Elevators and Escalators. 3) ASME A17.3-2015 Safety Code for Existing Elevators and Escalators. 4) ASME A17.2-2014 Guide for Inspection of Elevators and Escalators. 5) NFPA 70, National Electrical Code (NEC) 2017. 6) NFPA 72, National Fire Alarm Code, Current Edition. 7) NFPA 101 Life Safety Code, Current Edition. 8) O.S.H.A. Requirements for construction and repairs of existing buildings. 9) Elevator Industry Field Employees' Safety Handbook 2015. 1.2 CONTRACT DRAWINGS: The contract drawings indicate the extent and general arrangement of the existing facilities, new work, materials and equipment installations. If any departures from the contract drawings, other than minor adjustments, are deemed necessary by the Contractor, details of such departures and the reasons therefore shall be submitted to the Contracting Officer or their authorized representatives soon as practicable for approval. No such departures shall be made without the written approval of the Contracting Officer. 1.3 MATERIALS AND EQUIPMENT: Unless otherwise specified or indicated on the drawings, all materials used in this project shall be new and shall be in compliance with respective material specifications indicated. Materials shall be the standard products of a manufacturer regularly engaged in the manufacture of the product. Items of material/equipment shall essentially duplicate material/equipment that has been in satisfactory use at least two years prior to bid opening. 1.3.1 Materials and equipment shall be installed in accordance with the approved recommendations and instructions of the manufacturer for obtaining conformance with the contract documents. 1.3.2 Materials delivered to the site shall be inspected for damage, unloaded, and stored with a minimum of handling. Storage facilities shall be provided by the contractor at the job site for maintaining materials at temperatures and conditions recommended by the manufacturer. Storage accommodations shall afford easy access for inspection and identification of each shipment. 1.3.3 Warranty of Service: In addition to the warranty clause as specified in FAR 52.246-20 and (May 2001), the Contractor shall provide to the Government, upon the completion of the project, the standard warranty of the material/equipment offered by the manufacturer which extends beyond the one year warranty of service. 1.4 VERIFICATION OF DIMENSIONS: In addition to the "Site Investigation and Conditions Affecting the Work" clause under FAR 52.236.3 (Apr 1984), the Contractor shall familiarize himself thoroughly with all details of the work and working conditions, verify all critical dimensions and other data in the field, and advise the Contracting Officer or their authorized representative of any discrepancy before performing any work. 1.5 COORDINATION AND COOPERATION: The Contractor involved in the performance of this project shall coordinate the work to eliminate delay and shall submit, in a format provided by the Contracting Officer, within five (5) days after date of Notice to Proceed, a schedule of operations to the Contracting Officer or their authorized representative, for approval. All work shall be performed in strict accordance with the schedule of work approved by the Contracting Officer, unless any delay is found excusable within the meaning of the default clause, referenced elsewhere herein. The Contractor's central point of contact on this project will be the Contracting Officer, who will be assisted by the government project engineer and the government construction inspector. The areas at which the work is to be performed may remain active and operational during the performance of this contract. It is imperative that all work performed under this contract be scheduled and phased to minimize disruption of utility systems, personnel, vehicular traffic and provide accessibility to the buildings at all times. 1.6 DAILY ACTIVITY REPORTS: Shall be submitted by the Contractor to the Contracting Officer, or Government Inspector each day activity or work occurs at the job site. The daily report shall include the date, contract number and title, report number, contractor's name, weather conditions, work location, description of activity or work performed, safety actions, work hours, personnel, equipment, subcontractors, deliveries, and other pertinent information. 1.7 INTERRUPTIONS OF UTILITIES: 1.7.1 No utility services shall be interrupted or blocked off without approval of the Contracting Officer or their authorized representative. 1.7.2 Scheduling for interruption, shutdown of services shall be submitted in writing to the Contracting Officer or their authorized representative not less than SEVEN (7) days prior to date of all proposed interruptions. The request shall give the following information: (1) Nature of utility or system (sewer, water, electrical, fire sprinkler system, etc.) (2) Size of line and location. (3) Buildings, Services, and Equipment Affected. (4) Hours and date, estimated length of time of interruption 1.8 RECORD DRAWINGS: The Contractor shall maintain record drawings on file at the project site. As part of the final inspection and acceptance, the Contractor shall furnish the Contracting Officer or their authorized representative three (3) complete sets of Record Drawings. Record Drawings shall be kept up to date during the process of work and shall be made available to the Contracting Officer, or their authorized representative, upon request. 1.9 PROTECTION FROM DAMAGE: In addition to FAR 52.237-02 "Protection of Government Buildings, Equipment, and Vegetation" (Apr 84), the contractor shall take all the necessary precautions to protect Government equipment and property at the job site, and shall be responsible for any damage to the equipment and property that may occur as a result of his negligence in connection with the prosecution of the work performed. Damage to Government equipment or property shall be repaired by the Contractor at his expense. 1.10 DUST CONTROL: The amount of dust resulting from any work performed shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution. 1.11 CLEAN-UP: The contractor shall comply with FAR 52.236-12, "Cleaning-Up" (Apr 84). In addition, upon completion of the work at the end of each work shift, the contractor shall leave the premises in a clean and neat condition satisfactory to the Contracting Officer. Drop cloths or other suitable methods shall be used as required to protect the equipment and the personnel. Contractor shall remove the rubbish and debris from Government property daily, unless otherwise directed. 1.11.1 Remove and transport all debris and rubbish from the project site in a manner that will prevent spillage from streets and adjacent areas. The contractor shall comply with all applicable Federal, State and Local hauling and disposal regulations. 1.12 FINAL INSPECTION AND ACCEPTANCE: Upon completion of the entire project a final inspection will be performed by the contractor, the Contracting Officer or their authorized representative and authorized representatives from the Facilities Engineering Division, DS-FCI (Construction Administration Office, Operations & Maintenance Office and Engineering Office. Notes: (X) The solicitation will be available in FedBizOpps on its issue date of 05/22/2017 (X) The Small Business size standard is $17,500,000 (X) Specifications, plans or drawings are available and attached to the solicitation. (X) Combined Synopsis/Solicitation posted for 30 days. (X) Solicitation will be posted at http://www.fedbizopps.gov for 30 days. Solicitation will be open on 05/22/2017 and close 06/23/2017 until 1:00 p.m. (X) FAR 19.1307 "Price Evaluation Preference for HUBzone Small Business Concerns". FAR 52.219-4 "Notice of Price Evaluation Preference for HUBzone Small Business Concerns provision included in the solicitation. Other notes about FAR 19.1307 "Price Evaluation Preference for HUBzone Small Business Concerns"; A) The 10 percent factor shall be applied on a line item basis or to any group of items on which award may be made. Other evaluation factors described in the solicitation (e.g. transportation costs, rent-free use of Government facilities, etc,) shall be applied before application of the factor. B) The price paid shall not exceed the fair market price. Fair market price (FMP) is determined by the reasonable price guidelines at FAR 15. (X) DLA Internet Bid Board System (DIBBS) quotations are no acceptable for this solicitation. Offeror's must complete the entire solicitation including amendments previous posted in http://www.fedbizopps.gov. Proposals must be submitted on hard copy of this Request for Proposal (RFP) and scanned and emailed to contact@example.gov. Construction Cost Estimate must be submitted with your company proposal to be considered complete. (X) INFORMATION TO BE PROVIDED BY THE GOVERNMENT AND/OR THE VENDOR, AND CLAUSES/PROVISIONS THAT ARE REQUIRED TO BE PROVIDED IN PARTIAL OR FULLTEXT. IN ADDITION, DUE TO SYSTEM LIMITATIONS, SOME MANDATORY CLAUSES/PROVISIONS MAY BE DUPLICATED. IN THE EVENT DUPLICATED CLAUSES/PROVISIONS HAVE DIFFERENT DATES, THE MOST CURRENT IS APPLICABLE (X) The Service Act Wage Labor Rates Decision WD 15-4729 (Rev.-2/posted 01/03/2017) and WD 86-0233 (Rev.-34/posted on 01/05/2016). (X) Full and Open Competition FAR 6.101 - (b) Contracting officers shall provide for full and open competition through use of the competitive procedure(s) contained in this subpart that are best suited to the circumstances of the contract action and consistent with the need to fulfill the Government's requirements efficiently (10 U.S.C. 2304 and 41 U.S.C. 3301). GREEN PROCUREMENT All products proposed for use in, or requisitioned under this contract must conform to federal Green Procurement regulations as they relate to the Environmental Protection Agency's (EPA) Comprehensive Procurement Guidelines. These products include Energy Star or Federal Energy Management Program designated electronics; United States Department of Agriculture bio-based designated products; Electronic Product Assessment Tool designated electronics; alternative fuels and fuel efficiency; and nonozone depleting substances. Such products must meet contract performance requirements, taking into consideration price, competition, and availability factors. FAR 52.237-1 SITE VISIT COORDINATOR (MANDATORY REQUIREMENT) (a) Offerors are mandatory to attend an organized site visit by reporting to the DLA Installation Support-Columbus Engineering Services Branch , Building 308, Defense Supply Center (DSCC), Columbus, Ohio on June 12, 2017 at 1:30 AM eastern time. Please email Ricardo Blanco at contact@example.gov with a list of attendees' names, not nicknames will be allowed. Email should be submitted no later than 48 hours prior to the site visit. (b) Prospective offerors are notified that remarks or explanations provided during a site visit shall not qualify the terms of this solicitation. Unless and until this solicitation is amended in writing, terms of the solicitation and specifications remain unchanged.(c) Site visitors requiring interpretation or clarification of technical or contractual requirements included in this solicitation are encouraged to submit their questions and any information obtained during the site visit to the Contracting Officer, by contacting the individual identified on the face of the solicitation. Base map will be attached to the solicitation. No other Site Visit will be conducted after June 12, 2017 at 1:30 AM eastern time, no exemptions. (b) Contractor "MUST" attend to the Site Visit. No proposal will be accepted by the contracting officer if contractor do not attempt to the Site Visit. (c) Contractors must review and comply with REAL ID Act before Site Visit take places. QUESTIONS & ANSWERS All questions shall be asked via email. Questions must be asked no later than June 15, 2017 no later than 12:00 p.m. eastern time. COMPLETE PROPOSAL INSTRUCTIONS Contractors shall provide their proposal in the following manner, using zip file: 1. SF 1442; (including Section B/vendor fill-in provisions), one (1) PDF document. 2. SAM Certifications; evidence showing your company is registered in SAM's. One (1) PDF document. 3. Technical Service Capabilities; review Section M for technically acceptable considerations. One (1) PDF document. 4. Technical Qualifications of Proposed Staffing; review Section M for technically acceptable considerations. One (1) PDF document. 5. Past Performance; review Section M for technically acceptable considerations. One (1) PDF document. 6. Bid Bond; original copy must be submitted with your proposal. Liability limit shall cover the total value of your proposal. Also, if your company do not have a corporate seal. A separate memo shall be issued and submitted with your Bid Bond explaining the reason why your company do not have corporate seal. One (1) PDF document. 7. Subcontracting Plan required per FAR 19.702, Statutory requirements. 8. Contractor Cost Estimate; contract must complete all the columns including overhead, profit, and bond cost. One (1) PDF document. A. Note: the written qualifications statement shall be certified and signed by the principle of the contract firm. B. Note: A total of eight (8) documents shall be submitted by the contractor "proposal" to be considered a complete package. C. Note: SAM certification date must match proposal submission date. (X) FINAL INSPECTION AND ACCEPTANCE Upon completion of the entire project a final inspection will be performed by the contractor, the Contracting Officer or their authorized representative and authorized representatives from the Facilities Engineering Division, DS-FCIE (Construction Administration Office, Operations & Maintenance Office and Engineering Office). (X) Selection of an offeror for contract award will be made on the basis of an assessment of each offeror's response to the Request for Proposal (RFP). As a Request for Proposals (RFP) based on Lowest Price Technically Acceptable (LPTA) Source Selection Process, in accordance with Federal Acquisition Regulation (FAR) Part 15.101-2, the Government will make the award based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The THREE (3) evaluation factors for determination of technical acceptability consist of: 1. Technical Service Capability; 2. Technical Qualifications of Proposed Staffing; and 3. Past Performance.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS