Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

RACK, LOADING, GUIDED

Awarded
SPE4A625V385KFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract, awarded to LUNA METAL WORKS LLC under CAGE code 4W9C2 with solicitation number SPE4A625V385K, was issued by the Defense Logistics Agency Aviation office in Richmond, Virginia, and is associated with a single line item for a RACK, LOADING, GUIDED identified by National Stock Number 1440-01-360-8218. Despite an initial award date of July 16, 2026, the contract was administratively modified on June 26, 2025, through Standard Form 30 to cancel the sole line item, reducing the total contract value to zero. The modification was executed under FAR 43.203(b) and FAR 13.302-4(b), indicating the use of simplified acquisition procedures for administrative adjustments. The contractor, located in San Antonio, Texas, was originally expected to deliver one unit by December 15, 2025, but delivery failed, leading to cancellation. No other line items, options, or supplemental clauses are included, and the contract currently holds no financial obligation. Packaging, preservation, and marking requirements are implied through the use of NSN and barcodes consistent with DoD logistics standards, though specific MIL-STD references or detailed instructions are not provided. The contracting officer, Monica Green, holds authority for acceptance, while no designated COR or COTR is listed. Payment and accounting details, including AAC, TAS, or ACRN, are referenced as being on a continuation sheet and remain unspecified. Invoicing procedures, FOB terms, and delivery locations beyond the contractor’s address have not been formally documented. The awardee's size status and socioeconomic certifications are unverified, and although a CAGE code is provided, UEI information is absent. All evaluations, representations, and special requirements typically found in acquisition documents are either omitted or not included in the provided modification, making this a purely administrative adjustment with no active performance or financial commitment.

General Info

LUNA METAL WORKS LLC to supply guided loading rack under DLA contract awarded July 16, 2026.

Agency

Department Of Defense → Defense Logistics AgencyView Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(1)

Modification P00001 to Contract SPE4A625V385K - Purchase Order Cancellation

PDFmodification

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
ContactsNo contacts available
OfficeUSA
Organization / Agency
Department Of Defense → Defense Logistics Agency
View Agency Profile
Office AddressUSA
ContactsNo contact information available

Full Description

Show more
DLA award SPE4A625V385K posted on DIBBS. Awardee: LUNA METAL WORKS LLC (CAGE 4W9C2) Total Contract Price: See Award Doc Award Date: 07-16-2026 Line items: - RACK, LOADING, GUIDED (NSN/Part 1440013608218)

Similar Contracts

Same NAICS industry code

NAICS: 332312
New
Federal
EOU Sunshades Creech AFB
Solicitation # F4FANG6133A001
The Experimental Operations Unit at Creech Air Force Base is soliciting a firm fixed price contract for the design, procurement, and installation of four new CCA shade structures on the south ramp of the aircraft parking apron. Each new structure must feature four aircraft parking bays, LED lighting powered by a photovoltaic array with a 12-hour battery pack, service power outlets, and a solar battery powered obstruction light. The design must also include a vertical wall panel on the west end to provide afternoon shade and utilize double bolted connections for structural safety. In addition to the new construction, the contractor is responsible for relocating four existing sunshades to align perpendicularly with the new structures and demolishing one existing sunshade. This procurement is a total small business set aside under NAICS code 332312, with the award based on the lowest-priced, technically acceptable (LPTA) offer. The contractor is responsible for all design phases, including stamped calculations and FAA submissions, and must comply with the Buy American Act and various building codes such as the IBC and NEC. The total period of performance is 210 days after the award, consisting of 90 days for design and 120 days for construction. Performance takes place at Creech AFB in Nevada, requiring strict adherence to airfield safety protocols, including the use of hearing protection and the coordination of security escorts for personnel without appropriate clearances.
FA4861 99 Cons Lgc

POSTED

1 day ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency