Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Raleigh Road Drainage Improvements

Closed
26-3030-6256State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The Raleigh Road Drainage Improvements project seeks to address significant flooding issues caused by an undersized existing drainage system, which has led to upstream catch basins flooding into private properties. The project aims to enhance the capacity and conveyance of the closed drainage system along the corridor to mitigate these flooding problems. The solicitation for this work, identified by the number 26-3030-6256, was issued by the Virginia Engineering office in Newport News and posted on January 30, 2026, with a response deadline set for February 27, 2026. Key contacts for the project include Kersha Aerga, the Procurement Manager, and Natalie Minton, the Procurement Services Specialist, who are available for inquiries and further information. This solicitation falls under a government agency setting and involves furnishing construction-related services to improve local infrastructure, specifically targeting stormwater management and property protection from flooding. The project documentation implies the necessity for a contractor able to efficiently handle the scope of work, adhering to timelines and regulatory guidelines to ensure the successful expansion and reliability of the drainage system in the affected area.

General Info

Raleigh Road Drainage Improvements project to mitigate flooding by enhancing drainage system capacity, bids due February 27, 2026.

Documents

6
PDF, High priority: read this first26 pages · ifb
High
PDF, High priority: read this first11 pages · specifications
High
PDF, High priority: read this first156 pages · construction-standards
High
PDF, High priority: read this first6 pages · contract-document
High
PDF, Low priority26 pages · drawings
Low
PDF, Low priorityother
Low

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Engineering
Contacts2 people available
OfficeNewport News, VA, 23607, USA

Interested Companies (12)

Allan MyersGlen Allen, VA
Builders & Contractors ExchangeNorfolk, VA
Direct SuretyFoster City, California

See All 12 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The existing system within the project site has been determined to be undersized because of noticeable flooding of the upstream catch basins into private properties. This project is intended to provide added capacity/conveyance to the closed drainage system to mitigate flooding along the project corridor.

More opportunities from Virginia → Engineering

Same awarding agency

NAICS: 237310
SLED
Denbigh Boulevard Sidewalk from Old Denbigh Boulevard to Woodside Lane
Solicitation # 27-1194-6256
The City of Newport News is soliciting bids for the construction of pedestrian enhancements on Denbigh Boulevard, extending from Old Denbigh Boulevard to Woodside Lane. The project involves installing an eight-foot wide sidewalk on the southerly side of the street, along with ADA-compliant ramps and pedestrian signals at marked crosswalks to improve bicycle and pedestrian safety. The scope of work includes the removal of existing asphalt and rigid pavement, installation of VDOT CG-6 combination curb and gutter, and the implementation of erosion and sediment control measures. This is a City-administered VDOT project that must adhere to VDOT technical specifications, the 2020 VDOT Road and Bridge Specifications, and the Virginia Erosion and Sediment Control Regulations. The contract will be awarded to the lowest responsive and responsible bidder based on price, capacity, skill, and past performance. Bidders must submit a bid bond of 5% for bids exceeding $100,000 and provide a minimum $2,000 bond for land disturbing permits. The project is subject to Davis-Bacon Act prevailing wage rates and requires compliance with the Buy America Act and BABA requirements. Contractors must utilize the City's Projectmates system for electronic invoicing and subcontractor reporting, with default payment terms of Net 30 Days. The project also mandates strict adherence to EEO policies and cybersecurity standards for any network-capable devices installed. There is no set-aside status specified for this solicitation.
Highway, Street, and Bridge Construction

POSTED

18 days ago

DEADLINE

in 18 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS