Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pump Station Improvements

Closed
PE-66123-NONST-2026-000000003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The project involves constructing improvements to the Chickamauga Trail Pump Station in Lookout Mountain, Georgia, with bids due by September 4, 2025. The work is divided into two phases: the first phase includes installing a new 8-inch force main bypass connection near the existing force main, adding four in-line cleanout assemblies as an optional bid item, and subcontracting ice-pigging of the force main. The second phase entails removing existing submersible sewage pumps, ductile iron piping, and related components from the current wetwell, followed by rehabilitating the wetwell and installing a new duplex sewage pump station with a cast-in-place concrete wetwell and top slab. This phase also involves installing new submersible pumps, piping, valves, and appurtenances both within the wetwell and above ground, along with constructing a masonry block structure adjacent to the station. The project is valued between $500,000 and $1,500,000 and is managed by the City of Lookout Mountain, Georgia. Bidders are invited to submit sealed bids at the City Hall located at 1214 Lula Lake Road, Lookout Mountain, GA, with the opening scheduled for 2:00 p.m. Eastern Daylight Time. The contract documents specify adherence to detailed plans, drawings, and specifications, and the project aims to upgrade the existing pump station infrastructure to improve operational capacity and reliability. The primary contact for inquiries is Cindy Roberts, reachable via email at [email hidden] or by phone at [phone hidden].

Documents

1
DOCX, High priority: read this firstsow
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66123 LOOKOUT PE-66123-NONST-2026-000000003 to PE-66123-NONST-2026-000000003.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCity of Lookout Mountain Georgia
Contacts1 person available
OfficeN/A

Full Description

Show more
Separate sealed Bids for furnishing of all materials, labor, tools, equipment, and appurtenances necessary for the construction of the Chickamauga Trail Pump Station Improvements will be received by the Owner at the City of Lookout Mountain, Georgia City Hall, 1214 Lula Lake Road, Lookout Mountain, GA 30750, until 2:00 p.m., Eastern Daylight time, on September 4, 2025, and will then at said office be publicly opened and read aloud. Capitalized terms in this Advertisement and Invitation for Bids shall have the meanings specified in the Project's Contract Documents.
The Project will be conducted in two phases and will consist of the following major work elements, to be performed in accordance with the Plans/Drawings and Specifications for the Project and other Contract Documents:
Phase 1: Furnishing and Installing a new 8-inch-diameter force main bypass connection assembly in the existing 8-inch-diameter force main near the pump station site; furnishing and installing four new in-line cleanout assemblies along the existing force main route (as an additive alternate); subcontracting Ice-Pigging of the existing force main. Phase 2: Removing the two existing submersible sewage pumps, ductile iron pipes and fittings, and associated appurtenances from the existing 6-foot-diameter wetwell and rehabilitating the wetwell; installing a new duplex sewage pump station with an 18-foot (wide) x 20-foot (long) x 15-foot (deep) cast-in-place concrete wetwell and a 19-foot (wide) by 20.5-foot (long) cast-in-place concrete top slab (including access hatches and fall protection safety grating) adjacent to the existing pump station; furnishing and installing two (2) new submersible sewage pumps, ductile iron piping and fittings, and appurtenances in the new wetwell; furnishing and installing new ductile iron piping and fittings, valves, and appurtenances above ground on the new cast-in-place concrete slab; furnishing and installing a new 8-foot (wide) by 16-foot (wide) masonry block

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS