This Solicitation opportunity from California was posted on December 14, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PRT | As-needed Hazardous Waste
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the Port of San Francisco’s requirement for specialized hazardous materials management and related services along its seven-and-a-half-mile waterfront territory. This area extends from Fisherman’s Wharf and Aquatic Park to the Pier 98 shipping terminals and Heron’s Head Park. Due to the diverse nature of their operations, which include regulated waste handling, emergency spill response, demolition, abatement, building restoration, and marine salvage, the Port must ensure effective mitigation of risks posed by hazardous materials to people, property, and the environment. These materials arise from routine activities, public disposal facilities, illegal dumping, and accidental releases, necessitating a comprehensive and flexible service framework. The contract is structured into three distinct service areas, each representing different facets of hazardous waste management and environmental response. Service Area 1 focuses on regulated waste removal, on-land spill response and cleanup, confined space safety support, recovery, and related traffic control. Service Area 2 covers on-land demolition, hazardous materials abatement, restoration of damaged buildings, and excavation/removal of contaminated soils. Service Area 3 addresses over-water demolition, hazardous materials cleanup, and marine vessel salvage. The Port plans to award one or more master agreements for these services on an as-needed basis, allowing respondents to propose for any combination of service areas. This solicitation reflects the Port’s commitment to maintaining safety and environmental sustainability across its waterfront operations.
General Info
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- CITY OF MORRO BAY: RECYCLED WATER FACILITIES – MONITORING WELLSOpen now, due in 28 days
- C26925020 - Hazardous Waste Disposal and RecyclingOpen now, due in 21 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Port of San Francisco (“Port”) is a highly visible and self-supporting enterprise agency within the City and County of San Francisco (“City”) that is responsible for seven and one-half miles of waterfront property. Its geographical area consists of property along the San Francisco waterfront extending from Fisherman’s Wharf and Aquatic Park to the Pier 98 shipping terminals and Heron’s Head Park. The Port has an ongoing need to properly manage hazardous materials and regulated wastes to mitigate risks these materials pose to people, the environment and property. These materials are encountered, managed and/or generated through Port work activities, public waste disposal facilities operated by the Port, illegal dumping, and accidental releases. Port work activities involving hazardous materials management include: regulated waste removal, maintenance; renovation; demolition; hazardous materials abatement; confined space entry and rescue; routine and emergency response to/cleanup of hazardous materials dumping; and spills and releases on land and in navigable waterways that are managed by the Port. The Port has additional needs for confined space support and recovery, building restoration, and salvage of abandoned or sinking marine vessels.
The Port is dividing the scope of work described above into three Service Areas. For each Service Area, the Port intends to award one or more master agreements for abatement work on an “if- and as-needed” basis. Respondents may propose for one or more service areas in their responses.
Service Area 1: Regulated Waste Removal, O... by Alexander Tut, Alysabeth (PRT) Alexander Tut, Alysabeth (PRT) 3:54 PM
Service Area 1: Regulated Waste Removal, On-land Spill Response and Cleanup, and Confined Space Safety Support and Recovery, and Traffic Control related to the performance of this Service Area
Service Area 2: On-Land Demolition, Hazardous Materials Abatement, Building Damage Restoration, and Excavation and Removal of Soils that Contain Hazardous Materials, and Associated Services
Service Area 3: Over-Water Demolition, Hazardous Materials Clean-Up, and Marine Vessel Salvage
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
