This Award Notice opportunity from Downton Parish Council was posted on October 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Public Toilets Refurbishment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Downton Parish Council awarded a contract to Cubicle Systems Ltd for the comprehensive refurbishment of its public toilet facilities. The project, valued at 52,148 pounds excluding VAT, was scheduled for performance between April 27, 2026, and July 31, 2026. The scope of work involves a full strip-out of existing partitions, sanitary ware, and flooring, followed by the installation of hygienic wall cladding, non-slip vinyl safety flooring, and five laminate toilet cubicles divided between the men's and women's facilities. Significant emphasis is placed on accessibility, including the installation of a DDA-compliant toilet pack with grab rails and the leveling of the accessible toilet threshold to ensure wheelchair access. The technical requirements include the installation of new plumbing, electrical connections, baby-changing units, and vandal-resistant fixtures such as anti-vandal toilet roll holders and stainless-steel hand-drying facilities. The contractor serves as the Principal Contractor and is responsible for managing risks related to asbestos and Legionella, including protecting water systems during construction and facilitating a post-refurbishment risk assessment. Final delivery requires the site to be cleared, commissioned, and cleaned, with the provision of operation and maintenance manuals and a specified defects liability period.
General Info
Documents
2AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Solicitation requirements
8 mandatory10 requirements in 6 areas
- Technical3 · 3 must001
Demolition and Isolation Scope
- Quality Assurance2 · 2 must007
Fixture Durability Standards
Contract notice - Management2 · 1 must004
Principal Contractor Role
Contract notice - 7 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 10 requirementsAsk CLEATUS
I've read this contract. Ask me anything.
Timeline
Award Notice
Contract was awarded
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
