PWC Mosquito Raptor Mew Build
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Ohio Department of Natural Resources is soliciting bids for the construction of four raptor mews at Mosquito Lake State Park. The project requires the contractor to handle all grading, excavation, framing, roofing, flooring, utility installation, and finishing work. The scope includes two 12x16 foot mews and two 8x8 foot mews, all featuring 3-inch pea gravel floors and reinforced welded-wire mesh with pressure-treated lumber framing. Specific requirements include species-appropriate enclosure heights of 8 to 10 feet, viewing mesh areas, raptor perches, and drainage considerations. One of the larger mews must also include interior lighting and two wall outlets. The contract will be awarded to the lowest responsive and responsible bidder, with preferences applied for Buy American, Buy Ohio, and certified veteran-friendly businesses. The successful contractor must provide a performance bond equal to or greater than the total contract payments and maintain commercial general liability and business automobile liability insurance with a minimum aggregate limit of 2 million dollars. Additionally, the contractor must comply with Ohio prevailing wage laws and ensure all services are performed within the United States. Invoices must be submitted to Financial Shared Services with the identifier Origin-DNR-N13, and payments are generally due within 30 calendar days of acceptance.
General Info
Place of Performance
OH, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Building maintenance service
Items 1 | Required Item | Raptor Mew Build | see scope document | Estimated usage: 1.00000 | Unit: AMT | Requested delivery: 4/2/2027
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
