Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from South Carolina was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pump Station 87 Rehabilitation

Closed
2027-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Dorchester County, South Carolina, is soliciting bids for the rehabilitation of Pump Station 87, located at the intersection of International Circle and W. 5th North Street in Summerville. The project requires a qualified contractor to provide all labor, equipment, and materials to perform a comprehensive overhaul, including the installation of County-furnished pumps and controls, replacement of wet well piping, and the construction of a new electrical equipment rack. The scope of work also encompasses SCADA coordination, electrical service and grounding improvements, and the implementation of a temporary 6-inch bypass pumping system to maintain operations during construction. The contractor is responsible for inspecting and repairing the wet well lining and performing all necessary testing and startup activities to ensure the station is fully operational before site restoration and final acceptance. Bids are due by September 16, 2026, and the contract will be awarded to the lowest responsive and responsible bidder. The successful contractor must complete the project within 30 calendar days from the issuance of the Notice to Proceed. Key requirements include the provision of performance and payment bonds at 100% of the contract amount and compliance with OSHA safety standards, specifically regarding confined space entry. Payment is scheduled within 30 days of approved invoices. Bidders must submit a Statement of Qualifications and certify compliance with the South Carolina Illegal Immigration Act, non-collusion agreements, and federal non-discrimination authorities.

General Info

Dorchester County seeks bids for Pump Station 87 rehabilitation by September 16, 2026.

Documents

4

IFB 2027-06 Supplemental – Pump Station 87 Rehab Scope

PDF, High priority: read this firstifb
High

IFB No. 2027-06 Pump Station 87 Rehabilitation

PDF, High priority: read this firstifb
High

IFB No. 2027-06 - Pump Station 87 Rehabilitation

PDF, High priority: read this firstifb
High

No. 2027-06 Pump Station 87 Rehabilitation

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Water & Sewer
Contacts2 people available
OfficeSaint George, SC, 29477, USA
Office AddressSaint George, SC, 29477, USA
Contacts
Steven RickerProject Manager
Rebecca DantzlerPurchasing Services Manager

Interested Companies (33)

Murray SandSummerville, SC
Triad Engineering and ContractingBrooklyn, OH
Complete UtilitiesScranton, SC

See All 33 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Dorchester County (the County) invites qualified firms to submit bids to complete the Pump Station 87 Rehabilitation project. This Invitation for Bids (IFB) document provides background and general information for Respondents and should be used in the development of bids.

More opportunities from South Carolina → Water & Sewer

Same awarding agency

NAICS: 562991
New
SLED
Professional Maintenance and Asset Management of Water Storage Tanks
Solicitation # 2027-11
Dorchester County, South Carolina, is soliciting proposals for professional maintenance and asset management services for ten potable water storage tanks, including the Ridgeville, Academy, and Winding Woods towers. The scope of work encompasses engineering inspections, cleaning, disinfection, rehabilitation, interior and exterior coating, and general preventative maintenance to ensure structural integrity and operational reliability. Services related to generators and SCADA/telemetry systems are specifically excluded. The contract is designed for an initial one-year term with the option to renew for up to four additional one-year terms, with performance beginning upon the issuance of a Notice to Proceed. Proposals must be submitted electronically via the OpenGov Procurement Portal by November 30, 2026, at 2:00 PM. The evaluation process is based on a comparative analysis where firm qualifications and relevant experience, project understanding and technical approach, and the cost proposal are weighted factors. The County is not obligated to accept the lowest cost proposal and will award the contract to the respondent providing the best overall value. Required submissions include a technical proposal, a separate cost proposal with firm annual fees for years one through five, a cost narrative, and certifications regarding non-collusion, non-discrimination, and compliance with South Carolina state laws.
Septic Tank and Related Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS