Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Ralph W. Chapman Water Reclamation Facility (Rwcwrf) — Tertiary Filters Improvement Project (Cip R2172 & R2173)

Open
20261117031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ralph W. Chapman Water Reclamation Facility (RWCRWF) Tertiary Filters Improvement Project, identified as CIP R2172 & R2173, is a solicitation by the Otay Water District for specialized engineering work in Spring Valley, California. The scope of work includes the design, submittal, approval, removal, disposal, and replacement of four tertiary filter washwater troughs and their mounting brackets. Additionally, the contractor is responsible for furnishing and installing a stainless steel lateral bracing system for each filter, the legal disposal of spent filter media, the replacement of filter media in kind, and the full restoration of affected facilities. The engineer's estimate for this project is 500,000 USD. To be eligible for award, contractors must possess a valid Class A General Engineering Contractor’s License and be registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. The project is subject to prevailing wage requirements and DIR compliance monitoring. Bids must be submitted electronically via PlanetBids by December 17, 2026, and must include a bid bond of at least 10% of the total bid. Upon award, the contractor is required to provide both a Performance Bond and a Labor and Materials Payment Bond, each for 100% of the contract price. There are no set-aside designations for this procurement.

General Info

Otay Water District seeks engineering for tertiary filter improvements at RWCRWF facility.

Place of Performance

Spring Valley, CA, 91978, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstifb
High

Read the document

Due in 29 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 29 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Otay Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The project involves the design, submittal, approval, removal, disposal, and replacement of four (4) existing tertiary filter washwater troughs (2 per filter) and associated mounting brackets. It also includes the furnishing and installation of a stainless steel lateral bracing system for each filter, removal and legal disposal of spent filter media, replacement of filter media in kind, and restoration of affected facilities to the satisfaction of the District. All work must be completed in accordance with the Contract Documents at the District's RWCWREF.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days
View Details

More opportunities from California → Otay Water District

Same awarding agency

NAICS: 237110
New
SLED
Ralph W. Chapman Water Reclamation Facility (Rwcwrf) – Tertiary Filters Improvement Project
Solicitation # R2172 & R2173
The Ralph W. Chapman Water Reclamation Facility Tertiary Filters Improvement Project, solicited by the Otay Water District under bid numbers R2172 and R2173, involves the design, removal, and replacement of four existing tertiary filter washwater troughs and their associated mounting brackets. The scope of work includes furnishing and installing stainless steel lateral bracing, removing and legally disposing of spent filter media, replacing the media, and restoring all affected facilities. The contractor is responsible for providing all labor, tools, equipment, and materials, ensuring that all work complies with the Uniform Building Code, OSHA regulations, and the Water Agencies Standard Specifications. Design calculations must be certified by a Professional Civil or Structural Engineer licensed in California. The contract will be awarded to the lowest responsive and responsible bidder. Successful contractors must provide a bid bond, performance bond, and labor and materials bond, and must adhere to California Department of Industrial Relations prevailing wage rates. Project management requires a cost-loaded CPM schedule updated monthly, with monthly narrative progress reports and invoicing submitted on the Owner's form. Quality control involves District inspections after delivery and throughout construction, with final acceptance contingent upon the completion of a punch list, submission of record drawings, and the provision of unconditional lien releases. Specific storage requirements for troughs include maintaining temperatures between 0 and 110 degrees Fahrenheit and stacking no more than three layers high on wood supports.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS