Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

PW 2022 Bond Year 3 Contract 18, City Project No. 104324

Active
26-0321State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

City Project No. 104324, known as 2022 Bond Year 3 Contract 18, is a public works solicitation issued by the City of Fort Worth, Texas, for comprehensive water, sewer, and paving improvements. The scope of work includes the installation of approximately 6,500 linear feet of 8-inch water pipe and 2,400 linear feet of 8-inch sewer pipe, along with 6,500 square yards of pulverization and asphalt overlay, 7,000 square yards of concrete pavement, 20,000 square feet of concrete sidewalk, and 21,500 square feet of concrete driveway. The project involves work across multiple locations, including Avenue K, Tension Drive, Roselane Street, and Old Handley Road. The contract will be awarded to the lowest responsible and responsive bidder. Eligibility requires bidders to be prequalified or submit documentation seven days prior to the bid opening, with bidding capacity determined by a factor of ten times the positive net working capital. Bidders must submit their proposals electronically via the Bonfire portal by October 22, 2026, including a Small Business Utilization Form demonstrating a commitment to the City's 30 percent small business goal. Required documentation includes bid bonds, conflict of interest statements, and certifications of compliance with Texas worker's compensation laws and prevailing wage requirements under Texas Government Code Chapter 2258. Upon award, the contractor must provide performance, payment, and maintenance bonds, as well as a valid insurance certificate within 14 days. Performance begins upon the issuance of a Notice to Proceed, which occurs no earlier than 14 days after the agreement's effective date. The contractor is responsible for providing all labor, materials, and equipment, adhering to strict quality standards for earthwork and structural alignment, and submitting a baseline construction schedule five working days before the preconstruction meeting.

General Info

Fort Worth public works contract for water, sewer, and paving improvements due 10/22/2026.

Documents

(10)

00 45 11 Bidders Prequalifications - City of Fort Worth

PDF•3 pages•prequalification

2022 Bond Year 3 - Contract 18: Water, Sewer, and Paving

PDF•specifications

City Project No. 104324 - Contract 18 Specifications

PDF•specifications

Project 104324 - Bid Proposal Workbook

XLSX•12 pages•rfb

Project 104324 - Small Business Utilization Form

XLSX•7 pages•other

Project No. 104324: 2022 Bond Year 3 Contract 18 Invitation to Bidders

DOCX•3 pages•itb

Section 00 45 26 - Contractor Compliance with Worker's Compensation Law (Project No. 104324)

DOC•1 page•wage-determination

Submission Instructions - 26-0321

DOCX•5 pages•submission-instructions

City of Fort Worth - Bid Documents Package Folder Contents Checklist

PDF•1 page•other

Section 00 45 13 Prequalification Application

PDF•prequalification

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / AgencyTexas → City Of Fort Worth
Office AddressTX, USA
ContactsNo contact information available

Interested Companies (1)

Show more
No data available in table

Full Description

Show more
The major work will consist of the (approximate) following: *6,500 LF 8” water pipe by open cut* *2,000 LF 8” sewer pipe by open cut* *400 LF 8” sewer pipe by other than open cut* *6,500 SY Pulverization and asphalt overlay* *7,000 SY concrete pavement* *20,000 SF concrete sidewalk* *21,500 SF concrete driveway*

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing facilities. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, along with the excavation of cobbles and large boulders. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The prime contractor is actively encouraging M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and equipment procurement for qualified subcontractors.
James W. Fowler Co.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity targeting DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the use of consortia for larger contract portions. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors must agree to the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company. The prime contractor may require payment and performance bonds totaling 100 percent of the bid, with bond premiums reimbursed up to a maximum of 1.5 percent. The primary point of contact for this solicitation is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 5 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 336411
New
SLED
RFI/Sources Sought- Drone as First Responder Program
Solicitation # 26-0323
The City of Fort Worth is conducting a market research effort through Request for Information 26-0323 to identify qualified firms and available solutions for a citywide Drone as First Responder (DFR) program. The primary objective is to implement a system capable of rapid unmanned aircraft deployment to improve situational awareness for emergency personnel, targeting an average response time of approximately 90 seconds. This RFI seeks information on comprehensive hardware and support services, including aircraft, docking pods, command-and-control infrastructure, detect-and-avoid equipment, and necessary FAA regulatory pathways such as 14 CFR Part 107 or Certificates of Waiver or Authorization for beyond visual line of sight operations. Key requirements emphasize high standards for cybersecurity and regulatory compliance, specifically requesting CJIS Security Policy alignment, U.S.-based data storage and processing for criminal-justice data, and adherence to NDAA or DIU Blue UAS status. The City is seeking detailed technical recommendations on aircraft capabilities, safety systems like parachutes and geofencing, and industry-standard acceptance-testing practices. While the City is requesting nonbinding budgetary pricing and implementation timelines for planning purposes, this notice is for information gathering only and does not constitute a formal solicitation for award. Responses are due by October 14, 2026.
Aircraft Manufacturing

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS