Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on January 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW - 105068 - 1 - Holly-Northside Cast Iron Water Main Replacement - Part 1

Awarded
26-0107State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Fort Worth is soliciting bids for the Holly-Northside Cast Iron Water Main Replacement - Part 1 project, identified as solicitation number 26-0107 and City Project No. 105068-1. The scope of work involves extensive water and sewer infrastructure improvements in Fort Worth, Texas, with a total performance period of 730 days for final acceptance. Water line work includes approximately 20,000 linear feet of open cut installation across various diameters ranging from 8 to 36 inches, as well as several hundred linear feet of water line installation using other than open cut methods with steel casings. Sewer work consists of 190 linear feet of 8-inch sewer line via open cut and 20 linear feet of 16-inch steel casing. Eligible bidders must be prequalified according to Section 00 45 12 and submit a comprehensive bid package including a bid bond, proposal form, small business forms, and a conflict of interest affidavit. The procurement process has been refined through six addenda, which clarified technical specifications regarding pipe materials, backfill requirements, and contract completion terms. Evaluation and award will be based on the lowest price and bidder qualifications. Contractors are responsible for site-specific protections, including the preservation of existing trees and utilities, and must adhere to municipal inspection standards, including pre- and post-CCTV inspections for sewer work.

General Info

Fort Worth seeks bids for water and sewer infrastructure replacement over 730 days.

Contract Value

$0

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

13
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
XLSX, High priority: read this firstbid-form
High
XLSX, High priority: read this firstbid-form
High
XLSX, High priority: read this firstbid-form
High
XLSX, High priority: read this firstbid-form
High
XLSX, High priority: read this firstbid-form
High
XLSX, High priority: read this firstbid-form
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstitb
High

Read all 13 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
The major work will consist of the (approximately) following: Water: Open Cut Work: 5,720 LF of 36” water line, 110 LF of 36” water line and 42” steel casing, 4,980 LF of 30” water line, 4,070 LF of 24” water line, 1,310 LF of 16” water line, 3,020 LF of 12” water line, 4,560 LF of 8” water line.
By Other Than Open Cut Work: 200 LF of 36” water line and 42” steel casing, 80 LF of 30” water line and 42” steel casing, 86 LF of 24” water line and 42” steel casing, 30 LF of 24” water line and 36” steel casing, 20 LF 16” water line and 24” steel casing, 110 LF of 12” water line and 24” steel casing, 90 LF 8” water line and 16” steel casing.
Sewer: 190 LF of 8” sewer line by open cut and 20 LF 16” steel casing by other than open cut.

More opportunities from Texas → City Of Fort Worth

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS