Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Project Engineering and Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the engineering design of a floating solar system, encompassing structural, electrical, and environmental loading analyses to ensure the system's integrity and operational efficiency under site-specific conditions. The work is scoped as a subcontract under NAICS code 541330, indicating it is focused on engineering services, with the Reclamation District 108 in California as the contracting entity. The project is anticipated to support renewable energy initiatives by deploying solar infrastructure on water bodies, requiring detailed compliance with environmental and structural standards to mitigate risks from water exposure, weather events, and long-term degradation. The contract was posted on July 10, 2026, and is associated with a California-based public agency focused on water management and infrastructure, suggesting the floating solar installation may be integrated with existing water conservation or flood control systems. While the precise location of performance and point of contact are not specified, the work is expected to occur within the jurisdiction of Reclamation District 108, likely on a regulated water body under its oversight. The absence of set-aside information indicates the subcontract is open to all qualified firms without specific socioeconomic preferences, and the provided URL links to an official California environmental compliance portal where further project details may be accessible.

General Info

Engineering design contract for floating solar system on California water body under Reclamation District 108.

Agency

California → Reclamation District 108

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of RD108 Canal 14a Floating Solar Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 108
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Reclamation District 108
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Engineering design of the floating solar system, including structural, electrical, and environmental loading analysis.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. This professional services contract involves the design, bidding support, and engineering services during construction for a new municipal groundwater production well to replace and abandon the existing Corydon well. The project is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and matching existing vertical turbine equipment. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction and a negotiated fee for professional services. Proposals are due by September 1, 2026, via the PlanetBids portal. Award selection is based on demonstrated competence and professional qualifications, with weighted factors including relevant experience (25 percent), project approach (25 percent), scope and schedule (20 percent), innovation (10 percent), cost (10 percent), and overall proposal quality (10 percent). The contract is set aside for various small business categories, including Disadvantaged Business Enterprises (DBE). Compliance requirements are extensive, incorporating the Build America Buy America Act for domestic content, the Iran Contracting Act for proposals over one million dollars, and various federal regulations including 2 CFR Part 200 and the Department of Treasury ASAP payment system. The project is scheduled to start on November 2, 2026. Required submittals include a Preliminary Design Report, a detailed cost proposal broken down by task, and various certifications regarding lobbying, debarment, and the use of domestic iron and steel.
Ardurra Group, Inc.

POSTED

about 11 hours ago

DEADLINE

in 17 days
View Details