PVC Piping Material Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement concerns the supply of industrial-grade PVC piping, valves, and fittings for wastewater treatment plant projects managed by the Town of Holliston in Massachusetts. The selected provider is responsible for delivering all materials directly to the project site on Washington Street, ensuring that all supplies strictly adhere to Section 40 23 00 specifications and the detailed project plans provided. The solicitation was posted on October 21, 2026, with a response deadline of November 12, 2026. Falling under NAICS code 326122, this contract focuses on the procurement of essential piping materials to support prime contractors in the successful completion of the municipal wastewater infrastructure improvements.

General Info

Subcontract for supplying PVC piping and fittings for Holliston wastewater treatment plant projects.

Place of Performance

Washington Street Holliston, MA, 01746, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1627-BOS17-BOS17-134664.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WWTP Yard Piping Phase 1D

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → Town of Holliston
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies industrial-grade PVC piping and associated valves and fittings for prime contractors on Town of Holliston wastewater treatment plant projects. Delivers materials to the WWTP site according to Section 40 23 00 specifications and detailed project plans. Delivers specified PVC piping and fittings.

Similar Contracts

Same NAICS industry code

More opportunities from Massachusetts → Town of Holliston

Same awarding agency

New
SLED
WWTP Yard Piping Phase 1D
Solicitation # BD-27-1627-BOS17-BOS17-134664
The Town of Holliston is soliciting sealed bids for the WWTP Yard Piping Phase 1D project, which involves the installation of approximately 1,200 linear feet of PVC piping to three wastewater effluent tanks and treatment units at the Holliston Wastewater Treatment Plant located at 100 Linden Street. The scope of work includes digging, installation, and limited site restoration consisting of loam and seed. Technical requirements specify that gravity piping must undergo low air pressure testing per Section 40 23 00, while pressure dosed force mains using Schedule 40 pipe do not require hydrostatic testing. Additionally, the project includes the installation of six concrete ADA ramps with detectable warning panels at three crosswalks on Washington Street. The contract will be awarded to the lowest responsive and responsible bidder. To be considered, bidders must provide at least three references for similar projects completed within the last five years and certify that all onsite employees have completed a 10-hour OSHA construction safety course. Compliance with Massachusetts prevailing wage laws is mandatory, requiring the submission of weekly certified payroll records to the Town Administrator. Insurance requirements include comprehensive general liability with a 3 million dollar annual aggregate and 1 million dollar per occurrence limit, with the Town of Holliston named as an additional insured. Bids are due by 10:00 AM on November 12, 2026, and must be submitted to the Town Manager's Office at 703 Washington Street, Holliston, MA. Required submission documents include a Certificate of Non-Collusion, a Certificate of State Tax Compliance, and a Certification Regarding Labor Harmony and OSHA Training. The Town agrees to make reasonable efforts to pay invoices within 30 days of receipt and acceptance of work. The contractor is responsible for correcting any defects in materials or workmanship that appear within one year after final payment.

POSTED

6 days ago

DEADLINE

in 15 days
View Details
SLED
Holliston WWTP Phase 1D - Yard Piping
Solicitation # BD-27-1627-BOS17-BOS17-134222
The Town of Holliston is soliciting bids for the installation of yard piping as part of the Wastewater Treatment Plant (WWTP) Phase 1D Upgrades. The scope of work includes furnishing and installing the piping network, bedding soil excavation, backfill, and the creation of wall penetrations and pipe sleeves, with work extending from the WWTP foundation wall to two feet into the interior of various tank pipe sleeve connections. All work must be completed within six weeks of contract authorization and adhere to specific quality standards, including ASTM D3034 for SDR 35 gravity pipe and ASTM D2241 for PVC pressure rated sewer pipe. The contract will be awarded to the lowest responsive and responsible bidder based on the total quote amount. To be considered responsive, bidders must provide at least three references for similar projects completed within the last five years and certify that all employees have completed a 10-hour OSHA-approved construction safety course. The agreement is governed by the laws of the Commonwealth of Massachusetts and requires compliance with state prevailing wage laws and tax certifications. Key insurance requirements include commercial general liability coverage of 1 million dollars per occurrence and 3 million dollars annual aggregate, as well as motor vehicle insurance of 500,000 dollars per person. Payments are subject to the availability of funds as certified by the Town Accountant and are generally processed within 30 days of invoice acceptance.

POSTED

21 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS