Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on December 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PWC SE L Pike Lake Directional Drill Sewer Line for Manholes

Closed
SRC0000027092State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Ohio Department of Natural Resources has issued a contract aimed at replacing approximately 200 feet of 8-inch clay tile sewer line at Pike Lake State Park using trenchless technologies. The objective is to minimize disruption to the park's operations while preserving the integrity of the landscape as part of their mission to manage and conserve Ohio's natural resources. The contractor will be responsible for making necessary connections and repairs to existing manholes, and ensuring that any damage to landscaping or turf during the construction process is fully remediated and re-seeded upon completion of the project. The project must be carefully scheduled through the park office to avoid interference with cabin and lodge reservations, and contractors are required to access the site by appointment from Monday through Friday between 8 AM and 4 PM. The completion deadline for this work is set for May 31, 2025, at Pike Lake State Park, located at 1847 Pike Lake Road, Bainbridge, OH 45612. Interested bidders must visit the site during the specified hours to familiarize themselves with the facility, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders are required to provide examples of similar completed projects and must undertake a pre-award meeting with the appropriate DNR staff to ensure mutual understanding of materials and scope. Additionally, failure to bid on all items listed may result in the bidder being deemed non-responsive.

General Info

Contract for replacing sewer line at Pike Lake State Park with minimal disruption, due May 2025.

Documents

6

Addendum to Bid Quote for Ohio Department of Natural Resources

PDF, High priority: read this firstamendment
High

Affirmation and Disclosure Form 4-17-24

PDF, High priority: read this first2 pages · affirmation-and-disclosure-form
High

Pike Lake Sewerline Directional Drill Repairs RFQ

PDF, High priority: read this firstrfq
High

Standard Terms and Conditions 3-1-24

PDF, High priority: read this first15 pages · standard-terms-and-conditions
High

Ohio Buys New Bidder Registration Guide

PDF, Low priorityother
Low

Ohio Buys Viewing and Responding to Solicitations Guide v2.0

PDF, Low priority23 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Pike Lake State Park
Contacts1 person available
OfficeN/A
Organization / AgencyOhio → Pike Lake State Park
Office AddressN/A
Contacts

Full Description

Show more
Pike Lake Directional Drill Sewer Line for ManholesOrdering Location and Address: Pike Lake State Park 1847 Pike Lake Road Bainbridge, OH 45612                          Project Background:  We need to have approximately 200 feet of 8” clay tile sewer line replaced by trenchless technologies. Work should include all appropriate connections and repairs in our existing manholes. Work must be scheduled though the park office as not to interrupt cabin and lodge reservation. Any damage to landscaping and/or turf in the area to be remediated and re-seeded upon project completion. Site can be accessed Monday-Friday 8AM to 4PM by appointment. Call Pike Lake office at +1 (555) 000-0000 to schedule. Delivery: Pike Lake State Park 1847 Pike Lake Road Bainbridge, OH 45612                          contact@example.gov Office +1 (555) 000-0000 Completion/Delivery Date: Prior to May 31, 2025.Site Visit & Point of ContactPrior to submitting a bid response, offerors are REQUIRED to visit.   Site can be visited Mon-Fri 8am-4pm by appointment to ensure staff is available call +1 (555) 000-0000 to schedule.Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Project AwardFor bids involving service projects on DNR property, the lowest apparent bidder will be required to provide 2 examples of similar completed projects including photos.  Provide the person’s name, organization name, phone number and email address for each project example.  In addition, the bidder must complete a pre-award meeting with appropriate DNR staff to ensure that the materials and scope are mutually understood. Evaluation.  The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.Contract Award.  The contract will be awarded to the lowest responsive and responsible bidder by low lot total.  Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS