The City of Fort Worth is soliciting bids for Project No. 105114, the Northside IV 24-inch Water Transmission Main Phase 1C - Segment 3. The scope of work involves the installation of 6,112 linear feet of 24-inch water pipe via open cut and 6,96 linear feet using other than open cut methods. The project includes comprehensive permanent and temporary asphalt paving repairs, utility cuts, and subgrade preparation to restore city streets. The Engineer's Opinion of Probable Construction Cost is estimated between 9.5 million and 10.5 million dollars, with a projected Notice to Proceed in January 2026.
The contract requires a 365-day completion timeline, with liquidated damages set at 1,550 dollars per day for delays. Bidders must provide a bid bond equal to 5 percent of their maximum bid price and must meet strict prequalification requirements for specialized work, including water transmission, augur boring, cathodic protection, and asphalt paving. Additionally, contractors must certify compliance with Texas Labor Code Section 406.096 regarding worker's compensation and submit a Conflict of Interest Statement. The solicitation was posted on August 27, 2025, with a response deadline of October 2, 2025.
General Info
Fort Worth seeks bids for water main installation costing 9.5-10.5 million dollars.
HighAI Summary for Addendum 1 00 72 00 General Conditions: This document contains the Standard General Conditions of the Construction Contract. It outlines the legal and operational framework for a construction project, including definitions, contractor responsibilities, payment terms, change orders, dispute resolution, and termination clauses. It serves as a foundational specification for the agreement between the City and the Contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Fort Worth Standard Construction Specification Documents - Table of Contents: This document is the Table of Contents for the City of Fort Worth's Standard Construction Specification Documents. It lists general conditions (Division 00), general requirements (Division 01), and various technical specifications across multiple divisions including existing conditions, concrete, electrical, earthwork, exterior improvements, and utilities. It identifies specific modified sections for the project and provides references to the City's website for full technical specifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City Project No. 105114 - Addendum No. 1 - Northside IV 24-inch Water Transmission Main: Addendum No. 1 issued September 18, 2025, for the Northside IV 24-inch Water Transmission Main Phase 1C - Segment 3 project. It modifies several specification sections (00 21 13, 00 45 12, 00 52 43, 00 72 00), adds specification 00 45 26, and clarifies that M/WBE goals are no longer applicable. It also provides the Engineer's Opinion of Probable Construction Cost ($9.5M to $10.5M) and notes a projected Notice to Proceed in January 2026. Bid opening is scheduled for October 02, 2025.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City Project No. 105114 - Addendum No. 3: Addendum No. 3 issued on September 30, 2025, for the Northside IV 24 inch Water Transmission Main Phase 1C - Segment 3 (City Project No. 105114). This document modifies the original contract documents by updating the Table of Contents and revising specifications 00 42 43, 32 01 17, and 32 01 18 regarding bid list items, pavement removal, and flex base requirements.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for City Project No. 105114 - Northside IV Water Transmission Main Phase 1C Agreement: This is a formal agreement between the City of Fort Worth and a Contractor for the Northside IV Water Transmission Main Phase 1C - Segment 3 (Project No. 105114). The document outlines the scope of work, contract price, a 365-day completion timeline, liquidated damages of $1,550.00 per day, and comprehensive indemnification clauses. It lists the required contract documents, including bid forms, bonds, and specifications.
XLSX
XLSX, High priority: read this firstrfb
HighAI Summary for Project 105114 - Bid Proposal Workbook: This document is a Bid Proposal Workbook for the City of Fort Worth, Project No. 105114, titled 'Northside IV Water Transmission Main Phase 1C- Segment 3'. It includes Section 00 35 13 (Conflict of Interest Statement) and Section 00 41 00 (Bid Form), requiring bidders to certify compliance with state law and accept the terms and conditions of the invitation to bid.
XLSX
XLSX, High priority: read this firstrfb
HighAI Summary for Project 105114 - Northside IV Water Transmission Main Phase 1C- Segment 3 Bid Proposal Workbook: This document is a Bid Proposal Workbook (Addendum 2) for the City of Fort Worth project 'Northside IV Water Transmission Main Phase 1C- Segment 3' (Project No. 105114). It includes Section 00 35 13 regarding Conflict of Interest Statements and Section 00 41 00, which is the formal Bid Form containing bidder acknowledgments, certifications, and agreement terms.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Section 00 21 13 Instructions to Bidders: This document provides the 'Instructions to Bidders' for a City project, detailing defined terms, bidding document access, and strict prequalification requirements for prime contractors and subcontractors. It specifies required qualifications for paving, lighting, and water/sewer work, and outlines the bidder's responsibility to examine contract documents and conduct site visits prior to bid submission.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Section 00 43 13 Bid Bond - Northside IV Water Transmission Main Phase 1C- Segment 3: A formal bid bond template for the Northside IV Water Transmission Main Phase 1C- Segment 3 project. The document establishes a penal sum of 5% of the bidder's maximum bid price to guarantee that the winning bidder will execute the contract with the City of Fort Worth, Texas.
PDF
PDF, High priority: read this firstprequalification
HighAI Summary for Section 00 45 12 Prequalification Statement: A prequalification statement form requiring bidders to identify and certify the prequalified contractors and subcontractors they intend to use for specific major work types, including augur boring, cathodic protection, water transmission, and asphalt paving.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 01 17 Permanent Asphalt Paving Repair: Technical specifications for permanent asphalt paving repairs for the City of Fort Worth, dated 09.24.25. The document details requirements for flexible pavement repair, including utility cuts and warranty work, and provides comprehensive measurement and payment procedures for various repair types and widths.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 01 18 Temporary Asphalt Paving Repair (Mod 09.24.25): Technical specifications for temporary asphalt paving repairs for the City of Fort Worth, updated September 24, 2025. The document details requirements for utility cuts, contractor-caused damage repairs, measurement and payment procedures (linear foot), and material standards for flexible base and H.M.A.C. Type D paving.
PDF
PDF, Low priorityother
LowAI Summary for Section 00 35 13 Conflict of Interest Statement - City of Fort Worth: A compliance document from the City of Fort Worth requiring bidders to complete or certify a Conflict of Interest Questionnaire (CIQ) or Local Government Officer Conflicts Disclosure Statement (CIS) in accordance with state law.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Section 00 45 26 - Contractor Compliance with Worker's Compensation Law (Project No. 103416): A certification form requiring the contractor for City Project No. 103416 to certify compliance with Texas Labor Code Section 406.096 regarding worker's compensation insurance coverage for themselves and their subcontractors.