Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Pumps and Valves Supply and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the supply, removal, and installation of various pumps, including submersible and centrifugal types, as well as industrial valves such as butterfly, gate, and check valves, all connected to clarifier and process systems. The scope also covers important technical tasks like alignment, coupling, and ensuring proper integration with control systems to maintain operational efficiency within the wastewater treatment framework. Issued by the Waste Water Treatment Facility in Massachusetts, specifically for work to be performed in Nantasket Avenue, Hull (zip code 02045), the contract is categorized under the NAICS code 238220, which pertains to plumbing, heating, and air-conditioning contractors. It is a subcontract opportunity posted on April 8, 2026, with a response deadline of May 6, 2027. The contract does not specify any set-aside status or particular target groups, allowing a wide range of eligible contractors to participate.

General Info

Supply, removal, installation of pumps and valves for wastewater treatment at Hull, MA, subcontract opportunity.

Agency

Massachusetts → WWTF - Waste Water Treatment FacilityView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Nantasket Avenue Hull, MA, 02045, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → WWTF - Waste Water Treatment Facility
ContactsNo contacts available
OfficeN/A
Organization / Agency
Massachusetts → WWTF - Waste Water Treatment Facility
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, removal, and installation of pumps (e.g., submersible, centrifugal) and industrial valves (butterfly, gate, check) associated with clarifier and process systems. Includes alignment, coupling, and integration with control systems.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
SLED
Fuel System Design and Installation (FMVSS 301 Compliance)The contract entails the design and installation of a complete fuel system including fuel tanks, transfer lines, and fillers, all engineered to meet the Federal Motor Vehicle Safety Standard 301 requirements for crashworthiness and fuel spillage prevention. All components must be constructed and assembled with fireproof sleeves installed to enhance thermal protection and minimize fire risk during or after impacts. The work must be executed to ensure full compliance with federal safety regulations for vehicle fuel systems under crash conditions, with no tolerance for deviations that could compromise occupant safety or environmental integrity. This is a subcontract opportunity issued by the Department of Transportation through its Hawaii office, with a solicitation posted on July 24, 2026, and a response deadline set for August 15, 2026. The North American Industry Classification System code 238220 indicates the work falls under specialty trade contracting for plumbing, heating, and air-conditioning-related services, aligning with specialized vehicle fuel system installations. The place of performance and specific contact details are not provided, but the project is likely tied to state or federally funded transportation assets requiring stringent safety certification. Bidders must demonstrate technical capability, compliance history, and experience with FMVSS 301 standards to be considered eligible.
Department of Transportation

POSTED

2 days ago

DEADLINE

in 19 days
View Details

More opportunities from Massachusetts → WWTF - Waste Water Treatment Facility

Same awarding agency

NAICS: 237990
SLED
Secondary Clarifiers, Grit & Building UpgradesThe solicitation BD-26-1284-WWTF-WWTF-127654 issued by the Town of Hull Sewer Department pertains to upgrades at the Hull Wastewater Treatment Facility in Massachusetts, specifically targeting replacement of secondary clarifier mechanisms, associated pumps, piping, and valves, along with structural and architectural building repairs. Funded in part through the Clean Water State Revolving Fund (CWSRF #19112), the project scope includes several optional bid alternates at the owner's discretion: Scum Pump Replacement, Influent Wet Well H2S Coating, Exterior Building Repairs, and Grit System Replacement. The work must comply with relevant EPA and Massachusetts DEP regulations, prevailing wage requirements under the Davis-Bacon Act and MGL c.149, as well as certification mandates by DCAMM for the general contractor and subcontractors engaged in trades such as masonry, electrical, and HVAC. Bidders must submit their proposals electronically via BidNet by May 27, 2026, with sub-bids due earlier by May 6, 2026. A mandatory bid security of 5% of the bid value is required for both general and sub-bidders. The project completion timeline allows for substantial completion within 540 days after award and final completion within 570 days. Inspections and acceptance will be performed at the facility location, confirming adherence to environmental standards, labor regulations, and quality controls. Although the solicitation does not explicitly state the contract type or evaluation criteria, the procurement follows Massachusetts public bidding laws (MGL Chapter 149 §§44A-J), suggesting an emphasis on lowest price technically acceptable bids. The solicitation encourages attendance at a pre-bid conference and site visit scheduled for April 15, 2026, and designates the Assistant Director of Wastewater Operations, Tom Molinari, as the primary contact for inquiries and bid submissions. No specific packaging, marking, organizational conflicts of interest clauses, or government payment instructions are detailed in the available documentation.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

in 9 months
View Details