Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on February 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pump Station 16 Improvements - Professional Design-Build Services

Closed
25-0209-RFP-DBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Pinellas County Utilities is seeking qualified Design/Build firms to undertake the comprehensive refurbishment and enhancement of Pump Station No. 16 located at 10548 Park Boulevard in Seminole, Florida. The selected firm will be responsible for all phases of the project, including design, permitting, and construction, with the primary goal of improving the facility's reliability and odor control systems. Key project components involve replacing mechanical piping, pumps, electrical gear, and installing new infrastructure such as a standby generator, diesel bypass pump system, and bridge cranes to facilitate maintenance. Architectural modifications will also be made to enhance site aesthetics and community acceptance, including the addition of perimeter walls, with the design team expected to produce renderings for public outreach and participate in up to two community meetings. The project emphasizes maintaining access for ongoing maintenance and considers property agreements or access rights necessary for staging equipment. The project is situated within an active commercial area, requiring careful planning to minimize disruption and ensure community support. The contract, with an estimated value between five and fifteen million dollars, is governed by Pinellas County’s procurement policies and Florida’s CCNA selection procedures, with the deadline for proposals set for March 27, 2025. Notably, CDM Smith, which prepared the technical criteria package, is precluded from participating as a proposer or sub-consultant. The primary contact for this solicitation is Pamela Ulrich, reachable via email or phone for further information.

Documents

3
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Pinellas Utilities
Contacts1 person available
OfficeN/A

Full Description

Show more
On behalf of Pinellas County Utilities, the Pinellas County Board of County Commissioners (Board) is seeking proposals from professional Design/Build (D/B) firms interested in qualifying to provide professional services for the design/build of the Pump Station No. 16 Improvements Design/Build Project located at 10548 Park Boulevard, Seminole FL 33772. The D/B firm will be selected in accordance with the guidelines established within Pinellas County’s Procurement Policy and Procedures Manual and the State of Florida’s CCNA selection procedure outlined in FS 287.055.The attached Design Criteria Package (Technical Memorandum No. 2, February 2024) prepared by CDM Smith provides the basis for project development. The D/B firm selected will be responsible for completion of design, permitting, and construction at Pump Station No. 16 (PS16). The objective of the project is to refurbish the facility as well as improve reliability with specific goals of enhancing the vapor phase odor control treatment system. The project includes replacement of mechanical piping including relocation of process piping and valves to improve maintenance access, replacement of pumps, addition of bridge cranes above wet access points, replacement of electrical gear, installation of a new standby generator, installation of new diesel by-pass pump system, modifications to vapor phase odor control equipment, and modification of architectural features including the addition of new perimeter walls. The D/B firm shall consider maintenance access needs for the completed project including property agreements or access rights needed for the staging equipment needed to maintain the improved facility.Architectural modifications to the facility shall consider the site location as well as community acceptance. PS016 is a critical infrastructure located within an active commercial development. The D/B team shall prepare architectural renderings for use in public outreach meetings and plan to participate in up to two (2) project outreach meetings.CDM Smith is precluded from proposing on this project as the D/B firm, or as a member of the D/B firm’s team (Sub-consultant).          

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS