This Solicitation opportunity from Texas was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PW CSP - C01239 - Mary's Creek Water Reclamation Facility
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Fort Worth is soliciting bids for the construction of a new 10-million gallons per day greenfield Mary’s Creek Water Reclamation Facility located at 11091 Chapin Road, Texas. The project encompasses a comprehensive array of water treatment infrastructure including equalization and peak flow storage basins, preliminary and biological treatment units with membrane tanks, chemical feed and storage systems for ferric sulfate, supplemental carbon, and sodium hypochlorite, ultraviolet disinfection, cascade aeration, sludge handling facilities with thickening and dewatering equipment, odor control systems, operations and electrical buildings, and a reuse and service water pump station. Site work includes civil construction such as grading, paving, vaults, excavation, and yard piping, along with instrumentation, controls, and physical security systems to ensure integrated operational functionality. A portion of major equipment has been preselected, with bid details provided in appendices, and all work must align precisely with construction drawings and adhere to strict technical standards including NEC, NFPA, ASTM, ASME, and UL requirements. The contractor is responsible for full system integration, including design, supply, installation, start-up, and commissioning of all mechanical and electrical components, with no additional cost for coordination or integration tasks. All equipment must be packaged and shipped in accordance with manufacturer guidelines, using padded cradles, wooden blinds on flanges, and rigid end protection, and must be preserved against moisture, corrosion, and physical damage during transit and storage. Markings must follow ASME A13.1 standards for labeling, with internal markings required for pipes 24 inches and larger. Inspections occur at both origin and destination, with formal acceptance contingent on successful Site Acceptance Testing after a 30-day performance test and a 5-day functional test. Submittals must include detailed documentation such as P&IDs, schematics, test reports, manufacturer certifications, and as-built drawings, all bound in compliance with specified formats and delivered in OCR PDF, OpenDocument, or CSV formats on optical media, alongside five sets of signed and sealed hard-copy drawings. Key personnel—including a Project Manager, Engineer, Lead Technician, and Quality Assurance Reviewer—must be identified with resumes and commitments, and the contractor must demonstrate at least 15 years of experience in building automation systems. Payment terms, contract type, and total value are not specified in the available data, though invoicing and financial accounting details such as AAC, TAS, or ACRN codes are also absent, and
General Info
Place of Performance
TX, USASet-Aside
Documents
22AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
- Lift Station No. 85 ReplacementOpen now, due in 28 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Texas → City Of Fort Worth
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS