Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 9, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Public Address system update

Closed
080090002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811213
SLED
Piper Tech Video Management System
Solicitation # 231722
The City of Los Angeles Mayor's Office of Public Safety is soliciting proposals for the design, installation, and commissioning of an IP-based video surveillance system at the C. Erwin Piper Technical Center. Funded by the FY2024 UASI Grant with a fixed-price budget not to exceed 400,000 dollars, the project requires the installation of at least 26 high-resolution IP cameras, including P3738-PLE and Q6088-E PTZ models. The technical scope includes deploying a Genetec Security Center VMS platform, high-performance Dell recording servers, and workstations, supported by Category 6 plenum-rated cabling and a hybrid copper/fiber network backbone. Key performance requirements include AI-based perimeter detection and a minimum of one year of continuous 24/7 video retention at 30fps and full resolution. The performance period begins upon contract execution and ends on January 31, 2027. Award decisions will be based on the quality and value provided for the fixed price, with an evaluation process that may include virtual presentations for high-scoring semi-finalists. Contractors must adhere to strict standards, including FEMA Environmental and Historic Preservation guidelines, ANSI/TIA-606-D cabling standards, and LAPD/ITA cyber hardening protocols. Final acceptance is contingent upon successful System Acceptance Testing and User Acceptance Testing, including 100 percent cable certification reports. Proposals must be submitted in PDF format via email to the designated point of contact by October 30, 2026.
Mayor Office

POSTED

about 1 month ago

DEADLINE

in 10 days

General Info

NAICS

811213 - Communication Equipment Repair and Maintenance

Place of Performance

Shriever AFB, located 10 miles to the southeast from Colorado Springs, CO, CO, USA

Set-Aside

SBA

Documents

1

3+SES+PA+Diagram+080310+%284%29.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2550 50 Cons Pkp
Contacts1 person available
OfficeSCHRIEVER SFB, CO, 80912-2116, USA
Office AddressSCHRIEVER SFB, CO, 80912-2116, USA
Contacts

Full Description

Show more
The project objective is to modify/extend the current Public Address (PA) System to cover Mod 9 on Schriever AFB. 1. The current condition of the existing Mod 9 PA system: - The Mod already has a paging and background music system installed (TOA-BG-115, Located in the small room to the left of Zone 4 on the diagram). The contractor will install new modules into the amplifier to accomplish the desired capabilities, which are to be able to receive announcements from an external input and broadcast into all the zones as shown in the diagram. Ability to make announcements to internal system using the microphones that automatically interrupt the background music while the announcement is being made. - Contractor may use existing speakers if operational ( All speaker appear to be opeational) however, the wiring has to be removed and replaced with new wiring. - Speakers appearance must be similar in design to the existing speakers, which are standard plenum rated round speakers. White, Off-white or beige, or black are all acceptable color matches, but one color per room is desired. The existing colors of speakers are identified in diagram with a W for white or a B for black. - Four new speakers are required to be installed and the twenty-one existing speakers need to be wired into the PA system. Some of the existing speakers will require relocation, according to the attached diagram. 2. Contractor shall Demod /Remove all existing speaker wiring Re-arrange existing speakers in the ceiling grid and replace any speakers and ceiling tiles that are inoperable/unusable. Move speakers (identified as black circles in the diagram) to be moved to area identified by the triangles. Provide and install four (4) new ceiling speakers ( identified as triangles with circles around them, on the diagram) install new speakers if any or all of the existing 21 speakers are not re-usable, (25 Total Speakers) cut new tile opening for the new ceiling speakers, as necessary. Provide, Install and run microphone cable through the "under floor trays" in room 11 into the center of the room as shown in the diagram. Floor trays are vented and can be accesses via floor tiles for installation purposes. Connect all speakers and microphones and ensure operability Create and Wire all Seven (7) speaker zones (as identified in the diagram) Zones are identified as follows: *Zone 1 includes Rooms 11 ( Main Ops Floor) and adjacent office spaces ( There are no walls in between) *Zone 2 includes Rooms 20,23,24,25 ( Floor to ceiling walls in between) *Zone 3 includes Rooms 22 ( North Conference Room) *Zone 4 includes Rooms 5 (South Conference Room) *Zone 5 includes Rooms 15, 16, 17, 18, 19 ( All MA areas) *Zone 6 includes Rooms 2 (Breakroom), 6, 7 , and the Main Center Hallway *Zone 7 includes Room 21 (Ops Floor 2) Upgrade amplifier modules and re-wire zone attenuator panel Install interrupts for background music and microphones Connect/Test zone wire to amplifier mixer, adjust speaker volume Connect/Test microphones, CD music and Mute feature Note: Work will be performed in a restricted area and the end user will be performing escort duty for all work. Extra time will be required to enter/exit the restricted area.

More opportunities from Department Of Defense → FA2550 50 Cons Pkp

Same awarding agency

NAICS: 236220
Federal
USSF Construction CSO
Solicitation # USSF-CSO-FY26-2808A
The United States Space Force (USSF) Space Operational Contracting Headquarters has established a Master Commercial Solutions Opening (CSO) under solicitation number USSF-CSO-FY26-2808A to streamline the design, construction, repair, and alteration of base infrastructure. Authorized under 10 U.S.C. § 2808a, this framework utilizes Other Transaction (OT) authority, making all resulting agreements completely exempt from the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS). The Master CSO serves as an umbrella solicitation, with specific project requirements published separately as Areas of Interest (AOIs). All awards must be structured as fixed-price agreements, including firm-fixed-price, fixed-price incentive, or fixed-price award fee structures, while cost-reimbursable agreements are strictly prohibited. The solicitation process employs a phased down-select method to minimize industry costs, consisting of a Phase 1 White Paper, a Phase 2 Oral Pitch, and a Phase 3 Full Commercial Proposal. Evaluation focuses on technical merit, constructability, schedule viability, and fair and reasonable commercial pricing. Selected partners must adhere to commercial industry building codes such as IBC and NEC, and may be required to comply with Unified Facilities Criteria (UFC) and Anti-Terrorism/Force Protection (AT/FP) standards. Payment is managed through a milestone-based system, where fixed-price payments are triggered only upon the verifiable completion of work that has passed inspection. Additionally, contractors must comply with Davis-Bacon Act wage rates and maintain specific insurance coverages, including Professional Liability for design-build projects of at least $2M.
Commercial and Institutional Building Construction

POSTED

21 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS