PUMP UNIT,CENTRIFUG — 4320016665292 — SPRPA126QYD76
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Solicitation SPRPA1-26-Q-YD76, issued by DLA Aviation at Philadelphia for the Department of the Navy, seeks a contractor to provide repair, testing, and inspection services for Centrifugal Pump Units (NIIN 016685292). The contractor is solely responsible for providing all necessary manufacturing aids, including fixtures, jigs, and test equipment. Technical requirements mandate that markings comply with MIL-STD-130 and that SAE-AS22759 series wire be used, as MIL-W-81381 wire is strictly prohibited. The contractor must maintain a quality control system meeting ISO-9000/9001/9002, Mil-I-45208A, or Mil-Q 9858 standards and provide detailed quality control documentation and repair procedures for government approval. The government intends to make a single award based on the most advantageous offer, with past performance weighted more heavily than price. Evaluation may include the DoD Supplier Performance Risk System (SPRS) to assess quality and delivery risks. Deliverables must be provided within 90 days, shipped FOB Destination to designated facilities in Pennsylvania or California, and packaged according to MIL-STD-2073-1 and ASTM D3951-18. Invoicing must be processed electronically through the Wide Area Workflow (WAWF) system. The contract incorporates various FAR and DFARS clauses regarding cybersecurity, Buy American preferences, and the prohibition of providing funds to the enemy.
General Info
Place of Performance
PHILADELPHIA, PA, 19111-5098, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Description
TDP VERSION NUMBER 003 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer. RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items. REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing. RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records: Receipt inspection documentation. Repair shop travelers or repair cards. Parts replacement records. Parts inspection data before and after repair as applicable. Acceptance test data. QA personnel shall maintain a complete receipt inspection,test, repair re-test, history card for each item processed. This information shall be made available to the Government upon request. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Navy → Pa DLA Aviation At Philadelphia
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
