This Solicitation opportunity from Pennsylvania was posted on April 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The West Chester Area School District is soliciting sealed bids for Proposal No. 26-146, which involves flooring replacement in the boys and girls locker rooms and team rooms at G.A. Stetson Middle School in West Chester, Pennsylvania. This project is specifically restricted to flooring contractors who are currently approved installers of Nora by Interface Flooring Materials. Bids must be submitted electronically via the PennBid program by 11:00 AM on Wednesday, April 29, 2026. A mandatory pre-bid meeting is scheduled for Monday, April 20, 2026, at 3:30 PM at the school.
Submission requirements include a Non-Collusion Affidavit, a Contractor’s Qualification Statement, and a bid security in the form of a certified check or bid bond for ten percent of the bid amount. The successful bidder must provide Performance and Payment Bonds equal to 100% of the contract price. This project is subject to prevailing wage laws, and all personnel must obtain required Pennsylvania child abuse, criminal record, and federal background clearances before entering the site. The contract is based on AIA standard forms, and the district reserves the right to award the contract to the lowest responsive and responsible bidder.
HighAI Summary for 26-C090 East High School Roof Refurbishment Project Manual Volume 1: This document is the Project Manual Volume 1 for the West Chester Area School District's 26-C090 East High School Roof Refurbishment project. It includes bidding and contract requirements, general requirements, and specifications for roofing and related work. Key sections include the Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, and Performance and Payment Bond Forms. The solicitation invites sealed bids via PennBid with a deadline of January 22, 2026, and includes mandatory pre-bid meeting details, bonding requirements, and prevailing wage conditions. The document outlines submission instructions, bid security, and the district's rights regarding bid acceptance.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 26-G145 District Wide Chain Link Fence Repair & Replacement - West Chester Area School District: This document is a project manual and solicitation for sealed bids for the West Chester Area School District's District Wide Chain Link Fence Repair and Replacement project, Proposal No. 26-G145. It includes bidding and contract requirements, instructions to bidders, bid forms, bond forms, general conditions, wage rate determinations, and technical specifications. The bid opening is scheduled for May 21, 2026, with a mandatory pre-bid meeting on May 5, 2026, at multiple school locations. Bids must be submitted online via PennBid and include a non-collusion affidavit, contractor qualification statement, and bid security. The project is subject to prevailing wage requirements. The document provides detailed instructions on proposal submission, bid security, and contract award conditions.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for 26-G146 Flooring Replacement Bid Documents: This document is the Project Manual Volume 1 for the West Chester Area School District's 26-G146 Flooring Replacement project across various district-wide locations. It includes bidding and contract requirements such as Advertisement for Bids, Instructions to Bidders, Bid Forms, Bid Security, and Performance and Payment Bond Forms. The bid opening is scheduled for April 7, 2026, with a mandatory pre-bid meeting on March 20, 2026. Bids must be submitted online via PennBid and include a certified check or bid bond. The project is subject to prevailing wage requirements. The document provides detailed instructions on proposal submission, bid security, and qualifications, emphasizing the district's right to accept or reject bids.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G146 Flooring Replacement Stetson MS - West Chester Area School District: This document is the Project Manual for the West Chester Area School District's Flooring Replacement project at Stetson Middle School, Proposal No. 26-G146. It includes bidding and contract requirements, instructions to bidders, bid forms, and general conditions. The bid opening is scheduled for April 29, 2026, with a mandatory pre-bid meeting on April 20, 2026. Bidders must be approved installers of Nora by Interface Flooring Materials and submit bids online via PennBid. The project requires performance and payment bonds equal to 100% of the contract price and is subject to prevailing wage laws. The document outlines submission instructions, bid security requirements, and evaluation criteria.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 26-G204 Fugett Middle School Classroom Ventilator Replacement - Addendum #1: Addendum #1 dated July 20, 2026, for the Fugett Middle School Classroom Ventilator Replacement project. This document revises section 01 1100 (Summary of Work) to correct the date and time of the Mandatory Pre-proposal site visit to Monday, July 20, 2026, at 9:00 AM. Bidders are required to acknowledge this addendum on their bid proposal form to avoid disqualification.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G204 Fugett MS Classroom Ventilator Replacement Project Manual: This document is the Project Manual for the West Chester Area School District's 26-G204 Fugett Middle School Classroom Ventilator Replacement project. It includes Volume 1 covering Divisions 00, 01, and 23, with bidding and contract requirements, general requirements, and HVAC specifications. Key contents include the Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, Bidder's Qualifications, Non-Collusion Affidavit, Agreement Form, Performance and Payment Bond Forms, General Conditions, and PA Wage Rate Determination Schedule. The document outlines bid submission details, mandatory pre-bid meeting, proposal price guarantee, and bonding requirements. Bids are due by July 31, 2026, via PennBid, with a mandatory pre-bid meeting on July 20, 2026. The project is subject to prevailing wage requirements.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G205 Henderson High School Roof Refurbishment Project Manual Volume 1: This document is the Project Manual Volume 1 for the West Chester Area School District's 26-G205 Henderson High School Roof Refurbishment project. It includes bidding and contract requirements, general requirements, and technical specifications for roofing and related work. Key sections include the Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, Performance and Payment Bond Forms, General Conditions, and PA Wage Rate Determination Schedule. The document outlines the bid submission process via PennBid, bid security requirements, mandatory pre-bid meeting details, and prevailing wage applicability. The bid opening is scheduled for January 22, 2026, with a pre-bid meeting on January 9, 2026. The School District reserves the right to accept or reject bids in its best interest.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G208 RHS Stadium Asphalt Pavement Sealcoating Project Manual Addendum 3: This document is an addendum to the project manual for the West Chester Area School District's 26-G208 Bayard Rustin High School Stadium Asphalt Pavement Sealcoating project. It includes bidding and contract requirements, general requirements, and exterior improvements specifications. Key sections include Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, and Wage Rate Determination Schedule. The document outlines bid submission deadlines, mandatory pre-bid meeting details, bonding requirements, and prevailing wage conditions. Bids are to be submitted online via PennBid by March 24, 2026, with a mandatory pre-bid meeting on March 10, 2026. The addendum ensures bidders understand the scope, conditions, and submission instructions for the project.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G208 Rustin HS Stadium Asphalt Pavement Sealcoating Project Manual: This document is the Project Manual for the West Chester Area School District's 26-G208 Bayard Rustin High School Stadium Asphalt Pavement Sealcoating project. It includes bidding and contract requirements, general requirements, and exterior improvements specifications. Key sections include the Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, Bidder's Qualifications, Non-Collusion Affidavit, Agreement Form, Performance and Payment Bond Forms, General Conditions, and PA Wage Rate Determination Schedule. The document outlines the bid submission process via PennBid, mandatory pre-bid meeting details, proposal price guarantee, and bonding requirements. The project is subject to prevailing wage laws. The bid opening is scheduled for March 24, 2026, with a mandatory pre-bid meeting on March 10, 2026.
PDF
PDF, High priority: read this firstifb
HighAI Summary for 26-G210-R Bayard A. Rustin School Field House - Mechanical Upgrade: An Invitation for Bids (IFB) issued by the West Chester Area School District for mechanical upgrades to the Bayard Rustin High School Field House. The document includes the advertisement for bids, instructions to bidders, and a project manual index. Bids are due by September 22, 2026, via PennBid, with a mandatory pre-bid meeting on September 3, 2026. The project is subject to prevailing wage and requires performance and payment bonds.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G212 G.A. Stetson Middle School Boiler Replacement Project Manual: This document is the Project Manual for the West Chester Area School District's 26-G212 G.A. Stetson Middle School Boiler Replacement project. It includes bidding and contract requirements, general requirements, and heating system specifications. Key sections include the Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, Bidder's Qualifications, Non-Collusion Affidavit, Agreement Form, Performance and Payment Bond Forms, General Conditions, and PA Wage Rate Determination Schedule. The document outlines the bid submission process via PennBid, mandatory pre-bid meeting details, bid security requirements, and prevailing wage applicability. The bid opening is scheduled for March 5, 2026, with bids to be publicly opened and read aloud. The School Board reserves the right to accept or reject bids in the district's best interest.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for 26-G213 HVAC Pump VFD Replacement Project Manual: This document is the Project Manual for the West Chester Area School District's 26-G213 HVAC Pump VFD Replacement at G.A. Stetson Middle School. It includes bidding and contract requirements, general requirements, and technical specifications. Key sections cover the Advertisement for Bids, Instructions to Bidders, Bid Forms, Bid Security, Performance and Payment Bonds, General Conditions, and Wage Rate Determination. The document specifies bid submission via PennBid by March 5, 2026, with a mandatory pre-bid meeting on February 16, 2026. It outlines bid security requirements, proposal price guarantees, and the district's rights regarding bid acceptance. The project is subject to prevailing wage laws. This manual serves as the primary solicitation and contract guidance for bidders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 01 for Sarah Starkweather ES Additions and Renovations: This document is Addendum 01 dated October 3, 2025, for the Additions and Renovations project at Sarah Starkweather Elementary School, West Chester Area School District. It serves to amend and clarify the original contract documents, including replacement of several specification sections and architectural, plumbing, and mechanical drawings. The addendum establishes that it governs over conflicting documents, specifies standards of quality, and requires bidders to acknowledge receipt. It includes detailed revisions to project phasing floor plans, door hardware, plumbing and mechanical plans, and provides attachments such as bidder Q&A and updated specifications and drawings. The addendum is critical for bidders to incorporate into their proposals and ensures alignment with updated project requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 02 for Hillsdale Elementary School Renovations: Addendum 02 dated unspecified date for the Additions and Renovations to Hillsdale Elementary School. This document amends and clarifies contract documents including specifications and drawings. It replaces several specification sections entirely, adds new specification sections, and revises geotechnical exploration reports. Numerous drawings across civil, architectural, and plumbing disciplines are replaced or reissued with detailed changes such as revised boring locations, pavement markings, ceiling plans, door schedules, and plumbing piping notes. The addendum governs over conflicting project manual or drawing items and requires bidders to acknowledge receipt in their bid forms. It emphasizes adherence to specified products and standards of quality.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 03 for Sarah Starkweather ES Renovations: Addendum 03 dated unspecified for the Additions and Renovations to Sarah Starkweather Elementary School. This document amends and clarifies contract documents, superseding conflicting items in the Project Manual and Drawings. It includes specification replacements and revisions across multiple sections such as Bid Form, Summary of Work, Multiple Contract Summary, Unit Prices, Subsurface Investigation, Roof Accessories, Aluminum-Framed Entrances, Quarry Tile, Wood Stage Flooring, HVAC Duct Insulation, Lighting Controls, Switchboards, Lighting Protection, Transfer Switches, Wireless Clock System, and Earthwork. It also replaces and reissues numerous civil and architectural drawings with updated contour information, details, and plans. Bidders must acknowledge this addendum in their bids, and no pre-bid substitutions are allowed. The addendum sets standards for quality and product specifications to be met or exceeded during construction phases extending through 2028.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 04 for Sarah Starkweather ES Renovations: Addendum 04 dated for the Additions and Renovations to Sarah Starkweather Elementary School. This document amends and clarifies contract documents including specifications and drawings. Key changes include revisions to aluminum framed entrances, ceramic tiling, toilet accessories, HVAC duct insulation, structured cabling, and deletion of certain specification sections. Several architectural and mechanical drawings are replaced or reissued with updates such as additional construction fence locations, temporary partitions, enlarged toilet room plans, and ductwork modifications. Bidders must acknowledge this addendum in their bid form and base bids only on specified products. This addendum governs over conflicting project manual or drawings.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 for 26-G208 Rustin HS Stadium Parking Lot Sealcoat: Addendum #1 for the West Chester Area School District project 26-G208 at Bayard A. Rustin High School Stadium Parking Lot and Drive Asphalt Pavement Sealcoating. This addendum includes updated drawings, an updated Prevailing Wage Rate Schedule (Section 00 7346), and a revised Bid Form (Section 00 4100) with bid bond language. Bidders must acknowledge this addendum and any others issued to avoid disqualification. The document also contains detailed prevailing wage rates effective as of various dates for multiple labor classifications relevant to the project.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for Addendum #1 for WCASD 25-G212 Stetson Middle School Boiler Replacement: This document is Addendum #1 for the West Chester Area School District project 26-G212 G.A. Stetson Middle School Boiler Replacement. Dated February 26, 2026, it announces a bid date extension with the new bid submission deadline set for Thursday, March 19, 2026, at 11:30 AM. It also specifies that all questions must be submitted through the PennBid solicitation portal by Thursday, March 12, 2026, at 12:00 PM.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for Addendum #1 for WCASD 25-G213 Stetson Middle School HVAC Pump VFD Replacement: This document is Addendum #1 for the West Chester Area School District project 26-G213 at G.A. Stetson Middle School involving HVAC Pump VFD Replacement. Dated February 26, 2026, it announces a bid date extension to Thursday, March 19, 2026, at 12:00 PM. It also specifies that all questions must be submitted through the PennBid solicitation portal by Thursday, March 12, 2026, at 12:00 PM.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 for WCASD 26-C090 East High School Roof Refurbishment: This document is Addendum #1 for the West Chester Area School District (WCASD) project 26-C090 East High School Roof Refurbishment. It revises the Instructions to Bidders section 00 2113, changing the bid due date and time to 12:30 PM on Tuesday, January 27, 2026. Bids will be received online via the PennBid website and publicly opened at the Facilities and Operations Center Building in West Chester, PA. The addendum requires bidders to acknowledge this and all other addenda on the bid proposal form, with failure to do so potentially resulting in disqualification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 1 for WCASD 26-G145 District Wide Chain Link Fence Repair & Replacement: This document is Addendum #1 for the West Chester Area School District project 26-G145, concerning district-wide chain link fence repair and replacement. It provides clarifications on the scope of work, including updated bid schedules, work start and completion dates, and specific scope additions and deletions for various school fields. The addendum includes updated drawings, bid forms, and bid tabulations reflecting these changes. Bidders are required to acknowledge this addendum in their proposals to avoid disqualification. The document also contains a detailed drawing index and an updated bid form section with unit prices and performance requirements for the contractor.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #1 for WCASD 26-G205 Henderson High School Roof Refurbishment: This document is Addendum #1 for the West Chester Area School District (WCASD) project 26-G205, Henderson High School Roof Refurbishment. It revises the Instructions to Bidders section 00 2113, changing the bid due date and time to 1:00 PM on Tuesday, January 27, 2026. Bids will be received online via the PennBid website and publicly opened at the Facilities and Operations Center Building in West Chester, PA. The addendum requires bidders to acknowledge this and all other addenda on the bid proposal form, with failure to do so potentially resulting in disqualification. This addendum is part of the contract documents and is critical for bidders to comply with submission requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #2 and Bid Form for District Wide Chain Link Fence Repair & Replacement: This document is Addendum #2 for the West Chester Area School District project 26-G145, concerning district-wide chain link fence repair and replacement. It clarifies the scope and approximate linear footage for fence replacement at Base Bid School 3 - East High School fields 2218 and 2219. The addendum updates the bid form accordingly and requires bidders to acknowledge all addenda to avoid disqualification. The attached bid form includes detailed base bid areas for multiple schools, unit prices, subcontractor disclosure requirements, and submission instructions. The document emphasizes compliance with contract documents and applicable safety and regulatory laws. The addendum was issued to correct bid quantities and update the bid tabulation in Penn Bid.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #2 for 26-G208 RHS Stadium Lot & Dr Sealcoat: This document is Addendum #2 for the West Chester Area School District project 26-G208 at Bayard A. Rustin High School Stadium Parking Lot and Drive Asphalt Pavement Sealcoating. It corrects the Pre-Bid Meeting date to Tuesday, March 10, 2026, at 3:00 PM, and updates the Penn Bid Website posting to reflect this mandatory meeting. Bidders must attend the meeting to be eligible and acknowledge all addenda on their bid proposal forms to avoid disqualification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 for 26-G208 RHS Stadium Parking Lot Sealcoat: Addendum #2 for the West Chester Area School District project 26-G208 at Bayard A. Rustin High School Stadium Parking Lot and Drive Asphalt Pavement Sealcoating. This addendum corrects the Pre-Bid Meeting date to Tuesday, March 10, 2026, at 3:00 PM, held at Bayard Rustin High School, 100 Shiloh Road, West Chester, PA. It also updates the Penn Bid Website posting to reflect this change. Bidders must acknowledge this and all other addenda on the bid proposal form to avoid disqualification.
PDF
PDF, High priority: read this firstaddendum
HighAI Summary for Addendum 2 for Bayard A. Rustin High School Field House Mechanical Upgrades: Addendum #2 for project 26-G210 Bayard A. Rustin High School Field House Mechanical Upgrades issued by West Chester Area School District. It includes a correction to a note from Addendum 1 regarding the submission of bids on the revised Bond Form, emphasizing that failure to do so will result in disqualification. It also clarifies that no revised Bid Form will be issued or submitted. Bidders must acknowledge this and all other addenda on the bid proposal form to avoid being considered nonresponsive.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #2 - G.A. Stetson Middle School Boiler Replacement Bid Form Revision: Addendum #2 for the G.A. Stetson Middle School Boiler Replacement project issued by West Chester Area School District. This document includes revisions to the Bid Form (Section 00 4100.01) dated March 12, 2026. Key updates include salvaging the burner and primary pump for turnover to the district, and details on the base bid, alternates, unit prices, and submission requirements. The addendum outlines contractor performance requirements, major subcontractor disclosures, and necessary attachments for bid submission via PENNBID. It serves as an official amendment to the original solicitation documents.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #2 - Stetson Middle School HVAC Pump VFD Replacement Bid Form Revision: Addendum #2 for the West Chester Area School District project 26-G213 at G.A. Stetson Middle School HVAC Pump VFD Replacement. This document dated March 12, 2026, revises the Bid Form (Section 00 4100.01) including updates to the base bid items, alternates, and submission requirements. It outlines bid security, unit prices, major subcontractor disclosures, and instructions for proposal submission via PENNBID. The addendum ensures bidders acknowledge receipt and incorporate changes into their proposals, maintaining compliance with contract terms and timelines.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 3 for Henderson High School Roof Refurbishment: Addendum #3 for the West Chester Area School District project 26-G205 Henderson High School Roof Refurbishment dated with revisions to the Summary of Work section. It details the scope of work for the auditorium dressing room roof and auditorium entrance roof, including removal of ballast stone, installation of Secure Rock Cement Board, cleaning and priming procedures, sealant application, base coat, reinforcement, and top coat specifications. Bidders must acknowledge this addendum on the bid proposal form to avoid disqualification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 3 for WCASD 26-G208 RHS Stadium Sealcoating Project: This document is Addendum #3 for the West Chester Area School District project 26-G208 at Bayard A. Rustin High School Stadium Parking Lot and Drive Asphalt Pavement Sealcoating. It corrects the bid due time to 11:00 AM on March 24, 2026, aligning it with the Penn Bid Documents. The previous bid time was incorrectly listed as 12:00 AM. Bidders must acknowledge this and all other addenda on their bid proposal forms to avoid disqualification.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 3 for WCASD 26-G208 RHS Stadium Sealcoat Project: This document is Addendum #3 for the West Chester Area School District project 26-G208 at Bayard A. Rustin High School Stadium, concerning parking lot and drive asphalt pavement sealcoating. It corrects the bid due time to 11:00 AM on March 24, 2026, aligning it with the Penn Bid Documents. The previous bid time was incorrectly listed as 12:00 AM and has now been corrected. Bidders must acknowledge this addendum on their bid proposal forms to avoid disqualification.
PDF
PDF, High priority: read this first8 pages · rfi
HighAI Summary for City of Pasadena Power Plant Turbine Engine RFI January 2026: This Request for Information (RFI) issued by the City of Pasadena Water & Power Department on January 8, 2026, seeks information on the availability of a lease engine for a GE LM6000 PC turbine for planned or emergency utility needs over two years starting October 2025. The document outlines the background of the Glenarm Power Plant's turbine units, scope of work, submission instructions, and contact details. It aims to gather vendor insights on turnkey solutions, quick mobilization, and reliability to guide future procurement strategies. The RFI includes a timeline with question and proposal submission deadlines and emphasizes that no contract will be awarded from this process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Fugett MS Area D - Floor Plans and Sections: Technical architectural drawings and floor plans for Area D of Fugett MS, including 100, 200, and 300 level floor plans and Section A. The document includes revision history and architectural seals, serving as technical specifications for construction.
PDF
PDF, High priority: read this firstpre-bid-agenda
HighAI Summary for Pre-Bid Agenda and Sign-in Sheet for Project 26-G146 District Wide Floor Repairs: This document is the Pre-Bid Agenda and Sign-in Sheet for Project 26-G146 District Wide Floor Repairs at Stetson Middle School, dated April 20, 2026. It outlines the meeting schedule, bid submission deadlines, and project timeline including work start and completion dates. Key agenda items include bid due date (April 29, 2026), question submission deadline (April 27, 2026), award date (May 28, 2026), and employee clearance requirements. The agenda details the scope of work for floor repairs, including removal and disposal of existing flooring, material responsibilities, and protection of surrounding surfaces. It also specifies bid submission requirements such as signed bid form, bid bond, non-collusion affidavit, contractor qualifications, and surety agreements. The document emphasizes compliance with prevailing wage and certified payroll submission with invoices.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for Pre-Bid Meeting Agenda for East High School Masonry Restoration Project 26-C091: This document is the agenda and sign-in sheet for the pre-bid meeting held on March 13, 2026, for the East High School Project 26-C091 Exterior Masonry Restoration of Auxiliary Gym Walls. It outlines the schedule including bid due date (March 24, 2026), question submission deadline (March 19, 2026), award timeline (April 2026), and work period (June 15 to August 14, 2026). Key bid scope details include brick removal and replacement, flashing installation, and unit pricing for additional brick replacement. Submission requirements cover signed bid forms, bid bonds, non-collusion affidavits, contractor qualifications, and surety agreements. The document emphasizes compliance with prevailing wage and certified payroll requirements, and notes that discrepancies in bid documents may lead to disqualification.
PDF
PDF, High priority: read this firstpre-bid-agenda
HighAI Summary for Pre-Bid Meeting Agenda Sheets for Project 26-G146 District Wide Floor Repairs: This document contains the agenda and sign-in sheets for the Pre-Bid Meetings held on March 20, 2026, for Project 26-G146 District Wide Floor Repairs at East Goshen Elementary School and Westtown Thornbury Elementary School. It outlines the schedule for bid submission (due April 7, 2026), question submission deadline (March 31, 2026), award timeline, and work period (June 15 to August 14, 2026). Key topics include bid scope, submission requirements such as signed bid forms, bid bonds, non-collusion affidavits, contractor qualifications, and surety agreements. The document also emphasizes prevailing wage requirements, employee clearances, and proper disposal of materials. It serves as a critical guide for prospective bidders to understand the procurement process and submission instructions.
PDF
PDF, High priority: read this firstpre-bid-agenda
HighAI Summary for Pre-Bid Sign in & Agenda for Project 26-G212 Boiler Replacement: This document is the Pre-Bid Sign in and Agenda for the Project 26-G212 Boiler Replacement at Stetson Middle School. It includes a sign-in sheet for attendees of the pre-bid meeting held on February 16, 2026, and an agenda from the meeting on February 4, 2026. Key details include the bid submission deadline of March 5, 2026, question submission deadline of February 26, 2026, and award scheduled for April 2026. The work is to begin on or after June 15, 2026, and be completed by August 14, 2026. The agenda outlines bid scope, submission requirements, prevailing wage compliance, and contractor qualifications. This document is critical for bidders to understand the schedule, requirements, and procedures for the boiler replacement project.
PDF
PDF, High priority: read this firstpre-bid-agenda
HighAI Summary for Pre-Bid Sign-in and Agenda Sheets for Project 26-G213 HVAC Pump VFD Replacement: This document contains the pre-bid sign-in sheet and agenda for the HVAC Pump and VFD Replacement project (Project 26-G213) at G.A. Stetson Middle School. The pre-bid meeting was held on February 16, 2026, at 10:00 AM. It includes attendee information, meeting location, and detailed agenda items such as bid submission deadlines, question submission procedures, award schedule, work timeline, bid scope, and submission requirements including bid form, bid bond, affidavits, contractor qualifications, and certifications. The document emphasizes compliance with prevailing wage and certified payroll requirements and notes potential disqualification causes.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 26-002 District-wide Elevator & Wheelchair Lifts Maintenance: This document is the Request for Proposal (RFP) 26-002 issued by West Chester Area School District for district-wide elevator and wheelchair lifts inspection, maintenance, and emergency repair services. It includes bidding and contract requirements, instructions to bidders, and a bid form with base and alternate bid pricing for contract years 2026-2029. The RFP specifies submission deadlines, proposal price guarantees, and detailed scope of work including hourly rates for emergency and non-emergency repairs. The document is intended for contractors to submit sealed bids via the PennBid program by May 5, 2026.
PDF
PDF, High priority: read this firstbid-tabulation
HighAI Summary for STARKWEATHER ES Bid Tabulation 301025: This document is a bid tabulation for the Starkweather Elementary School project under SGA Project Number 225241. It includes detailed bid opening information dated October 30, 2025, listing multiple construction categories such as General Construction, Electrical, Mechanical, Plumbing, Sprinkler, and Roof Construction. The tabulation shows the low bids and bidders for each category, with total bid amounts and unit costs for various construction tasks. It also includes alternate bid options and quantity allowances included in the base bid price. The document serves as a critical record of bid prices and bidders for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for WCASD 25-088 East Bradford ES Roof Refurbishment Addendum 1: Addendum #1 for the West Chester Area School District project 25-C088 East Bradford Elementary School Roof Refurbishment revises the Instructions to Bidders, specifically updating the bid due date to December 16, 2025, at 11:00 AM. Bids will be received online via PennBid and publicly opened and read aloud at the Facilities and Operations Center Building. Bidders must acknowledge this addendum on their bid proposal form to avoid disqualification. This addendum becomes part of the contract documents for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for WCASD 25-088 East Bradford ES Roof Refurbishment Addendum #2: This document is Addendum #2 for the West Chester Area School District project 25-C088 East Bradford Elementary School Roof Refurbishment. It notifies that the bid date is postponed indefinitely and the project is cancelled. If the district decides to proceed, a new project with a different number will be advertised. This addendum becomes part of the contract documents for the project.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for WCASD 25-088 East Bradford ES Roof Refurbishment Pre-Bid Meeting Agenda: This document is the Pre-Bid Meeting Agenda for the East Bradford Elementary School Roof Refurbishment project (Project 25-C088 (2)) dated January 19, 2026. It outlines the schedule for bid submission, question deadlines, award timing, and work period. Key agenda items include bid submission requirements such as bid form, bid bond, non-collusion affidavit, contractor qualifications, and manufacturer's certification. The scope covers roof scanning, insulation replacement, and solar-ready PVC fleece back roof covering with a 25-year warranty. It also mentions coordination with solar installers, prevailing wage requirements, and contractor responsibilities for permits. The document emphasizes the need for manufacturer's approved installers and the consequences of discrepancies in bid documents.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for WCASD 25-C088 (2) East Bradford ES Roof Refurbishment Project Manual Volume 1: This document is the Project Manual Volume 1 for the West Chester Area School District's East Bradford Elementary School Roof Refurbishment project, Proposal No. 25-C088 (2). It includes bidding and contract requirements, general requirements, and technical specifications for roofing and related work. The manual contains the Advertisement for Bids, Instructions to Bidders, bid forms, bond forms, general conditions, wage rate determinations, and detailed sections on roofing materials and installation. The bid opening is scheduled for February 24, 2026, with a mandatory pre-bid meeting on January 19, 2026. Bids must be submitted via PennBid and include performance and payment bonds. The document outlines submission instructions, bid security requirements, and the district's rights regarding bid acceptance.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for WCASD 26-C090 East High School Roof Refurbishment Addendum 2: Addendum #2 for the West Chester Area School District project 26-C090 East High School Roof Refurbishment dated 2023. This document replaces the Performance Bond Form (Section 00 6113.13) and Payment Bond Form (Section 00 6113.16) in their entirety. It emphasizes the requirement for bidders to use the revised bond forms in their bids, with failure to do so resulting in disqualification. The addendum includes detailed bond form language outlining obligations, legal jurisdiction, and terms for performance and payment bonds related to the contract.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for WCASD 26-C091 East HS Exterior Masonry Restoration - Aux Gym Rising Walls Project Manual Volume 1: This document is the Project Manual Volume 1 for the West Chester Area School District's East High School Exterior Masonry Restoration - Aux Gym Rising Wall project, Proposal No. 26-C091. It includes bidding and contract requirements such as Advertisement for Bids, Instructions to Bidders, Bid Form, Bid Security Form, and other related sections. The manual outlines the project scope, bidding instructions, bond requirements, and prevailing wage conditions. Bids are to be submitted online via PennBid by March 24, 2026, with a mandatory pre-bid meeting on March 13, 2026. The document serves as a primary solicitation for contractors interested in submitting bids for this restoration project.
PDF
PDF, High priority: read this firstpre-bid-agenda
HighAI Summary for WCASD 26-G145 District Wide Chain Link Fence Repair Pre-Bid Walk Agenda: This document is the pre-bid meeting agenda for Project 26-G145, District Wide Chain Link Fence Repair & Replacement for WCASD. The meeting is scheduled for May 5, 2026, at multiple school locations. It outlines critical dates including the bid due date of May 21, 2026, question submission deadline of May 12, 2026, and tentative award schedule in May 2026. The work schedule is from June 15 to July 24, 2026. The agenda covers bid submission requirements, prevailing wage and certified payroll obligations, permit responsibilities, and detailed base bid scopes for five school sites. It also emphasizes the importance of submitting all required documents via PennBid, including signed bid forms, bid bonds, affidavits, and contractor qualifications. Addendum #1 is pending with additional scope details.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for WCASD 26-G205 Henderson High School Roof Refurbishment Addendum #2: Addendum #2 for the West Chester Area School District project 26-G205 Henderson High School Roof Refurbishment. This document replaces the Performance and Payment Bond Project Manual Sections 00 6113.13 and 00 6113.16 entirely. It includes updated bond forms that bidders must use to avoid disqualification. The addendum emphasizes the legal obligations and terms of the bonds, including performance guarantees, payment guarantees, and surety responsibilities under Pennsylvania law. The document is critical for bid submission compliance and contract performance assurance.
PDF
PDF, High priority: read this firstpre-bid-meeting-agenda
HighAI Summary for WCASD 26-G208 Pre Bid Meeting Agenda 031026: This document is the Pre-Bid Meeting Agenda for the Bayard Rustin High School Project 26-G208 Stadium Parking Lot & Drive Asphalt Pavement Sealcoat. The meeting is scheduled for March 10, 2026, at 3:00 PM at Bayard A. Rustin High School Stadium. It outlines critical dates including the bid due date of March 24, 2026, questions due by March 16, 2026, and tentative award in April 2026. The work schedule is from June 15 to July 6, 2026. It specifies requirements for prevailing wage certified payrolls, contractor responsibility for permits, and the base bid scope involving SealMaster asphalt sealcoat and CrackMaster crack filler application as per the project specifications.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for WCASD 26-G208 Rustin HS Stadium Parking Lot & Drive - Sealcoat Pre-Bid Meeting: This document is a pre-bid meeting notice for the Bayard Rustin High School Project 26-G208 involving the stadium parking lot and drive asphalt pavement sealcoat. The meeting was held on March 10, 2026, at the high school stadium. It outlines critical dates including the bid due date of March 24, 2026, questions due by March 16, 2026, and tentative award in April 2026. The work is scheduled to begin on or after June 15, 2026, and complete by July 6, 2026. The document also specifies requirements such as prevailing wage certified payroll submissions, contractor responsibility for permits, and a lump sum base bid scope for sealcoating and crack filling as per the project specifications.
Ref. #: West Chester Area School District, Chester County The West Chester Area School District, Chester County, Pennsylvania, solicits sealed bids from flooring contractors who are currently approved installers of Nora by Interface Flooring Materials for the G.A. Stetson Middle School in West Chester, PA for the following contracts: Proposal No. 26-146 Flooring Replacement Boys & Girls Locker Rooms and Team Rooms Sealed bids for West Chester Area School District, School – Project Name project within the West Chester Area School District, Chester County, Pennsylvania, will be received online via the PennBid Program (www.pennbid.net ) by West Chester School District until 11:00 AM prevailing time on Wednesday, April 29, 2026, at which time they will be publicly opened via PennBid and read aloud at the Facilities and Operations Center Building, 1181 McDermott Dr, West Chester, PA 19380.
All bids must be accompanied by a Non-Collusion Affidavit and a Contractor’s Qualification Statement. Bids must remain valid for sixty (60) days after the date of the bid opening and may be rejected at any time prior to the expiration of said date.
Bids must include a certified check or bid bond, with a corporate surety authorized to do business in Pennsylvania in the amount of ten percent (10) of the amount of the bid, as posted
through PennBid, made payable to the West Chester Area School District. Checks or bonds will be returned to unsuccessful bidders after the contract has been awarded, or the bids rejected.
The successful bidder’s check or bond will be returned when his contract has been properly completed. In case the successful bidder fails to enter into contract within ten (10) days after
notification of acceptance of bid, said check or bond shall be forfeited to the School District.
The successful bidder will be required to furnish Performance and Payment Bonds in amounts equal to 100% of the contract price and shall be included in the contractor’s bid amount. Surety shall be satisfactory to the School District.
All Bidding documents are available online at no cost at PennBid (https://pennbid.bonfirehub.com/projects) and will become available starting Tuesday, April 14, 2026, after 4:00 PM via PennBid.
All questions will be received through the PennBid solicitation until Monday, April 27, 2026, at 12:00 Noon.
There will be a mandatory pre-bid meeting held on Monday, April 20, 2026, at 3:30 PM at the G.A. Middle School, 1060 Wilmington Pike, West Chester, PA 19382.
This project is subject to prevailing wage.
The School Board reserves the right to accept or reject any or all Bids for any or no reason, to waive informalities and irregularities, and to make or not make awards in the best interest of the West Chester Area School District.
More opportunities from Pennsylvania → Chester County
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.