PSTE242001 Isolation Pad Design Build for Hush House

Active
PSTE242001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the design and construction of an isolation pad foundation at McEntire Joint National Guard Base in Eastover, South Carolina, supporting the 169th Fighter Wing’s new 50,000-pound thrust stand requirements for the Hush House. The scope includes interfacing a new T10 foundation with the existing legacy isolation pad, ensuring all work meets Unified Facility Criteria, Air National Guard and Air Force Engineering standards, along with all applicable codes and regulations. The contractor must coordinate work schedules with the government to accommodate mission needs and confirm mechanical, electrical, and fire suppression requirements as specified in the Statement of Work and associated drawings. This project is set aside exclusively for small businesses under NAICS code 237110, with a size standard of $45 million and an anticipated project value between $250,000 and $500,000. It will be carried out in two phases within a total period of 90 days—45 days for pre-construction submittals and approvals, followed by 45 days of actual construction. The contract includes specific limitations on subcontracting to ensure prime contractors retain a majority of the work. Key dates include the solicitation issuance around May 1, 2024, a pre-bid conference and site visit on May 10, and bid opening around June 3. Participation requires registration in SAM.gov, with official solicitations and amendments available electronically on the government’s Contract Opportunities website. The government emphasizes the importance of reviewing official documents online and assumes no responsibility for loss of connectivity or reliance on unofficial sources.

General Info

Design and construct isolation pad foundation at McEntire JNGB for 169th Fighter Wing, small business only.

Agency

Department Of Defense → W7NZ Uspfo Activity Scang 169View Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

Eastover, SC, 29044, USA

Set-Aside

SBA

Documents

(1)

SOW+PSTE+242001+Tie+in+New+Isolation+Pad+for+Hush+House.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NZ Uspfo Activity Scang 169
Contacts2 people available
OfficeEASTOVER, SC, 29044-5000, USA
Organization / Agency
Department Of Defense → W7NZ Uspfo Activity Scang 169
View Agency Profile
Office AddressEASTOVER, SC, 29044-5000, USA

Full Description

Show more
Synopsis: PSTE 242001 Isolation Pad design Build for Hush House Classification Code: Y1BZ - Construction of Other Airfield Structures Set Aside: Small Business NAICS Code: 237110 - Poured Concrete Foundation and Structure Contractors Size Standard: $45,000,000.00 Place of performance is McEntire JNGB Eastover, South Carolina. The 169th FW have established a project to design and build a T10 foundation that interfaces the existing legacy isolation pad foundation with the new 50k thrust stand requirements. All designs shall be in accordance with applicable Unified Facility Criteria, ANG and Air Force Engineering Technical Letters, and all other regulator and code requirements. The contractor will be responsible for confirming work schedule with government approval prior to work being started due to mission necessities. The contractor will be responsible for confirming mechanical, electrical, fire suppression needs as seen in the attached Statement of Work and Drawings. The work will be located at McEntire Joint National Guard Base near Eastover in Richland County, South Carolina. The base award CLINs are anticipated to be as follow: CLIN 0001: Base Bid The contract duration will be a total of 90 days after notice to proceed, which consists of an anticipated 45-day pre-construction phase for submittal approval, testing, mix designs, submit required permits, etc; and an anticipated 45-day construction phase. Contractor will have 90 days to complete both. This project is set aside 100% for Small Business. The North American Industry Classification (NAICS) Code is 237110, with a size standard of $45,000,000.00. The magnitude of the project is between $250,000.00 and $500,000.00. Your attention is directed to FAR Clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states - By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. The tentative date for issuing the solicitation is on-or-about 1 May 2024. The tentative date for the pre-bid conference is on-or-about 10 May 2024, 9:00AM local time, location will be in solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-bid conference. All questions for the pre-bid conference must be submitted by 15 May 2024 via email to devin.kimsey@us.af.mil and jonathan.bailey.28@army.mil. The bid opening date is scheduled for on-or about 3 June 2024. Actual dates and times will be identified in the solicitation. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.sam.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov In accordance with FAR 36.211(b), the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror's responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access web pages. The Government will not issue paper copies.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Biffy Facility ImprovementsThe contract involves the construction of a new non-combustible, explosion-proof structure equipped with interior and exterior lighting, ventilation, space heating for freeze protection, fire extinguishers, and surveillance cameras, all designed to provide safe access to critical equipment. The facility will be built to meet sanitisation standards per NFPA 820 and FDA guidelines, ensuring compliance with health and safety regulations. A redundant pump system with a duplicate backup pump and a biffy tank will be installed to guarantee continuous operation during pump failure, alongside backflow prevention measures. Emergency safety features including an eyewash station and emergency shower with tempered water will be included to protect personnel. The project also encompasses comprehensive upgrades to the facility’s electrical and mechanical infrastructure, including the installation of channel drains and enhanced wet well cleaning systems. All components will be integrated to ensure operational reliability and safety in a high-risk environment. The work is being managed by the Aviation Project Management Group under the Port of Seattle, with Jay Kim as the primary point of contact and Rishiraj Savita serving as the project manager for the contractor. The forecast notice was posted on July 26, 2026, indicating the intent to procure services classified under NAICS code 238110 for construction activities.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details

More opportunities from Department Of Defense → W7NZ Uspfo Activity Scang 169

Same awarding agency

NAICS: 237310
Federal
W50S9526BA001 - PSTE 162013 TAXIWAY PHASE 3The contract is a firm fixed-price agreement intended for a qualified small business to perform repair and expansion work on airfield pavements at McEntire Joint National Guard Base in South Carolina. The scope includes removing substandard concrete and asphalt pavement, installing new base course and concrete pavement, upgrading stormwater drainage, relocating taxiway edge lights, signage, and painting taxi lines to comply with Department of Defense, Air Force, and installation standards. The project is estimated to cost between $10 million and $25 million under NAICS code 237310 and is set aside exclusively for small businesses, with strict subcontracting limitations to ensure prime contractors perform a significant portion of the work. The project will be completed in two stages over a total of 360 days following the notice to proceed. The first stage addresses preparatory work, including approvals, testing, and permit submissions, lasting approximately 180 days. Only after government acceptance of this stage will the construction stage commence, also anticipated to last 180 days. A pre-bid conference and site visit are encouraged for interested contractors, with proposals submitted through the official government website. The solicitations and amendments will be available on SAM.gov, and the government will not provide printed copies or accept proposals outside this system. Contractual provisions emphasize compliance with limitations on subcontracting and adherence to established procedures for contract adjustments.
Highway, Street, and Bridge Construction

POSTED

6 months ago

DEADLINE

N/A
View Details
NAICS: 237310
Federal
PSTE 162013 Repair and Widen Taxiways, Phase IIIThe contract involves awarding a single firm fixed-price agreement to a small business for the repair and expansion of airfield pavements at McEntire Joint National Guard Base in South Carolina. The work includes removing substandard concrete and asphalt pavement, installing new base courses, Portland cement concrete pavements, improving stormwater drainage, relocating taxiway edge lights, installing signage, and repainting taxi lines to accommodate both base assigned and transient aircraft. All improvements must comply with Department of Defense, Air Force, and installation design standards, using local materials and construction techniques when cost-effective. The project is valued between $10 million and $25 million, with NAICS code 237310 and a size standard of $45 million. It is set aside 100% for small businesses and will be executed in two stages over a total 360-day period following the notice to proceed, with an initial 180-day pre-construction phase for approvals and permits before starting the 180-day construction phase. The contract imposes limitations on subcontracting under FAR Clause 52.219-14(e)(3), restricting prime contractors to paying no more than 85% of contract performance costs, excluding materials, to subcontractors that are not similarly situated entities. A pre-bid conference and site visit are highly encouraged, with details provided in the solicitation and access coordinated through the contracting office. Offerors must be registered in the System for Award Management (SAM) and submit proposals by the designated deadline. All official documents, modifications, and plans are accessible exclusively through SAM.gov, with no paper copies provided. The government disclaims liability for information from unofficial sources and any interruptions in internet access during the electronic solicitation process.
Highway, Street, and Bridge Construction

POSTED

6 months ago

DEADLINE

N/A
View Details