This Solicitation opportunity from Wisconsin was posted on December 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RAS Pump Improvements at South Shore Water Reclamation Facility
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive upgrade to the RAS (Return Activated Sludge) system at the South Shore Water Reclamation Facility, managed by the Milwaukee Metropolitan Sewerage District in Wisconsin. The scope includes replacing eight RAS pumps and motors, along with their suction and discharge piping, expansion joints, check valves, and isolation valves. It also covers the installation of new piping supports, transfer piping for RAS/WAS (Waste Activated Sludge), and eight variable frequency drives (VFDs) with enclosures. Additionally, the project entails providing two RAS pump monitoring panels, replacing switchboard breakers, and installing new conduit and wiring. Instrumentation and transmitters will also be replaced to ensure proper system operation. Further work includes removal of existing concrete, installation of new concrete equipment pads, masonry work, and the addition of doors and finishes. The project also involves painting and other tasks detailed within the contract documents. The total project value is estimated between five and ten million dollars, with a solicitation deadline of January 23, 2025. The primary point of contact is Nathan Churchill, reachable via email or phone, and the project is set to be performed within Wisconsin, adhering to the specifications outlined in the solicitation.
General Info
Place of Performance
WI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
• Replacement of eight RAS pumps and motors • Replacement of RAS pump suction and discharge piping • Replacement of expansion joints • Replacement of check valves and isolation valves • Providing piping supports • Replacement of RAS/WAS transfer piping • Replacement of eight variable frequency drives (VFDs) and enclosures • Providing two RAS pump monitoring panels • Replacement of eight switchboard breakers • Providing conduit and wiring • Replacement of instrumentation and transmitters • Removal of concrete • Providing concrete equipment pads • Providing masonry • Providing doors and finishes • Painting • All other work shown in Contract Documents
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
