Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pump Alignment and Commissioning

Open
International
Response DeadlineDue in 6 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Pump Alignment and Commissioning involves performing precision alignment of the pump shaft and motor, followed by final commissioning for prime contractors on projects for the Pakistan State Oil Company Ltd. The scope of work requires the use of laser alignment tools or dial indicators to align 7.5 HP pumps and the verification of critical flow and pressure parameters. The successful contractor must provide a comprehensive commissioning report and certified alignment documentation upon completion. The project will be performed in Multan, Pakistan. Eligible contractors must maintain active taxpayer status, including NTN and GST/PST, and demonstrate a strong safety record with no fatal accidents occurring within the last two years. The solicitation is categorized under NAICS code 541330, with a response deadline of December 2, 2026.

General Info

Pump alignment and commissioning for Pakistan State Oil Company in Multan, Pakistan.

Place of Performance

Multan, PAK

Set-Aside

NONE

Documents

This scope was carved out of Doc345659278.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP OP-32048-ASR (Installation, Piping Fabrication, Alignment and Commissioning of 7.5 HP HSD Standby Pump at PR Multan)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 6 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom RFP OP-32048-ASR (Installation, Piping Fabrication, Alignment and Commissioning of 7.5 HP HSD Standby Pump at PR Multan)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPakistan State Oil Company Ltd
ContactsNo contacts available
OfficeN/A
Organization / AgencyPakistan State Oil Company Ltd
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs precision alignment of the pump shaft/motor and final commissioning for prime contractors on Pakistan State Oil Company Ltd (PSO) projects. Utilizes laser alignment tools or dial indicators to align the 7.5 HP pump and verifies flow and pressure parameters. Requires active tax payer status (NTN, GST/PST) and a safety record with no fatal accidents in the last 2 years. Delivers a commissioning report and certified alignment documentation.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project (RFP-JV-26-013). The scope of work focuses on groundwater recharge via aquifer replenishing injection wells and associated monitoring wells, organized into four primary tasks: project initiation and management, data gathering and site investigations, a 30 percent design level basis of design report, and detailed design. Key deliverables include the basis of design report, detailed design documents, and procurement packages for well drilling and construction. All work must adhere to Engineering Design Guidelines and Title 22 regulations for treated wastewater. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. Proposals are due by January 26, 2027, via PlanetBids. The selection process involves ranking proposals based on a 100-point scale, with interviews accounting for 20 points. The top-ranked consultant will negotiate a not-to-exceed contract subject to approval by the IEUA Board of Directors. Consultants must provide a separate itemized fee schedule and comply with various federal and state requirements, including the Buy America Preference for Infrastructure Projects and California Labor Code insurance mandates.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
View Details
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work involves developing a purified water conveyance system to transport water from the Advanced Water Purification Facility to injection wells. Key responsibilities include conducting utility research and field investigations, establishing a basis of design across multiple disciplines, and developing detailed design drawings at 30, 60, 90, and final design levels. The consultant will also provide engineering services during the bid award process and deliver final design reports, specifications, and AutoCAD files. This solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, via PlanetBids. The selection process is based on a ranking of proposals evaluated on factors such as project implementation plans, technical challenges, and cost control, with the top three ranked consultants proceeding to fee envelope review and potential interviews. The contract is a not-to-exceed agreement paid on a time and material basis. Consultants must maintain comprehensive insurance, including Commercial General Liability, Professional Liability, and Workers' Compensation. Because the project is supported by federal and state grants, the consultant must comply with 2 CFR Part 200, the Davis-Bacon Act, and Buy America preferences. Additionally, the consultant must meet Disadvantaged Business Enterprise (DBE) requirements, including the Six Good Faith Efforts for sub-consulting services.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
View Details
NAICS: 541330
New
SLED
Wastewater Treatment Plant Zinc Mitigation Evaluation And Design Services
Solicitation # 20261124055
The City of Shasta Lake is soliciting a Professional Services Agreement for the evaluation and design of a metals (zinc) mitigation facility at its existing Wastewater Treatment Plant. The primary objective is to achieve permanent permit compliance by mitigating zinc in effluent flow, adhering to NPDES and WDR regulatory requirements. The scope of work includes project management, environmental compliance, assistance with the Division of Financial Assistance (DFA) construction application, and engineering design, including bench-scale testing and a 20% conceptual design. Key deliverables include monthly progress reports, a final geotechnical report, a project report meeting CWSRF policies, and conceptual plans and estimates. The contract is expected to be awarded in March 2027, with all work completed by June 2031. The selection process is based on obtaining the most qualified Consultant Team, with evaluation factors focusing on the team's understanding of the work, technical ability with similar projects, experience with DFA funding and NPDES permits, and expertise in CEQA and NEPA-like clearances. The total estimated cost for the project is divided among project management ($150,000), the project report ($401,200), environmental documentation ($96,000), the CWSRF construction application ($40,000), and engineering design ($120,000). Consultants must maintain GAAP-compliant project accounts and submit reimbursement requests with supporting documentation. This solicitation is not set aside for any specific socioeconomic category.
City of Shasta Lake

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
Fairview Gap Closure Project
Solicitation # 20261124049
The Fairview Gap Closure Project is a professional design services solicitation issued by the City of Gridley, California, to develop pedestrian infrastructure improvements along Fairview Drive and East Gridley Road. The primary objective is to advance the project to at least a 90% design level, including environmental clearance and construction documents, to support an Active Transportation Program funding application. Key deliverables include approximately 6,600 square feet of new 5-foot sidewalk, 12 ADA-compliant curb ramps, and 1,415 linear feet of new curb and gutter, alongside an evaluation of intersection control improvements such as traffic signal warrants and pedestrian bulb-outs. The project must adhere to Caltrans Local Assistance Procedures Manual (LAPM) and Highway Design Manual standards, the California Building Standards Code, and ADA Accessibility Guidelines. The solicitation is open for responses until January 15, 2027, with an anticipated contract award and notice to proceed on February 15, 2027, and a target completion date for the 90% PS&E by August 31, 2027. Proposals are evaluated on a weighted 500-point scale focusing on understanding of the work, experience with similar federally funded projects, quality of staff, innovative techniques, and procedural familiarity. The contract requires strict compliance with the Davis-Bacon Act for prevailing wages, Buy America provisions for manufactured products, and various federal non-discrimination statutes including Title VI of the Civil Rights Act. Invoices must be submitted in duplicate within 30 days of work performance and are subject to approval by the Local Agency Contract Administrator.
City of Gridley

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Pakistan State Oil Company Ltd

Same awarding agency

NAICS: 424720
New
International
PSO RFI Pre-qualification of reputed international suppliers of base oil for framework agreement
Solicitation # Doc345608722
Pakistan State Oil Company Ltd is seeking the pre-qualification of reputed and renowned international suppliers to establish a framework agreement for the supply of base oil. This process aims to identify suppliers with the necessary experience and expertise to support PSO's operations, with performance taking place in Karachi, Pakistan. Interested vendors must register and submit their applications through the SAP Ariba Portal. The submission process requires a filled Vendor Assessment Performance/Criteria form and a scanned copy of a signed and stamped request on the applicant's official letterhead, specifically titled as a Pre-qualification Documents Collection Request. International suppliers may apply through a local authorized agent or partner. In such cases, the application must include a valid NTN, GST/PST certificates, and the CNIC of the owner or authorized representative, and the vendor must be an active taxpayer. The document collection period runs from November 29, 2026, to December 16, 2026, with a final submission deadline of December 17, 2026, at 02:15 PM PST. Documents will be opened on December 17, 2026, starting at 04:30 PM PST. There is no specified set-aside status for this solicitation.
Petroleum and Petroleum Products Merchant Wholesalers (except Bulk Stations and Terminals)

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS