Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Pure Water Antelope Valley

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pure Water Antelope Valley project is a regional water augmentation program managed by the Palmdale Water District in California. The initiative focuses on indirect potable reuse through the construction of an Advanced Water Purification Facility (AWPF) that utilizes microfiltration, reverse osmosis, and ultraviolet/advanced oxidation processes to purify tertiary treated wastewater. This purified water will be injected into the Antelope Valley groundwater basin to supplement existing supplies, ensuring all product water meets state and federal drinking water standards. The project is designed in two stages, with Phase 1 treating 4.75 million gallons per day and Phase 2 expanding capacity to 10 million gallons per day. The project scope includes the construction of a production well, tertiary water pump station, pipeline, brine conveyance, and brine ponds. Construction is estimated to take approximately 839 days, with specific activities such as land clearing and grading scheduled between November 2027 and March 2030. Environmental compliance is a primary focus, with the project undergoing a California Environmental Quality Act review and the adoption of a Mitigated Negative Declaration. Key requirements include ADA compliance for parking, adherence to local lighting ordinances, and strict protocols for the protection of biological resources and archaeological sites. Coordination involves multiple agencies, including Caltrans for oversized equipment transport and the California Department of Fish and Wildlife for biological monitoring and mitigation.

General Info

Palmdale Water District project building water purification facilities for groundwater augmentation in California.

Agency

California → Palmdale Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Avenue P8 and 25th Street, CA, 93550

Set-Aside

NONE

Documents

(10)

CDFW Comment on Pure Water Antelope Valley Project MND SCH No. 2025100946

PDFcomment

Notice of Completion Environmental Document Transmittal - Pure Water Antelope Valley

PDFnotice-of-completion

Pure Water Antelope Valley Project NOI and NOA

PDFnotice-of-intent

Pure Water Antelope Valley CEQA Initial Study October 2025

PDFinitial-study

Caltrans Comment Letter on Pure Water Antelope Valley MND

PDFcomment-letter

Pure Water Antelope Valley CEQA Appendix A Air Quality Modeling Output

PDFceqa-appendix-air-quality

Notice of Determination for Pure Water Antelope Valley Project

PDFnotice-of-determination

Pure Water Antelope Valley CEQA Summary Form

PDFceqa-summary

Pure Water Antelope Valley Biological Resources Technical Report Appendix B1

PDFbiological-resources-technical-report

Pure Water Antelope Valley Aquatic Resources Delineation Report June 2024

PDFaquatic-resources-delineation-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Palmdale Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Palmdale Water District
Office AddressN/A
Contacts
Shadi BaderEngineering Manager

Interested Companies (1)

Show more
Stantec Consulting Services
Irvine, CA

Full Description

Show more
Regional water augmentation program using indirect potable reuse (IPR) by groundwater augmentation via direct injection. Using advanced treatment processes including MF, (RO), UV/AOP, Pure Water AV would further purify tertiary treated wastewater to produce water that would meet all applicable state and federal drinking water standards and regulations for IPR. Product water from the proposed Advanced Water Purification Facility (AWPF) would be injected into the Antelope Valley groundwater basin, thereby supplementing PWD’s existing water supplies. Phase 1 of the AWPF would treat 4.75 million gallons per day (mgd), Phase 2 (Ultimate) would treat 10 mgd.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS