Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pueblo Area Rehabilitation Project – Phase 2

Active
20261027050State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pueblo Area Rehabilitation Project – Phase 2, solicitation CIP 26701, is a public works project issued by the Napa Sanitation District in Napa, California. The base bid focuses on the rehabilitation and replacement of 6 and 8 inch sewer mains, utilizing approximately 13,769 linear feet of pipe bursting and 207 linear feet of open-cut methods, along with the replacement of 318 lower laterals, 245 upper laterals, and 59 sewer structures. The project includes two bid alternates: Alternate A for resurfacing 2.2 miles of roadway and performing concrete repairs to curbs, gutters, and sidewalks, and Alternate B for the installation of two fire hydrants on Rancho Drive and Massa Drive for the City of Napa Utilities Department. The estimated construction costs are 7 million dollars for the base bid, 3 million dollars for Alternate A, and 30,000 dollars for Alternate B. To be considered responsive, bidders must attend a mandatory pre-bid conference on November 17, 2026, provide bid security of at least 10 percent of the bid, and be registered with the Department of Industrial Relations. Contractors must hold a valid Class A License and adhere to California prevailing wage laws, apprentice employment requirements, and safety standards for trenching and excavation. The successful bidder must complete the project within 275 calendar days from the Notice to Proceed and provide performance and payment bonds totaling 100 percent of the contract amount within ten days of the award. All inquiries and administration are managed by Amber Elias.

General Info

Napa Sanitation District project for sewer rehabilitation, roadway resurfacing, and hydrant installation.

Documents

1

Pueblo Area Rehabilitation Project - Phase 2 (CIP 26701)

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa Sanitation District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #CIP 26701: The Pueblo Area Rehabilitation Project – Phase 2 involves the rehabilitation and/or replacement of 6” and 8” sewer mains using approximately 13,769 LF of pipe bursting and 207 LF of open-cut methods. The scope also includes the rehabilitation or replacement of approximately 318 lower laterals, 245 upper laterals, and 59 sewer structures. Bid Alternate A encompasses resurfacing approximately 2.2 miles of roadway and performing minor concrete work to repair curb and gutters, sidewalks, and concrete valley gutters. Bid Alternate B, for the City of Napa Utilities Department, includes the installation of two fire hydrants on Rancho Drive and Massa Drive.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → Napa Sanitation District

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS