Railtown Oil Pit Fence Repairs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation and reinstallation of fence alignments along the east and north faces of the Oil Pit at Railtown 1897 State Historic Park to enhance safety and facilitate secure access for park staff. All work will be restricted to the existing stairway area and will reuse existing holes without additional excavation or concrete encasement, in full compliance with the Secretary of the Interior's Standards for Rehabilitation. On the east face, three vertical boiler tubes sourced from on-site stock will be impact-driven into existing holes with their tops positioned 43 inches above ground, while four additional boiler tubes will be cut to approximately 12 feet to serve as top and lower rails. These rails will be secured using threaded T-fittings and elbows, with the lower rails welded directly to the vertical posts. Any disturbed earth will be backfilled with surrounding soil and rocks to restore the original ground appearance. On the north face, two boiler tubes will be cut to about 10 feet in length to form the top and lower rails, which will be attached using threaded fittings and welded to the existing vertical posts, eliminating the need for additional posts by leveraging the north-most posts from the adjacent east and west fence alignments.
General Info
Agency
NAICS
Place of Performance
5th ave, 7th ave, CA, 95327Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
