Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Project Inspection & Quality Assurance (Third-Party)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for third-party independent inspection and quality assurance services related to pipe installation, pressure testing, joint integrity, and backfill compaction for a water infrastructure project in Rancho Cucamonga, California. The scope requires strict adherence to AWWA standards and engineering specifications to ensure the integrity, safety, and long-term performance of the pipeline system. All inspections and testing must be conducted by qualified personnel using approved methodologies and documented to demonstrate full compliance with regulatory and design requirements. This subcontract, posted on July 9, 2026, under NAICS code 541330 for engineering services, is managed by the Cucamonga Valley Water District. The work is localized to the Rancho Cucamonga area and is intended to support municipal water system upgrades or new installations. The third-party inspector will operate independently of primary contractors to provide unbiased verification of construction practices and material quality throughout all phases of the project. Failure to meet the required standards could result in rework, delays, or rejection of completed work, making rigorous and continuous oversight essential to the project’s success.

General Info

Third-party inspection for water pipeline work in Rancho Cucamonga per AWWA standards.

Agency

California → Cucamonga Valley Water District

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Rancho Cucamonga, CA

Set-Aside

NONE

Documents

This scope was carved out of CP26019 Construct waterline in Ivy Lane and Scott Lane, north of Palo Alto Street Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Cucamonga Valley Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Cucamonga Valley Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Independent inspection and quality assurance for pipe installation, pressure testing, joint integrity, and backfill compaction to ensure compliance with AWWA and engineering standards.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified firms, specifically targeting Disadvantaged Business Enterprises (DBE), to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, mechanical, electrical, and instrumentation design, as well as the equipping, testing, and commissioning of the groundwater production well. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water standards, Riverside County, and California State Water Resources Control Board regulations. The solicitation is open to various small business set-asides, including SDB, WOSB, and VOSB. Proposals must be submitted by September 1, 2026, and must include a cover letter, a detailed project approach, staff qualifications, a five-year representative project list, and three professional references. Award selection is based on the most advantageous proposal, considering both price and other factors. Selected consultants must maintain active SAM registration, provide a 100 percent performance and payment bond, and adhere to California prevailing wage laws. Payment is processed via monthly itemized statements with a 45-day review period, though federal award reimbursements must be made within 30 calendar days. The contract also mandates strict adherence to Cal/OSHA safety standards and requires a dedicated Project Manager to coordinate all communications with the District.
Ardurra Group, Inc.

POSTED

44 minutes ago

DEADLINE

in 16 days
View Details